Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
If you were asked to perform an excavation contract competitively with limited data, what type of contract would you want and why?
A vertical curve is formed when a rural highway passes under a bridge joining a -8% grade to the horizontal grade satisfying the requirement for safe speed of 90 Km/hr . Determine the minimum clearance required betewen the highway pavement surface..
At one point in a pipeline, the water's speed is 3.00 m/s and the gauge pressure is 4.00×10^4 Pa. Find the gauge pressure at a second point in the line 11.0 m lower than the first if the pipe diameter at the second point is twice that at the first..
A vertical curve is to connect two tangents that intersect at station 50+00 and the elevation 500.00ft. The back tangent gradient is -4 percent, the forward tangent gradient is 2 percent, and the elevation of the curve at station 48+50 must equal ..
If a mass of 500kg is placed centrally on the top face of the buoy, find the maximum height of its centre of gravity above the bottom of the buoy so that the buoy may remain in stable equilibrium.
A Silane contains 90.31 % silicon and 9.69 % hydrogen by mass. The compound has a molar mass of 62 g/mol. Determine the compound's empirical and molecular formula.
Calculate the force (in Kn) a punch press must exert if it is to punch out a large washer from a strip of 5-mm thick sheet steel with an ultimate shear strength of 400 MPa.
What is your recommendation for the maximum size of coarse aggregate for the following situation? A continuously reinforced concrete pavement cross section contains a layer of No. 6 reinforced bars at 15.24 cm centers,
Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.
Samples of 20 rivets for a steel structure are checked for quality every hour. The probability of finding a bad rivet that has to be scrapped is 1%.assume that x is the number of parts in the sample of 20 that have to be scrapped.
How much money should an environmental soil cleaning company borrow to finance a site reclamation project if it expects revenue of $140,000 in the first year increasing by 3% per year over the 5-year cleanup period? The interest rate is 8%.
Transportation network, A power generator at a dam can send 300 megawatts to substation 1, can send 200 megawatts to substation 2, and can send 250 megawatts to substation 2
Characteristic values of the shear strength parameters of the soil are c'= 0, and f' = 400. Determine the required width of the footing if a factor of safety of 3.0 against shear failure is specified when the water table rise to foundation level.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd