Connection of Shunt Capacitors at  Distribution Transformer

Provision of capacitors at load point is found to be hard in practice because of the additional investments needed. It has also been experienced in which the LT motive power consumers do not ensure the working of capacitors even if these are given at the time of release of connections. The agricultural consumers are not keen to improve the power factor of their motors, as they are not benefited because of flat rate tariff. Further, the consumers do not have requisite knowledge and skill to decide the level of compensation and check the availability.

Although planning the distribution systems, such local practical problems could be taken care of through the power utilities by giving LT capacitors on distribution transformers. Switched or fixed capacitors at the distribution transformer are the further best alternative. The shunt capacitor supplies constant reactive power at its location, independent of the load. Thus, optimal compensation given for peak load condition might result in over compensation during light load conditions, necessitating automatic switching schemes.

Fixed capacitors are suitably selected for light load conditions and linked permanently. The automatic switched capacitor bank of rating appropriate for maximum kVA requirement of the concerned distribution system is installed along with essential provision of switching to suit the reactive demand of the system at any particular time. The switched capacitors could be switched off in steps and brought back in service as the reactive load on the system raise.


Related Discussions:- Connection of shunt capacitors at distribution transformer

Demultiplexer, How can i build 1-16 DEMUX using 1-8 DEMUX with logic gates ...

How can i build 1-16 DEMUX using 1-8 DEMUX with logic gates only ?

Calculate expected peak demand for transformer, What is the expected peak d...

What is the expected peak demand for a transformer feeding the following loads?                           Connected                 kVA

Excess3 to bcd code converter using nand gates, design a excess3 to bcd cod...

design a excess3 to bcd code converter using only nand gates

What is polyphase induction machine performance, Q. What is Polyphase Induc...

Q. What is Polyphase Induction Machine Performance? Some of the important steady-state performance characteristics of a polyphase induction motor include the variation of curre

Show frequency response using pspice and probe, Q. Show Frequency response ...

Q. Show Frequency response using pspice and probe? PSpice is capable of performing transient circuit analysis, for which the request is given by the following statement: • T

Gis application architecture, GIS application architecture: GIS applic...

GIS application architecture: GIS application architecture should 1  Give a framework and the essential programming interfaces to enable complex GIS applications to be deve

Instruction set architecture, assume that the top of the stack in the progr...

assume that the top of the stack in the program is pointed by the register sp.

Svd, svd calculation in matrix

svd calculation in matrix

Stakeholders - legal requirements for distribution licensees, Stakeholders ...

Stakeholders - Legal Requirements for Distribution licensees There have to be consultations among several stakeholders such as the licensees, the governments, consumers, gener

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd