What is the difference between routing maintenance and major maintenance in school facilities?
Ans) The routine maintenance is the minor and consistent repairs that are engaged in the school premises. Examples could include painting, replacement of fixtures, louver blades, furniture repairs, and patching cracks in the school buildings.
The most maintenance could also be a total rehabilitation of the school, either school buildings or any other project within the school community. It could be total restructuring of the lighting system in the school or sanitary system.
Compression Members: Compression members in steel need special care in design. Steel possesses high strength in tension/compression; hence the sections are generally small com
study of cross staff
Light Rail Transit (LRT) Light Rail Transit is also known by the name train. LRT can be run on the surface if road space is available (as in Kolkata) or as elevated, with pil
chemical compositions of Rapid Hardening Cement
Quality Control of Concrete Roads: Concrete roads require a very high degree of quality control. The following aspects need to be checked regularly: (a) Strength, shape an
Q. What is Immediate Settlement? Strain in all coarse grained, dry or partly saturated fine grained soils occur immediately after the application of stress. Hence, this change
1 advantages and disadvantages of rise and fall methodes
Brick Pavement: In regions where stone aggregates are not available within economical leads, bricks provide a cheaper alternative. Flat-brick or brick-on-edge pavements provi
Q. Write short note on Open Foundation? Broadly the foundation are classified into open i.e. shallow & deep foundations open as stated are shallow foundation where the soil str
A contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working day
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd