Two 52 kN loads are maintained 2.5 m apart as they are moved slowly across beam AB. Write a computer program to calculate the deflection at the midpoint C of the beam for values of x from 0 to 9 m, using .5 m increments. Use E= 200 GPa.
What is the solution if foundation bolt cut by some way from their bottom of skid, i mean skid base than how to keep another bolt etc for tightness of skid along with pump-motor already fittied with pipe and other fitting's too..
Find depth of water flow in Rectangular channel, Water is flowing in a rectangular channel whose width is 5m
One issue is to calculate the "pooled" variance and "pooled" standard deviation. Since we expect that the variances of the improvement scores by both groups could be a bit different, we'd want an overall value that reflects the variance of both gr..
To prevent this high compression load from buckling the copper pipe, a solid steel support of 2 1/2 inch diameter is placed inside the copper pipe. The copper pipe is 8.000 inches long. The steel support is 8.0001 inches (exactly 1 mil = 1/1000 in..
A 3000-lb car has a maximum speed (at sea level and on a level, paved surface) of 140 mi/h with 16" radius wheels, a gear reduction of 3.5 to 1, and a drivetrain efficiency of 92%. It is know that at the car's top speed the engine is producing 220..
The arrival rate at a parking lot is 6 veh/ min. Vehicles start arriving at 6: 00 P. M., and when the queue reaches 36 vehicles, service begins. If company policy is that total vehicle delay should be equal to 500 veh-min
The following data represents, in square meters, the cross-sectional areas along a short portion of highway. Calculate the net volume of earthworks needed or available over the portion of the highway.
At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..
What is your recommendation for the maximum size of coarse aggregate for the following situation?
An industry is illegally discharging benzene into a river. The concentration in the river at the point of discharge is 0.2 mg/L. A drinking water treatment plant (DWTP) is located 1.5 km downstream. The water velocity in the river is 0.35 km/day.
Two links AB and B, each 25 in. long are connected at B and guided by hydraulic cylinders attached at A and D. Knowing that D is stationary and that the velocity of A is 30 in./s to the ight
In the construction management, there is a lot of procurement route that are necessary and suitable for the construction industry.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd