Question
In determining effectual stress parameters of a soil sample, which test is good, consolidated undrained analysis or consolidated drained analysis?
Answer Effective stress parameters of a soil sample are able to be obtained from both consolidated undrained analysis and consolidated drained analysis. Though, consolidated undrained analysis is usually selected because of following reasons-
(i) Time occupied for consolidated undrained test is shorter than that of consolidated drained test. It is as consolidated drained analysis requires full dissipation of excess pore water pressure of soil throughout testing and it takes long time at what time soils of low permeability are experienced. (ii) Useful information be capable of be obtained from stress path of consolidated undrained test. (iii)Failure happens in worse stress level while compared with consolidated drained test.
When a dam is to be built, a diversion tunnel is usually bored by solid rock next to the dam site to bypass the dam construction site. The dam is built while the river flows by the
Define the In-depth inspections for Bridge? In-depth inspection is a detailed inspection of one or more members below the water level to detect any deficiencies not readily app
how to calculate various quantities of materials for wet mix macadam and dense bitumen macadam
Define the Highlights of Critical Path Method A network analysis technique used to predict project duration by analyzing which sequence of activities has the least amount o
In construction of a two-span bridge (span length = L) by using span-by-span construction, why is the length of about 1.25L bridge segment is constructed in first phase of construc
what do mean by outstand element of compression flange, internal element of compression flange and web general
Five 1m diameter, 2m high cylindrical drums filled with earth are placed upright and side-by-side in a straight line across a 5m wide creek to form a simple dam completely blocking
centroid of shaded area
How to do assignment on the basis of azetropic mixture
while designing the lug angles with the channel section what does "the force not acccounted for by the direct connection of member" mean?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd