Write a report on case - rapid prototyping

Assignment Help Computer Networking
Reference no: EM131611469

Network Project Management

In-depth analysis of common issues that program/project managers often face in organisations that lack a culture that supports implementation of project management methodologies.

Purpose of the assessment:

Project management problems can occur when project management methodologies are not implemented successfully across organisations. In this assessment task, you are required to write a report on the current project management issues in the following case-study, in 800 to 1000 words exclusive of references.

RAPID PROTOTYPING - NEW DISCIPLINE

Rapid prototyping has been a constant growing and evolving field since the late 1980s. As technology improved, so did the opportunities in new markets. The idea quickly evolved from its grassroots beginning to many small companies competing for a bigger share of the growing market.

Frank Billings was just another name in what was at that time a niche market. As a student in engineering school, he followed the development of the new prototyping techniques and realized their potential in the marketplace. His dream job was to work for a rapid prototype equipment manufacturer. There were only a few start - up companies in rapid prototype machine development, however, and none could pay the average engineer wage.

Like most engineering school graduates overloaded with school loans, he couldn't wait for his dream job to come along, so he went for a job at Cocable Company. Cocable designed and manufactured specialty cable and cable - related products. It had nothing to do with rapid prototyping, but it paid well. He worked hard at Cocable and earned enough to pay down his debts. He proved to be an excellent engineer, earning a great reputation at Cocable and making many contacts along the way. In those three years at Cocable, however, he never stopped thinking about rapid prototype machines. He spent his free time coming up with a rapid prototype machine design, always dreaming of having his own company. Three years in, he was ready. He quit Cocable and started his own rapid prototype (RP) design business. He perfected his own RP machine design and was ready to prove himself in the growing field.

BUSINESS BOOMS

Like every start - up business in a new field, finding customers is tough. In the RP field, there are two types of work. The first includes owning an RP machine and doing prototypes per order. The second is selling RP machines to businesses that want the machine to do in - house RP. The latter option is far more profitable since the machines are more expensive than each prototype they produce. Frank would have been happy with either type of business, since at the time, he wasn't doing much business at all.

All those years making contacts at Cocable Company proved to be worth the time and effort. He had stayed in touch with these contacts and through them was happy to learn that Cocable had just been hired by GE to design and manufacture cable installations on their newest jet engine. Part of the wiring installation that Cocable had been hired to design included junction boxes and switch covers. The installation would be no simple task as these " boxes " are made of specialty materials with complex shapes and multiple designs, all needed for application. They had to be perfect from the start since airplane engines have no room for error. This was a huge job and the timeline was tight. Rapid prototypes were an absolute necessity for this job. Frank's knowledge of Cocable's needs made him perfect for the RP job.

Cocable wanted full access to rapid prototyping so they decided to contract Frank to custom build four RP machines to their specifications. Frank could not be happier. The RP machine specs were given to Frank and he went to work.

WHO IS GOING TO PAY FOR THE CHANGES?

After three months of all - night work sessions, the machines were built to specification and ready for delivery to Cocable. Frank ' s daring steps into a new field were fully rewarded, he thought.
Everyone was ready for a test run, after the first machine was delivered to Cocable. The CAD model was loaded and it was time to hit the "Start" button.

Beep, beep, beep.

"That's not good, " said Frank.

He felt embarrassed that the machine failed in front of everyone. He was sure the machine ran fine before it was delivered. He couldn't allow his first major deal to fail in any way. The machine was checked over for shipping damages. The connections were double - checked. Everything appeared intact. Frank sat down to review the CAD model and discovered the problem. The model was 62 inches long. This was an issue, considering the RP machines were designed for a maximum of 55 inches.

The original Cocable specs for Frank's RP machines were for a maximum length of 48 inches. Frank optimized his machines for a length of 48 inches, but to be on the safe side, the machines were capable of 55 - inch designs. Sixty - two inches went outside that range. A machine that could make prototypes that long would require completely different processors, actuators, and adhesion processes. This would be a major redesign of the RP machines. This would take time and a lot of money.

Cocable claims that the original specs for a maximum of 48 inches came from GE. GE claims that it never gave Cocable a maximum length. The first design that GE requested from Cocable was 62 inches long and that had been weeks before. Cocable should have double - checked their RP specs. Nobody wants to take the blame for specifying the prototype design sizes and Frank's first major product is now going nowhere. Everyone is dissatisfied and two things are for sure: (1) The entire project is running late, and (2) it will be way over budget.

You are a Project Management consultant, and have been commissioned to write a report on this case. Write the report to address the following questions.

Questions to be addresses in the report:

1. What lessons can be learnt from this case?

2. Who do you think should pay for the changes?

3. What could have been done to make sure that the project scope was correct?

Verified Expert

The paper is prepared for 910 words, excluding bibliography. The paper discusses about the lessons learnt from the case study. Who is going to bear the costs and what project scope has to be carried while working. The reference is provided in IEEE (reference order)

Reference no: EM131611469

Questions Cloud

Exporter of expensive electronic equipment : As an Exporter of expensive electronic equipment, you have a substantial investment in the merchandise that you ship.
What factors would have influenced your decision : Based on everything that you have learned this semester, when the break with England came in 1776 would you have been a revolutionary or a loyalist?
Calculate brazil marginal cost of producing a tonne of food : Define marginal cost and calculate Brazil's marginal cost of producing a tonne of food when the quantity produced is 2.5 tonnes per day.
Calculate book value per share after the transactions : In January 2016, Hammond Corporation was organized and authorized to issue 2,000,000 shares, Calculate book value per share after the transactions
Write a report on case - rapid prototyping : What could have been done to make sure that the project scope was correct - WHO IS GOING TO PAY FOR THE CHANGES?
Determine final stock price valuation : Calculate investments and debt per share and apply those to determine a final stock price valuation.
Define the term dominant culture : Define the term "dominant culture", and in your own words give an example of an aspect of dominant culture in current American society.
What factors make the fed independent from politics : What factors make Fed independent from politics? Why is there so much political pressure on Fed, despite its independence? What role do banks play in process?
Water mist and water-spray systems : Discuss the benefits of residential sprinkler systems, in particular, water mist and water-spray systems

Reviews

Write a Review

Computer Networking Questions & Answers

  Networking and types of networking

This assignment explains the networking features, different kinds of networks and also how they are arranged.

  National and Global economic environment and ICICI Bank

While working in an economy, it has a separate identity but cannot operate insolently.

  Ssh or openssh server services

Write about SSH or OpenSSH server services discussion questions

  Network simulation

Network simulation on Hierarchical Network Rerouting against wormhole attacks

  Small internet works

Prepare a network simulation

  Solidify the concepts of client/server computing

One-way to solidify the concepts of client/server computing and interprocess communication is to develop the requirements for a computer game which plays "Rock, Paper, Scissors" using these techniques.

  Identify the various costs associated with the deployment

Identify the various costs associated with the deployment, operation and maintenance of a mobile-access system. Identify the benefits to the various categories of user, arising from the addition of a mobile-access facility.

  Describe how the modern view of customer service

Describe how the greater reach of telecommunication networks today affects the security of resources which an organisation provides for its employees and customers.

  Technology in improving the relationship building process

Discuss the role of Technology in improving the relationship building process Do you think that the setting of a PR department may be helpful for the ISP provider? Why?

  Remote access networks and vpns

safekeeping posture of enterprise (venture) wired and wireless LANs (WLANs), steps listed in OWASP, Securing User Services, IPV4 ip address, IPV6 address format, V4 address, VPN, Deploying Voice over IP, Remote Management of Applications and Ser..

  Dns

problems of IPV, DNS server software, TCP SYN attack, Ping of Death, Land attack, Teardrop attack, Smurf attack, Fraggle attack

  Outline the difference between an intranet and an extranet

Outline the difference between an intranet and an extranet A programmer is trying to produce an applet with the display shown in Figure 1 below such that whenever one of the checkboxes is selected the label changes to indicate correctly what has..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd