Connection of Shunt Capacitors at Distribution Transformer
Provision of capacitors at load point is found to be hard in practice because of the additional investments needed. It has also been experienced in which the LT motive power consumers do not ensure the working of capacitors even if these are given at the time of release of connections. The agricultural consumers are not keen to improve the power factor of their motors, as they are not benefited because of flat rate tariff. Further, the consumers do not have requisite knowledge and skill to decide the level of compensation and check the availability.
Although planning the distribution systems, such local practical problems could be taken care of through the power utilities by giving LT capacitors on distribution transformers. Switched or fixed capacitors at the distribution transformer are the further best alternative. The shunt capacitor supplies constant reactive power at its location, independent of the load. Thus, optimal compensation given for peak load condition might result in over compensation during light load conditions, necessitating automatic switching schemes.
Fixed capacitors are suitably selected for light load conditions and linked permanently. The automatic switched capacitor bank of rating appropriate for maximum kVA requirement of the concerned distribution system is installed along with essential provision of switching to suit the reactive demand of the system at any particular time. The switched capacitors could be switched off in steps and brought back in service as the reactive load on the system raise.
For sign flag RP ( Return on Plus ) and RM ( Return on no minus ) Instructions RM returns from the subroutine to the calling program if sign flag is set (S=1). The in
main differnce of frequence analysi method
Preventive and Regular Maintenance Preventive and regular manages of components of the distributions system is necessary to reduce/eliminate breakdowns. Care should be taken t
Q. How does current flow through the channel of a JFET after pinch off? It is seen that above the pinch off voltage at a constant value of VDS (saturation drain current, ID inc
find the net value of power if an average value of energy is assumed to be $0.05/KWh, the capacity value is $30/kw-yr ...
Q. Draw the developed diagram of a simplex progressive 2 layer lap winding for a 4 pole generator with 12 coils clearly indicating the position of brushes. Sol. No. o
Q. Explain Steady-State Error of Linear Systems? If the steady-state response of the output does not agree exactly with the steady state of the input, the system is said to hav
circuit diagram of 2 bit magnitude comparator
Q. Show procedure of divide the decimal number by 2? For this procedure (method), divide the decimal number by 2, if the remainder is 0, on the side write down a 0. If the rema
HOW TO FIND THE OPERATING POINT OF THE TRANSISTO IN A COLLECTOR TO BASE BIAS CIRCUIT
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd