Question
In determining effectual stress parameters of a soil sample, which test is good, consolidated undrained analysis or consolidated drained analysis?
Answer Effective stress parameters of a soil sample are able to be obtained from both consolidated undrained analysis and consolidated drained analysis. Though, consolidated undrained analysis is usually selected because of following reasons-
(i) Time occupied for consolidated undrained test is shorter than that of consolidated drained test. It is as consolidated drained analysis requires full dissipation of excess pore water pressure of soil throughout testing and it takes long time at what time soils of low permeability are experienced. (ii) Useful information be capable of be obtained from stress path of consolidated undrained test. (iii)Failure happens in worse stress level while compared with consolidated drained test.
need help with my assignment. An Asian Pacific capital city proposes to design, construct and operate a new double track railway from the city to connect to its major airport. Pref
what are the basic reqiureents for stairs. explain the basic procedures for stair construction
how can Simulink calculate wave speed of water hammer
construction of arches
what is the heat of hydration and gel space ratio?
Plant Location and Facility Layout: This unit explain the general definition of Plant location and facility layout. Several factors affecting the location decision of a firm o
Particle Size Distribution (Gradation): The particle size distribution is determined by passing the aggregates through a set of standard IS sieves (Figure) and determining th
Resultant Force on a Given Area of a Horizontal Plane By equation, the total vertical force applied to an area A on the plane is: Resultant Force R = ΡA = (lb/ft 2 )(ft 2 )
Define Lead Lag Relationships 1. A lead is when the successor task begins before the predecessor task is complete 2. A lag is when a successor task does not
Explain Statically Indeterminate Structures Fall into two categories: 1. Beam problems with additional supports/restraints 2. Axial bar members subjected
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd