Calculate the percent change in load on the wall form tie, Civil Engineering

Assignment Help:

A concrete wall form tie with an ultimate strength capacity of 2,400-lbs is designed for use in a concrete wall form with an 18-in center to center spacing. During formwork inspection it was discovered that the actual spacing is 24-in center to center. Using the actual spacing, the percent change in load on the wall form tie is most nearly: 

765_Calculate the Percent Change in Load on the Wall form Tie.png

Solution:

Determine design tributary area: 1.5-ft x 1.5-ft = 2.25-ft2

Determine actual tributary area: 2-ft x 2-ft = 4-ft2

Determine design ft2 load:    2400-lbs / 2.25-ft2 = 1066.67-lbs/ft2

Determine actual load on 4-ft2:  1066.67- lbs/ft2 x 4-ft2 = 4266.68-lbs

Increase in load is:  4266.68-lbs - 2400-lbs = 1866.68-lbs

Calculate % change = 1 - (4266.68-lbs / 2400-lbs) = 78%

The load increase is 78% on the wall form tie.

 


Related Discussions:- Calculate the percent change in load on the wall form tie

Main function of followers in driven h-piles, Question What is main fun...

Question What is main function of followers in driven H-piles ? Answer A follower is an extension between pile head and hammers which transfers blow to pile in which

Survey, how can find forebearing

how can find forebearing

Basic considerations governing selection of road alignment, Basic Considera...

Basic Considerations Governing Selection of Road Alignment: The following considerations shall be kept in view in selecting the road alignment: Roads in Plain Areas (a)

Thermal coefficient, Thermal Coefficient Inside of the building's tempe...

Thermal Coefficient Inside of the building's temperature can increase or reduce the snow weight. As these types of structures normally cover a wide area and heating or even tur

Cumulative error, diffrence between cumilative compensative error

diffrence between cumilative compensative error

What is meaning of maintenance period, Question If contractor is likely...

Question If contractor is likely for defective works for 12 years with pact under seal, then what is meaning of Maintenance Period? Answer Faulty works constitute a br

Explain the hydraulic gradient, Explain the Hydraulic Gradient A measur...

Explain the Hydraulic Gradient A measurement of the movement of water over distances. Change in hydraulic head from one monitoring point to another.  i = ΔH/L  units are typ

Surveying, how to solve the problems of cross sectional surveying and profi...

how to solve the problems of cross sectional surveying and profil questions

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd