Estimation of loading carrying capacity, Civil Engineering

Assignment Help:

Question

While designing mini-piles, should strength of grout be disused during estimation of loading carrying capacity?


Answer

While designing min-piles, there will two approaches existing-

(i) In first approach, an axial conflict provided by grout is mistreated and steel bars take up design loads only. This advance is a conservative one that leads to use of high strength bars such as Dywidag bar. One has to note that bending moment is not planned to be taken up by min-piles since of its slender geometry.

(ii) In second approach, it involves loads to be taken up by together grout and steel bars together. In this way, strain compatibility condition of grout and steel has to be pleased.

 


Related Discussions:- Estimation of loading carrying capacity

#title, define distribution factor and shape factor

define distribution factor and shape factor

Keywords of airport management, Keywords of Airport management: Air T...

Keywords of Airport management: Air Traffic Control: A system by which air routes, flight rules for flying aircraft and navigational facilities are provided in an airport.

Underwater problems in bridge construction, Q. Underwater problems in bridg...

Q. Underwater problems in bridge construction? The major bridge construction materials are steel and concrete. In the past, stone and brick masonry, with lime mortar as binding

Road materials, Road Materials Earthwork and pavements constitute a si...

Road Materials Earthwork and pavements constitute a significant part of the cost of a road. Hence it is desirable that thorough investigations be done about the availability o

Dissimilarity b/w air chamber and surge tank, Question What is dissimil...

Question What is dissimilarity between air chamber and surge tank ? Answer Air chambers and surge tanks are usually set up in watermain to ease stress on schem

Matrix method of analysis, Ask question #Explalin a joint frame by stiffne...

Ask question #Explalin a joint frame by stiffness method

Lead products in construction, What are the advantages and disadvantages of...

What are the advantages and disadvantages of lead products in construction? Ans) Disadvantages: -Lead is very toxic; its use can result in pollution of the ground and more signi

Determine equipment purchase yields a minimum 15% return, A contractor esta...

A contractor established a policy to purchase equipment over leasing only if the return is a minimum of 15%. Given the following conditions, the contractor's decision based on the

Cross drainage work, Cross Drainage Work: Several natural streams, ri...

Cross Drainage Work: Several natural streams, rivers and canals cross the road. They have to be led across the road through culverts and bridges. That given structures is kno

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd