Reference no: EM132073727
Local Area Network Design and Setup -
Purpose of the assessment (with ULO Mapping) This assignment is designed to assess students' knowledge and skills related to the following learning outcomes:
a. Investigate suitable network designs to match requirements.
b. Create appropriate frameworks and standards for network implementation
A case study: Local Area Network design and configuration
There is an organisation which is primarily e-commerce business. It is going through a major transformation because of its expansion. The expansion is due to merger of two smaller businesses to the organisation. Now, the organisation is moving to a new building having about 100 employees. The new building is of three floors. The ground floor is for reception, foyer and warehouse so there is a need of five data points at reception, four in warehouse and two in foyer. The 1st floor consists of five offices and forty open plan office cubicles. The 2nd floor consists of three rooms, each room have four office cubicles, two offices and thirty open plan cubicles. There is also a meeting room at 2nd floor that requires four data points. Each and every person needs two data points at their desk whether it's an office, room cubicle or open plan cubicle. Each floor also needs wireless connectivity.
This organisation needs a new LAN plan, design and implementation before they move to new facility.
Description
Design a local area network for the given case study.
Write a report on a network plan and configurations having following sections:
1. Analyse the need for the network for above case study. Investigate and propose a suitable complete network design for the case study.
2. Write a detailed setup of network devices only for a LAN.
3. Write a detailed implementation report which includes configurations of each networking device which are included in the whole network.
4. Demonstrate and compare at least 2 configuration results which may include at least two switches/routers and two PCs on physical networking devices. [20 marks]
Demonstration: Students can demonstrate in a group of 2. Students should be ready with all setup and configurations before start of the laboratory class. Tutor will ask 2-3 questions to each student to demonstrate any configuration of the setup. Demonstration from each student should not be more than 3 minutes.
Students should give their group members to tutor in week 7 during lab class. Students will get demonstration timetable before start of the week 8 lab class.
Describe an integrative model of motivation
: Identify the basic process models of motivation and describe an integrative model of motivation.
|
Motivating and enhancing performances
: Discuss the role of alternate work arrangements in motivating and enhancing performances.
|
Calculate the expected value of return for the line
: After market research, the firm has established the expectations shown in the following shown in the following table about the annual rate of return.
|
What is bryan gain and how much is recognized
: Bryan has $150,000 basis in his partnership interest. The partnership distributes to him cash basis of $35,000, What is Bryan's gain and how much is recognized
|
Write a detailed setup of network devices
: MN621 - Advanced Network Design - Local Area Network Design and Setup - Analyse the need for the network for above case study.
|
What is your overall perspective on csr
: What is your overall perspective on CSR? If market forces do not encourage responsibility for social causes, should a firm engage in this behavior?
|
Basic types of reserves that project managers
: Analyze the two (2) basic types of reserves that project managers should become familiar with, as discussed in the Kerzner text.
|
Elements that comprise strategic alternative bundles
: Why is creating more than a few bundles extraordinary difficult? Why is it essential that good bundles addressed all of the key strategic issues?
|
Prepare a manufacturing overhead flexible budget
: Actual variable costs were: indirect materials $14,957, indirect labor $9,525, Prepare a manufacturing overhead flexible budget report for the first quarter
|