Q. Corrosion Assessment of Flare and VRU System?
The worst case scenario shall be considered during material selection of Flare KO Drums. Depending on the fluid composition entering the flare header and the liquid composition collected in the Flare KO Drum, it may be corrosive to CS material.
Corrosion shall be studied on a case by case basis and normal prevention method is to increasing the CA of Flare KO Drum (normally up to 4.8mm or 6.4mm for severe cases) or applying internal coating. Operating temperature shall be considered when specifying internal coating.
As there is always a liquid water phase present in the system, there is risk for wet H2S corrosion up to the Flare KO Drum. It is highly recommended to consider NACE requirement for the Headers and Flare KO Drums. HP KO Drum is recommended to receive PWHT to minimize risk of SSC and SOHIC. Clean steel shall also be used to reduce the risk of HIC. There is no need to use HIC resistant materials.
Dew point corrosion shall be considered by relevant vendor. Flare Tip shall be upgraded to 310SS to prevent high temperature oxidation and cold end corrosion.
The condensing phase prior to compression in VRU package is primarily water. Depending on the gas composition (CO2/H2S ratio), upgrading the metallurgy to 316L SS may be necessary. The entire VRU package shall be in full compliance with NACE requirements.
Explain the uses of Pier and Well Foundations Well foundations are used to transmit large loads from piers of bridges and other marine structures. These are constructions carr
A tensile test on a specimen having an initial diameter of 13.11 mm and an initial gauge length of 200.0 mm, gave the following data:
triangle law of forces
Compression Ratio (r): It is the ratio of the total cylinder volume when the piston is at the bottom dead centre, V t to the clearance volume, V C . R= v t /v c
Gear Complaints Nature of Complaints (a) Gear shifting hard (b) Gear slipping (c) Gear noise
Q. Process of Steam generation unit? BFW from water treatment area is sent to the BFW Booster pumps at temperature around 105°C. The BFW is then heated and fed to the HP BFW Pu
A rectangular plate has two holes of dimensions shown and is released from the position shown. The plate is hinged about a horizontal axis and can rotate in the vertical plane. An
Can you Differentiate between : Dynamometer and Brakes. Absorption Dynamometer and Transmission Dynamometer.
what is Otto cycle?
In a double acting vertical steam engine running at speed of 360 r.p.m., cylinder diameter is 25 cm, stroke is 30 cm, diameter of piston rod is about 3.75 cm and length of the conn
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd