Calculate the percent change in load on the wall form tie, Civil Engineering

Assignment Help:

A concrete wall form tie with an ultimate strength capacity of 2,400-lbs is designed for use in a concrete wall form with an 18-in center to center spacing. During formwork inspection it was discovered that the actual spacing is 24-in center to center. Using the actual spacing, the percent change in load on the wall form tie is most nearly: 

765_Calculate the Percent Change in Load on the Wall form Tie.png

Solution:

Determine design tributary area: 1.5-ft x 1.5-ft = 2.25-ft2

Determine actual tributary area: 2-ft x 2-ft = 4-ft2

Determine design ft2 load:    2400-lbs / 2.25-ft2 = 1066.67-lbs/ft2

Determine actual load on 4-ft2:  1066.67- lbs/ft2 x 4-ft2 = 4266.68-lbs

Increase in load is:  4266.68-lbs - 2400-lbs = 1866.68-lbs

Calculate % change = 1 - (4266.68-lbs / 2400-lbs) = 78%

The load increase is 78% on the wall form tie.

 


Related Discussions:- Calculate the percent change in load on the wall form tie

Distomat., write a note on distomat

write a note on distomat

What is the group capacity, State the group efficiency of a rectangular gro...

State the group efficiency of a rectangular group of piles with 4 rows, 3 piles per row, the uniform pile spacing being 3 times the pile diameter. If the individual pile capacity i

cement, what is the manufacturing process of regular portland cemen

what is the manufacturing process of regular portland cement

How can rock sockets take up loads, Question How can rock sockets take ...

Question How can rock sockets take up loads? Answer Load transfer mechanism is brief as follows- While a socketed basis is loaded, conflict is provided by together

Determine the shearing resistance of sand, In a drained triaxial compressio...

In a drained triaxial compression test, a saturated specimen of cohesionless sand fails at a deviator stress of 450 kN/m 2 when the cell pressure was 135 kN/m 2 . Search the ef

Advantages of using top-down approach, Question What are major advantag...

Question What are major advantages of using top-down approach in basement construction? Answer The main advantages of top-down approach are listed below- (i) Stru

Diver qualification - diving operation for bridge inspection, Define Diver ...

Define Diver Qualification - Diving Operation for Bridge Inspection? The requisite qualification for divers and diving supervisors are given in IS 10291 -1982, which stipulates

Concrete cracking, Attached information shows construction details of a wat...

Attached information shows construction details of a water tank. The slab was poured in one pour and the walls (incl. Baffles) were poured in two even sections. Forms were stripped

Water treatment, The transmission main from the well field to the community...

The transmission main from the well field to the community is 2500 ft, the velocity of flow at peak pumping capacity is 3.5 fps, water temperature is 10oC, and pH is 7.5. If free c

Transportation issues, "We have one other pressing challenge that you could...

"We have one other pressing challenge that you could review for us," Alistair Wu says. "As you know, the Shanghai plant was our first facility in China, but we also have two other

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd