Q. Butt weld – from one side vs from both sides?

In the design of butt weld strength, it's normally presumed that its strength is at least equivalent to parent metal. To improve proper welding operation, gap between two metals to be welded must not be too small, or else the root will be inadequately fused at the time of welding and the butt weld strength will be decreased. Alternatively the gap must be not set too large since the weld metal would simply pass through it. Function of the gap amid adjoining root faces is to increase the depth of penetration down to the root of weld.

Though it's not always possible to have access to both sides of the butt weld. Therefore the use of backing plates or rings can improve the quality of welding from one side only. By inserting a backing plate inside the steel member, correct alignment could be maintained and specific amount of tolerance on longitudinal fit can be permitted.


Related Discussions:- Butt weld – from one side vs from both sides

Strength of Materials, How can I get theratio of the maximum deflections of...

How can I get theratio of the maximum deflections of a beam simply supported at its ends with an isolated central load and that of with a uniformly distributed load over its entire

Effect of footing size on stress zone, Q. Effect of Footing Size on Stress ...

Q. Effect of Footing Size on Stress Zone? The modulus of elasticity of the soil may be determined by plotting stress-strain diagram based on triaxial test or plate load test.

Structural analysis, steps to analysis a portal frame with sway condition

steps to analysis a portal frame with sway condition

Roads in marshy areas, Roads in Marshy Areas: The Problems Encounte...

Roads in Marshy Areas: The Problems Encountered Roads passing through marshy and swampy ground and waterlogged areas have stable ground generally in a saturated condi

Engg surveying, what does mean by too short and too long in erroneous tape ...

what does mean by too short and too long in erroneous tape length?

Harbour, typical layout showing dock,quay.jetties,turning circle,pier

typical layout showing dock,quay.jetties,turning circle,pier

Define the marine growth - underwater inspection of bridges, Define the Mar...

Define the Marine Growth - Underwater inspection of bridges? Bridges on many inland waterways are relatively clean and free of marine growth. However, there is likelihood of ma

Explain the tertiary treatment for wastewater, Explain the Tertiary Treatme...

Explain the Tertiary Treatment for Wastewater Tertiary Treatment: in cases where secondary treatment is not adequate (particularly if the discharges are into a sensitive water

Explain the activitated sludge (aeration tank), Explain the Activitated Slu...

Explain the Activitated Sludge (Aeration Tank)? The activated sludge treatment process is a biochemical oxidation process. Organic solids are stabilized through the oxidation p

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd