A 10 X 106 m3 lake is fed by a polluted stream having a flow rate of 5 m3/s and a pollutant concentration of 10 mg/L. There is also a sewage outfall that discharges 0.5 m3/s of wastewater having a pollutant concentration of 100 mg/L. The stream and sewage wastes have a first order decay rate coefficient of 0.2/day. Assuming the pollutant is completely mixed and that the lake volume is constant.
a) Find the steady-state concentration in the lake.
b) The desired concentration in the lake is 1 mg/L. An upstream clean-up effort reduces the stream concentration to 1 mg/L. What would the sewage concentration have to be reduced to in order to achieve the desired concentration?
c) Rather than reducing the sewage concentration, one alternative is to divert another tributary so that the total stream flow is doubled, while the stream concentration would remain at 1.0 mg/L. What would the resulting lake concentration be and is this a viable alternative?
d) If the initial concentration of the lake was 1.0 mg/L, how long would it take to, under conditions in part A, achieve 99% of the steady-state concentration (assuming all loads occur at a constant rate)?
Suppose the duration of a storm with rain fallingat an intensity (i) of 0.025 inches per hour was such that therational method (Q = C i A) could be used to calculate runoff fromall the land area in the Quabbin watershed.
a concrete foundation mat in the shape of a regular hexagon ofnbspside 12 ft supports four column loads as shown.
Assume that there were 1,100,000 vehicles making a 28.5-mi round trip per day, the average vehicle emission rate for VOCs is 1.3 g/VM , and the molecular weight of the VOC emissions from the mobile sources can still be represented by that of metha..
Oil of a specific gravity of 0.75 is flowing through a 6-in pipe under a pressure of 15 psi. If the total energy relative to the datumplate is 8.0 ft below the center of the pipe is 58.6 ft, determine the flow rate of the oil.
In accordance with BCA, what are the assessment methods and how may they be used to determine that a building solution complies with the performance requirements
Biological treatment processes for wastewater can be categorised as dispersed growth and attached growth systems. Discuss the advantages and disadvantages of attached growth systems over dispersed growth systems.
a freeway exit ramp has a single lane and consists entirely of a horizontal curve with a central angle of 90 degrees and a length of 628 ft. if the distance cleared from the centerline for sight distance is 19.4ft, what design speed was used
A 1m diameter pipe bend is carrying water with a steady flow rate of 2 m3/s. The bend has an angle of 90o and lies in a horizontal plane. The volume of water in the bend is 1.5 m3 and the empty weight of the bend is 4 kN.
The concrete cylinder 6 in x 12 in broke incompression at a load of 110000 lbs. Compute the crushing strength of concrete. Estimate the tensile strength and the modulus of elasticity.
A rectangular channel carries a discharge of 2.00 m3/sec per meter of channel width over a weir crest that is 1.4 m in height. The energy grade line upstream of the weir measure 2.7 m above the channel bottom.
On a particular highway, a permanent speed measuring device at one particular location has determined, over many months of observations, that the mean and standard deviation of vehicle speeds at that point are 52 miles per hour and 4 miles per hou..
a package in the shape of a rectangular box can be mailed bynbspthe us postal service if the sum of its length and
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd