Write a two part paper for project management

Assignment Help Project Management
Reference no: EM131154401

Write a two part paper for Project Management - Greendale Project ReDux.

1. Greendale Project ReDux

This assignment consists of two (2) parts: a project schedule, and a written response.

Submit both parts as separate files for the completion of this assignment. Label each file name according to the part of the assignment it is written for.

Part A: Project Schedule
(Submit as one [1] Microsoft Project file)

1. Create a multi-level work breakdown structure (WBS) and detailed project schedule, using the information from the "Greendale Stadium Case" located at the end of Chapter 6, and incorporating the following constraints.

Note: When you create your MS Project schedule, you will need to update your project per the following constraints:
o The project must consist of at least twenty (20) tasks.
o Each task must have a start and finish date that matches the duration noted in the assignment.
o Each task must be assigned to a resource (e.g., Demolishing Crew; Construction Crew; Landscaping Crew).
o Assume that the crew works during normal weekdays (no weekend work) under normal conditions (8 hours per day).
o In terms of holidays, you can assume no work will be done the following days: New Year's Day, President's Day, Good Friday, Good Monday, Friday before Memorial Day, Memorial Day, the business day before Independence Day, Independence Day, the Friday before Labor Day, Labor Day, the day before Thanksgiving Day, Thanksgiving Day, Black Friday (day after Thanksgiving), the business day before Christmas, Christmas Day, the business day after Christmas Day, and New Year's Eve.

Part B: Written Response
(Submit as a Microsoft Word file)
Respond to the following questions in a one to two (1-2) page paper based on your project schedule.
o When will the project be completed?
o What is the critical path for the project?
o How much slack / float is in your project? What activities have the greatest slack / float?
o Identify the top three (3) activities that you believe could impact the project completion date.
o What additional activities you would add to this project to make it more complete, from a project management viewpoint?

Format your assignment according to the following formatting requirements:
o Typed, double spaced, using Times New Roman font (size 12), with one-inch margins on all sides.

Reference no: EM131154401

Questions Cloud

Create measureable learning objectives to meet identified : For the assignment in this module, after you create measureable learning objectives to meet the identified training goal, you will need to brainstorm possible instructional strategies that can be implemented in the training in order to allow the l..
Find the current that must be supplied to the coil : A toroid with a circular cross section is shown in Figure P11.2.3. It is made from cast steel with a relative permeability of 2500. The magnetic flux density in the core is 1.25 T measured at the mean diameter of the toroid.
Explains differences between tactical and strategic analysis : Write a 3-5 page essay that thoroughly explains the differences between tactical, strategic, and administrative analysis. Include a description of your selected examples from the IACA site.
Different methods of measurement of power : What are the different methods of measurement of power in 3-phase circuit. Explain two wattmeter method in brief.
Write a two part paper for project management : Write a two part paper for Project Management - Greendale Project ReDux.- Part A: Project Schedule- Part B: Written Response.
Find the hysteresis loss in watts : The scale factors used are 1 cm = 0.03 T and 1 cm = 200 At/m. Find the hysteresis loss in watts.
Disadvantages of high voltage dc transmission : What are the advantages and disadvantages of high voltage DC transmission?
Applications of synchronous motors : How does a three-phase synchronous motor differ from a three-phase induction motor? Give a few applications of synchronous motors.
Discuss your own example of a business manager : In Chapter of ROI By Design, examples were provided to illustrate the following: the training request, identification of the key performance metric (KPM), identification of the standards of performance, connecting the KPM to the training goal, and..

Reviews

Write a Review

Project Management Questions & Answers

  Importance of data collection in project managementit is

importance of data collection in project managementit is important for the project manager to gather data on the work

  Adjustment for riskthis is a multiple choice questionrisk

adjustment for riskthis is a multiple choice questionrisk in a revenue-producing project can best be adjusted for bya.

  Pros and cons of six software systems

As part of the management team for PPQ Parts manufacturing company, you are tasked with selecting the best software packages for the firm's materials requirements planning (MRP), capacity requirement planning (CRP), and enterprise resource plannin..

  Evaluate the number of surfboards

Evaluate the number of surfboards to be produced in March and evaluate the number of pounds of fiberglass to be purchased in March.

  Explaining standard project scheduling technique

What are the implications of this regarding usage of any standard project scheduling technique?

  Evaluate a project budget

While the organizational goal is to operationalize project cost effectively, there are always trade-offs. The first thing to understand is how the project budget is calculated how do organizations evaluate a project budget?

  Calculate product yield of file cabinetsthe colonial house

calculate product yield of file cabinetsthe colonial house furniture company manufactures two-drawer oak file cabinets

  Project timelines critical path and pertyou are the general

project timelines critical path and pertyou are the general manager of a large construction project. the contract has

  Project management-schedule, budget, cost estimation

Prepare a project schedule in Microsoft Project 2007 and explain the rationale behind time and cost estimation methods and why you would chose one method over another

  Accounting project-financial analysis and real life decision

Ideas for situation that would fit this type of analysis other than those already provided

  Phase 1 planning 1 select a name for the company2 determine

phase 1 planning 1. select a name for the company.2. determine the short-term goals of the company.3. determine the

  Requirements of a good project manager

Requirements of a Good Project Manager - Apply human resource knowledge area to project initiating and planning processes

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd