What will you need to understand and measure

Assignment Help Project Management
Reference no: EM13334047

Could you please answer these homework questions.

1. What will you need to understand and measure for an effective reengineering project? 
Cost and risk
Performance of existing processes for a baseline
Strategic analysis and workflow
Inputs and outputs

Question 2. 2. Enabling organizations to make continual improvements to many business processes and to use processes as the fundamental building blocks of corporate information systems is the goal of

PM.
BPR.
reengineering.
workflow management.

Question 3. 3. The _____ is directly responsible for the individual systems project. (Points : 1)
project management group
project team
IS steering committee
corporate strategic planning committee

Question 4. 4. Which process develops a detailed description of the functions that a new information system must perform?  1)
Feasibility study
Requirements analysis
Systems design
Test plan development

Question 5. 5. The entire system-building effort is driven by
organizational change.
feasibility studies.
the information value change.
user information requirements.

Question 6. 6. Systems design
describes what a system should do to meet information requirements.
shows how the new system will fulfill the information requirements.
always tries to increase precision.
includes the testing phases.

Question 7. 7. Transferring transaction data from a legacy system to the new system would be defined by which category of system design specifications? 
Input
Database
Manual procedures
Conversion

Question 8. 8. What is the primary driving factor in firms to select domestic outsourcing firms to build system solutions?

o take advantage of technical skills the firm does not have
To save labor costs
To avoid change management issues
All of the above

Question 9. 9. The four kinds of structural organizational change enabled by IT, in order from least to most risky, are
rationalization, automation, reengineering, and redesigning.
rationalization, automation, reengineering, and paradigm shift.
automation, rationalization, reengineering, and paradigm shifts.
automation, redesigning, restructuring, and paradigm shift.

Question 10. 10. Traditional software development methodologies often fail because

insufficient funds are allocated.
users are not an integral part of the development process.
not enough planning is done.
the IT staff does not have the necessary skills.

Question 11. 11. You have been hired by a pharmaceutical company to evaluate its inventory of systems and IT projects. Which types of projects would be best avoided?
Any high-risk projects
Any low-benefit projects
All high-risk, low benefit projects
None; any project might be beneficial

Question 12. 12. To best evaluate, from a financial standpoint, an IT investment whose benefits cannot be firmly established in advance, you would use
capital budgeting.
the real option pricing model.
the scoring model.
net present value.
Question 13. 13. What do many companies overlook when making information system investment decisions? (Points : 1)
Benefits from the new system
Organizational disruption costs
Social and organizational dimensions
All of the above

Question 14. 14. Information systems projects are valued similarly to stock options in which model of financial evaluation?
IRR
Real options pricing model
Capital budgeting
Accounting rate of return on ROI

Question 15. 15. An example of an external integration tool would be:
to define task dependencies.
to include user representatives as active members of the project team.
to create a PERT chart.
to hold frequent project team meetings.

Question 16. 16. Agile methodologies emphasize
thorough planning before the project starts.
sequential execution of the six steps of system development.
isolation of users from developers.
incremental development of small working pieces of the project.

Question 17. 17. The major variables in project management are
scope, time, cost, and performance.
scope, time, cost, quality, and risk.
time, cost, quality, performance, and risk.
time, cost, scope, and performance.

Question 18. 18. Using a strategic analysis approach, an organization's information requirements are known through a small number of
milestones and dates.
critical success factors.
key management decisions.
organizational changes.

Question 19. 19. In which approach to systems building are the development stages organized so that tasks in one stage are completed before the tasks in the next stage have begun? )
Traditional
Prototyping
RAD
All of the above

Question 20. 20. The process of building an experimental system quickly and inexpensively for demonstration and evaluation so that users can better determine information requirements.
agile.
JAD.
prototyping.
agile or prototyping.

Reference no: EM13334047

Questions Cloud

Determine the potential energy of the pair of charges : Two point charges Q1 = +4.30 nC and Q2 = -2.30 nC are separated by 27.0 cm. What is the potential energy of the pair of charges
Develop an entity-relationship diagram : List the entity classes and attributes that would be necessary for this information system.
What is probability that more of the business travelers say : A Travel Weekly International Air Transport Association survey asked business travelers about the purpose for their most recent business trip. 19% responded that it was for an internal company visit.
Calculate the total electric potential at the origin : Two point charges are on the y-axis. A 5.0 µC charge is located at y = 1.40 cm, and a -2.30 µC charge is located at y = -1.60 cm. Find the total electric potential at the origin
What will you need to understand and measure : 1. What will you need to understand and measure for an effective reengineering project?
Determine how much must be remitted for the purchase : The current price of the $1,000 bond is $978. On February 1, you purchase $10,000 face amount, and your broker charges a $25 commission. How much must you remit for the purchase
What is the maximum speed during the motion : A horizontal spring-mass system has low friction, spring stiffness 150 N/m, and mass 0.4 kg. What is the maximum speed during the motion
Explain the molar mass of fecl2 : Find the percentage of FeCl2 in a 35.5g sample of ore which has been dissolved in aqueous acid and titrated to the endpoint with 23.55 ml of 0.309 M Cr2O7^2- . the molar mass of FeCl2 is 126.0 g/mol. Cr2O7^2- + Fe^2+ ------> Cr^3+ + Fe^3+
How far apart will the three teddy bears land : At a county fair, a boy and two friends bring their teddy bears on the giant Ferris wheel. The boys are seated in positions 45° from each other. How far apart will the three teddy bears land

Reviews

Write a Review

Project Management Questions & Answers

  Explain types of business ownership

What are the four types of business ownership? Describe each of them. Your response should be at least 200 words in length. You are required to use at least your textbook as source material for your response.

  Explaining importance ethical and legal responsibilities

Explain the importance ethical and legal responsibilities in the research project.

  Definition of a project using weekly reading or pmi pmbok

What constitutes a "project"? Based on the weekly reading or PMI PMBOK, what is the definition of a project?

  Computing minimum total direct cost for project durations

Compute the minimum total direct cost for each of the following project durations (based on the cost associated with each activity): 13, 14, 15, 16, 17, and 18 weeks.

  What waiting line model would you use to determine

What waiting line model would you use to determine the queuing characteristics of buying a ticket for college football game where

  Capability index (cpk) formulas to compute the two values

You have just used the capability index (Cpk) formulas to compute the two values "min [2, 2.5]." Which of the following is the proper interpretation of these numbers?

  Explaining critical path of a pert chart

In terms of creating a timeline, what is meant by the critical path of a PERT chart?

  Conjoint analysis - final capstone proposal document

A copy of the Workplan covering the timelines set for Modules 2-6

  Application development-rapid application development model

You check into your e-group today and see that conversation has begun about the differences between general project management and application development or rapid application development (RAD) models.

  Change in project if the required rate of return falls

Does your recommendation change if the required rate of return falls to 12%.

  Manufacturing quality dimensions to improve revenue

Which of the 4 manufacturing quality dimensions are most likely to improve revenue?

  Research project on telecommuting

What are the technology infrastructure requirements for telecommuting and how should sites be selected?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd