Carrying out repairs on lt and ht switch gear, Electrical Engineering

Assignment Help:

Precautions to be taken in carrying out repairs on HT and LT switch gear?

Ans: The following precautions to be taken in carrying out repairs on LT and HT switch gears.

a) Disconnect the power supply.

b) Discharge the lines by connecting earth.

c) Short the three phases with chain.


Related Discussions:- Carrying out repairs on lt and ht switch gear

Determine the speed at which the machine runs as a motor, A 100-kW, dc shun...

A 100-kW, dc shunt generator, connected to a 220-V main, is belt-driven at 300 r/min, when the belt suddenly breaks and the machine continues to run as a motor, taking 10 kW from t

Loss reduction and efficiency of electrical energy, Loss Reduction and Effi...

Loss Reduction and Efficiency Improvement of Electrical Energy 1. There are inherent losses in Transmission and Distribution of electrical energy from Generating station

Find current-voltage-resistance or power, 1.   Work out the  voltage for ...

1.   Work out the  voltage for the following arrangement of 1.5V cells : (to achieve a pass grade, solve problems with cells in series, parallel and series-parallel) 2.

Discuss the feature of pentium in brief, Discuss the feature of Pentium in ...

Discuss the feature of Pentium in brief. The Pentium is a 32-bit superscalar, CISC microprocessor.  The word superscalar is used for the processor that has more than one pipeli

Overcoming power shortages, Overcoming power shortages: NEP aims at me...

Overcoming power shortages: NEP aims at meeting both energy and peak demand fully through 2012 along within creating 5 percent spinning reserves at national level. The policy

Geographic information system, Geographic Information System: Geograph...

Geographic Information System: Geographic Information System (GIS) is a computer system capable of assembling, manipulating, storing, and displaying geographically referenced

Revenue loss due to loss of opportunity to serve, Revenue Loss Due to Loss ...

Revenue Loss Due to Loss of Opportunity to Serve The revenue loss because of "loss of opportunity to serve" is a extremely relevant but less visible aspect of revenue loss. Gu

Thunderstrom detector, Ask question #how to construct thunderstrom detector...

Ask question #how to construct thunderstrom detector with circuit breaker.

Cipper, when i/p voltg is grater than battery diode is clse or open

when i/p voltg is grater than battery diode is clse or open

Is the mosfetoperating in the active region, Q. A depletion MOSFET is given...

Q. A depletion MOSFET is given to have large V A , V P = 2.8V, I DSS = 4.3 mA, v DS = 4.5V,and v GS = 1.2V. (a) Is theMOSFEToperating in the active region? (b) Find iD.

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd