cross section drawing in survey, Civil Engineering

Assignment Help:
how to draw cross section

Related Discussions:- cross section drawing in survey

Explain the installation of shock transmission unit, Explain the Installati...

Explain the Installation of Shock Transmission Unit? It is not always necessary to install STUs while a structure is under construction but the holding down anchor bolts and th

Determine the ultimate bearing capacity of a square footing, Determine the ...

Determine the ultimate bearing capacity of a square footing, 1 m × 1 m, resting on saturated clay of unconfined compression strength of 180 kN/m 3 and a bulk density of 18 kN/m 3

Wall, picture of types of wall

picture of types of wall

Dynamical method of earthquake force analysis, Earthquake force analysis me...

Earthquake force analysis method Dynamical method In contrast with the static loading, dynamical analysis method is discussed. In this method, structure reflections at any poin

Show the side clearance of pipes in trenches, Side clearance of pipes in tr...

Side clearance of pipes in trenches From the design point of view, it's predominant to minimize the width of pipe trenches due to thebelow reasons: (i)  Higher cost of exca

Define categories of scaling-underwater inspection of bridge, Define the Ca...

Define the Categories of Scaling? Scaling is classified into following three categories: i. Light scale - loss of surface mortar up to 5 mm deep, with surface exposure of co

Lintel, Ask question #classfication of lintel Minimum 100 words accepted#

Ask question #classfication of lintel Minimum 100 words accepted#

Surface drainage, Surface Drainage: Surface drainage deals with arran...

Surface Drainage: Surface drainage deals with arrangement for quickly leading the water from rainfall away from the surface of pavements, shoulders, slopes of embankments and

Determine the final volume of the compacted soil, 30,000-yd 3 of banked so...

30,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite.  The soil has 28% swell and shrinkage of 18%.  The final volume of the compacted so

Surveying, earthen dam and gravity dam

earthen dam and gravity dam

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd