Custom Vans, Inc., specializes in converting standard vans into campers. Depending on the amount of work and customizing to be done, the customizing can cost from less than $1,000 to more than $5,000. In less than 4 years, Tony Rizzo was able to expand his small operation in Gary, Indiana, to other major outlets in Chicago, Milwaukee, Minneapolis, and Detroit. Innovation was the major factor in Tony's success in converting a small van shop into one of the largest and most profitable custom van operations in the Midwest. Tony seemed to have a special ability to design and develop unique features and devices that were always in high demand by van owners. An example was Shower-Rific, which was developed by Tony only 6 months after Custom Vans, Inc., was started.

These small showers were completely self-contained, and they could be placed in almost any type of van and in a number of different locations within a van. Shower-Rific was made of fiberglass, and contained towel racks, built-in soap and shampoo holders, and a unique plastic door. Each Shower-Rific took 2 gallons of fiberglass and 3 hours of labor to manufacture. Most of the Shower-Rifics were manufactured in Gary in the same warehouse where Custom Vans, Inc., was founded. The manufacturing plant in Gary could produce 300 Shower Rifics in a month, but this capacity never seemed to be enough.

Custom Van shops in all locations were complaining about not getting enough Shower-Rifics, and because Minneapolis was farther away from Gary than the other locations, Tony was always inclined to ship Shower-Rifics to the other locations before Minneapolis. This infuriated the manager of Custom Vans at Minneapolis, and after many heated discussions, Tony decided to start another manufacturing plant for Shower-Rifics at Fort Wayne, Indiana. The manufacturing plant at Fort Wayne could produce 150 Shower-Rifics per month.

The manufacturing plant at Fort Wayne was still not able to meet current demand for Shower-Rifics, and Tony knew that the demand for his unique camper shower would grow rapidly in the next year. After consulting with his lawyer and banker, Tony concluded that he should open two new manufacturing plants as soon as possible. Each plant would have the same capacity as the Fort Wayne manufacturing plant. An initial investigation into possible manufacturing locations was made, and Tony decided that the two new plants should be located in Detroit, Michigan; Rockford, Illinois; or Madison, Wisconsin.

Tony knew that selecting the best location for the two new manufacturing plants would be difficult. Transportation costs and demands for the various locations would be important considerations. The Chicago shop was managed by Bill Burch. This shop was one of the first established by Tony, and it continued to outperform the other locations. The manufacturing plant at Gary was supplying 200 Shower-Rifics each month, although Bill knew that the demand for the showers in Chicago was 300 units. The transportation cost per unit from Gary was $10, and although the transportation cost from Fort Wayne was double that amount, Bill was always pleading with Tony to get an additional 50 units from the Fort Wayne manufacturer. The two additional manufacturing plants would certainly be able to supply Bill with the additional 100 showers he needed.

The transportation costs would, of course, vary, depending on which two locations Tony picked. The transportation cost per shower would be $30 from Detroit, $5 from Rockford, and $10 from Madison. Wilma Jackson, manager of the Custom Van shop in Milwaukee, was the most upset about not getting an adequate supply of showers. She had a demand for 100 units, and at the present time, she was only getting half of this demand from the Fort Wayne manufacturing plant. She could not understand why Tony didn't ship her all 100 units from Gary. The transportation cost per unit from Gary was only $20, while the transportation cost from Fort Wayne was $30. Wilma was hoping that Tony would select Madison for one of the manufacturing locations.

She would be able to get all the showers needed, and the transportation cost per unit would only be $5. If not in Madison, a new plant in Rockford would be able to supply her total needs, but the transportation cost per unit would be twice as much as it would be from Madison. Because the transportation cost per unit from Detroit would be $40, Wilma speculated that even if Detroit became one of the new plants, she would not be getting any units from Detroit. Custom Vans, Inc., of Minneapolis was managed by Tom Poanski. He was getting 100 showers from the Gary plant. Demand was 150 units. Tom faced the highest transportation costs of all locations. The transportation cost from Gary was $40 per unit.

It would cost $10 more if showers were sent from the Fort Wayne location. Tom was hoping that Detroit would not be one of the new plants, as the transportation cost would be $60 per unit. Rockford and Madison would have a cost of $30 and $25, respectively, to ship one shower to Minneapolis. The Detroit shop's position was similar to Milwaukee's-only getting half of the demand each month. The 100 units that Detroit did receive came directly from the Fort Wayne plant. The transportation cost was only $15 per unit from Fort Wayne, while it was $25 from Gary. Dick Lopez, manager of Custom Vans, Inc., of Detroit, placed the probability of having one of the new plants in Detroit fairly high. The factory would be located across town, and the transportation cost would be only $5 per unit.

He could get 150 showers from the new plant in Detroit and the other 50 showers from Fort Wayne. Even if Detroit was not selected, the other two locations were not intolerable. Rockford had a transportation cost per unit of $35, and Madison had a transportation cost of $40. Tony pondered the dilemma of locating the two new plants for several weeks before deciding to call a meeting of all the managers of the van shops. The decision was complicated, but the objective was clear-to minimize total costs. The meeting was held in Gary, and everyone was present except Wilma.

Tony: Thank you for coming. As you know, I have decided to open two new plants at Rockford, Madison, or Detroit. The two locations, of course, will change our shipping practices, and I sincerely hope that they will supply you with the Shower-Rifics that you have been wanting. I know you could have sold more units, and I want you to know that I am sorry for this situation.

Dick: Tony, I have given this situation a lot of consideration, and I feel strongly that at least one of the new plants should be located in Detroit. As you know, I am now only getting half of the showers that I need. My brother, Leon, is very interested in running the plant, and I know he would do a good job.

Tom: Dick, I am sure that Leon could do a good job, and I know how difficult it has been since the recent layoffs by the auto industry. Nevertheless, we should be considering total costs and not personalities. I believe that the new plants should be located in Madison and Rockford. I am farther away from the other plants than any other shop, and these locations would significantly reduce transportation costs.

Dick: That may be true, but there are other factors. Detroit has one of the largest suppliers of fiberglass, and I have checked prices. A new plant in Detroit would be able to purchase fiberglass for $2 per gallon less than any of the other existing or proposed plants.

Tom: At Madison, we have an excellent labor force. This is due primarily to the large number of students attending the University of Wisconsin. These students are hard workers, and they will work for $1 less per hour than the other locations that we are considering.

Bill: Calm down, you two. It is obvious that we will not be able to satisfy everyone in locating the new plants. Therefore, I would like to suggest that we vote on the two best locations.

Tony: I don't think that voting would be a good idea. Wilma was not able to attend, and we should be looking at all of these factors together in some type of logical fashion.

Discussion Question
Where would you locate the two new plants? Why?

Reference no: EM131257777

Questions Cloud

Evaluate a scholarly article related to csr : In a well-written, 2- to 3-page paper, evaluate a scholarly article related to CSR, and discuss the merit of the article for today's organizations.
What key strategies did bezos use to grow the company : What key strategies did Bezos use to grow the company in just 17 years? Use credible sources and research to support and explain
What is the total transportation cost : How many units should owner Stephen Allen ship from each plant to each regional distribution center? - What is the total transportation cost?
Generate the first twenty prime numbers greater : Write a program in ARM assembly language to generate the first twenty prime numbers greater than 2 and save them into the memory locations called Primearray. For this part, you may use the following algorithm. You are required to optimize the code..
Where would you locate the two new plants and why : Custom Vans, Inc., specializes in converting standard vans into campers.  - Where would you locate the two new plants? Why?
Calculate various averages in your classes : Write a re-usable program to calculate various averages in your classes. It doesn't matter if you have 3 exams or 33 exams. The program should compute the computer the average as such ExamAverage = SumGrades/CountGrades.
How can they apply this information to their daily lives : How can the conclusions of your literature review inform the population towards whom your presentation is directed? How can they apply this information to their daily lives? What advice or ‘take home message' can you provide to your audience based..
Embedded sql to retrieve the total trip expenses : Write a program in embedded SQL to retrieve the total trip expenses of the salesman named ‘John' for the relations of SALESPERSON (SSN, Name, start_year, Dept_no) TRIP (SSN, From_city, To_city, Departure_Date, Return_Date, Trip_ID) EXPENSE(TripID,..
Name the three parts of a typical queuing system : Name the three parts of a typical queuing system. -  When designing a waiting line system, what "qualitative" concerns need to be considered?

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd