A new suburban development project is being planned to the west of Monterrey, Mexico. There is now a two-lane road from the site of the development, along the base of the mountain Cenv de la S/lla (Saddle Hill). The new development will require additional road capacity. Two alternatives are being considered. The first is to upgrade the existing road to four wide modern lanes. The second is to build a new four-lane highway east through Saddle Hill tunnel. The following data are available concerning the two routes:
Route
Distance
First Cost (pesos)
Operating and Maintenance costs per year (pesos)
Base of mountain
20 km
210 million
900000
Tunnel
10 km
450 million
1300000
The planning period is 40 years for both routes. The MARR is 10%. Cars will travel at 100 kilometres per hour along either route. Operating cost for the cars is expected to be about 2.50 pesos per kilometre along either route. About 400 000 trips per year are expected on either route.
(a) Which route should be built? Use only the data given. Use annual worth to make your decision.
(b) What important benefit of the Saddle Hill tunnel route has been left out of the analysis?
(c) Do you need more information about travellers to determine if the benefit that has been left out of the analysis from part (b) would change the recommendation? Explain.
(d) How would the possibility- of collecting a toll on the tunnel route affect your recommendation?
Create a project schedule and align resources, Analyze project schedule and resource allocation
Write a report on Managerial Roles and Gap Analysis
Questionaire on Project Management
Describe the market growth rate for product and service.
Design an online system for the human resources department to manage available job positions.
How does a project risk management approach pro-vide an early warning signal for impending problems or issues
Calculate the payoff and the profits for investments
Describe the features or characteristics of your product or service.
Write paper on Inventory Management System.
Analysis of the overall project risk
Evaluate the usefulness of ROCE
Distribution strategy and project management
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +91-977-207-8620
Phone: +91-977-207-8620
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd