Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Connection of Shunt Capacitors at Distribution Transformer
Provision of capacitors at load point is found to be hard in practice because of the additional investments needed. It has also been experienced in which the LT motive power consumers do not ensure the working of capacitors even if these are given at the time of release of connections. The agricultural consumers are not keen to improve the power factor of their motors, as they are not benefited because of flat rate tariff. Further, the consumers do not have requisite knowledge and skill to decide the level of compensation and check the availability.
Although planning the distribution systems, such local practical problems could be taken care of through the power utilities by giving LT capacitors on distribution transformers. Switched or fixed capacitors at the distribution transformer are the further best alternative. The shunt capacitor supplies constant reactive power at its location, independent of the load. Thus, optimal compensation given for peak load condition might result in over compensation during light load conditions, necessitating automatic switching schemes.
Fixed capacitors are suitably selected for light load conditions and linked permanently. The automatic switched capacitor bank of rating appropriate for maximum kVA requirement of the concerned distribution system is installed along with essential provision of switching to suit the reactive demand of the system at any particular time. The switched capacitors could be switched off in steps and brought back in service as the reactive load on the system raise.
what are theold and new technologies of manufaturing of the harvestor. atleast of five components
the relation between power
Program counter holds the address of either the first byte of the next instruction to be fetched for implementation or the address of the next byte of a multi byte instruction, whi
1. Suppose the California government sets aside a square patch of land that is 10 kilometers on each side and plans to use this land to generate electrical power with wind turbines
Q. A magnetic circuit is found to have an ac hysteresis loss of 10 W when the peak current is Im = 2 A. Assuming the exponent of Bm to be 1.5, estimate Ph for Im = 0.5A and 8A.
Explain the factors affecting permeability and hysterisis loss. Factors affecting permeability and hysterisis loss: When the initial permeability is high, the hysterisis los
Simplify using k-map f(A,B,C,D)=?M(4,6,10,12,13,15) Using behavioral modeling in xilinx VHDL
explain detail about races and cycle
what is a mash current theoram
A dc series motor is connected to a load. The torque varies as the square of the speed.With the diverter-circuit open, the motor takes 20 A and runs at 500 r/min. Determine the mot
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd