Consolidated undrained or consolidated drained analysis, Civil Engineering

Assignment Help:

Question

In determining effectual stress parameters of a soil sample, which test is good, consolidated undrained analysis or consolidated drained analysis?


Answer


Effective stress parameters of a soil sample are able to be obtained from both consolidated undrained analysis and consolidated drained analysis. Though, consolidated undrained analysis is usually selected because of following reasons-

(i) Time occupied for consolidated undrained test is shorter than that of consolidated drained test. It is as consolidated drained analysis requires full dissipation of excess pore water pressure of soil throughout testing and it takes long time at what time soils of low permeability are experienced.

(ii) Useful information be capable of be obtained from stress path of consolidated undrained test.

(iii)Failure happens in worse stress level while compared with consolidated drained test.

 


Related Discussions:- Consolidated undrained or consolidated drained analysis

Design a water supply scheme for new railway colony, Q. Design a water supp...

Q. Design a water supply scheme for new Railway colony based on the following data's. i. Requirement of Loco and domestic consumption 5 lacs gallon per day. ii. Source of wat

I am expert i this field, i require a workquestion #Minimum 100 words acce...

i require a workquestion #Minimum 100 words accepted#

Define hardness - chemical characteristics of water, Define Hardness - Chem...

Define Hardness - Chemical Characteristics of Water Caused by any polyvalent cations (mainly Calcium and Magnesium). Expressed as mg/l as CaCO 3 . Causes precipitates with soap

Mapping, how to understand maps easily?

how to understand maps easily?

I have a take home quiz, Hello I have a take home final needs be ordered, d...

Hello I have a take home final needs be ordered, do you have very well skilled professionals to make it?

Determine the reliable moment capacity, Figure 2 details a typical T-beam u...

Figure 2 details a typical T-beam unit in a beam and slab floor with a span of L = 10 m. Determine the reliable moment capacity M ′ for the T-section shown. Take f c ′ = 32

Define in brief about the term - concrete, Define in brief about the term -...

Define in brief about the term - Concrete Concrete is reinforced with steel bars in structural components so that the tensile stresses are taken up by the reinforcement. These

Rcc, difference between RCC and RBC

difference between RCC and RBC

Determine the cost of compensation, The soil in a borrow pit has a void rat...

The soil in a borrow pit has a void ratio of 0.90. A fill-in-place volume of 20,000 m 3 is to be constructed with an in-place dry density of 18.84 kN/m 3 . If the owner of borr

Delay of bituminous laying on top of sub-base, Question In case if ther...

Question In case if there is a delay of bituminous laying on top of sub-base, have to tack coat be applied on the top surface of sub-base? Answer When there is a d

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd