What lessons can be learnt from this case

Assignment Help Project Management
Reference no: EM131616234 , Length: word count:800

Network Project Management Assignment

Purpose of the assessment (with ULO Mapping) - In-depth analysis of common issues that program/project managers often face in organisations that lack a culture that supports implementation of project management methodologies.

Purpose of the assessment: Project management  problems can  occur when  project management methodologies are  not implemented successfully across organisations.  In this assessment task, you are required to write a report on the current project management issues in the following case-study, in 800 to 1000 words exclusive of references.

RAPID PROTOTYPING - NEW DISCIPLINE

Rapid prototyping has been a constant growing and evolving field since the late 1980s. As technology improved,  so  did  the  opportunities  in  new markets.  The  idea  quickly  evolved  from  its  grassroots beginning to many small companies competing for a bigger share of the growing market. Frank  Billings  was  just  another  name  in  what  was  at  that  time  a  niche  market.  As  a  student  in engineering school, he  followed the development of the new prototyping techniques and realized their  potential  in  the  marketplace.  His  dream  job  was  to  work  for  a  rapid  prototype  equipment manufacturer. There were only a few start - up companies in rapid prototype machine development, however, and none could pay the average engineer wage. 

Like most engineering school graduates overloaded with school loans, he couldn't wait for his dream job to come along, so he went for a job at Cocable Company. Cocable designed and manufactured specialty cable and cable - related products. It had nothing to do with rapid prototyping, but it paid well. He worked  hard at  Cocable and earned enough  to  pay  down  his debts. He  proved  to  be an excellent engineer, earning a great reputation at Cocable and making many contacts along the way. In those three years at Cocable, however, he never stopped thinking about rapid prototype machines. He spent his free time coming up with a rapid prototype machine design, always dreaming of having his own company. Three years in, he was ready. He quit Cocable and started his own rapid prototype (RP) design business. He perfected his own RP machine design and was ready to prove himself in the growing field.

BUSINESS BOOMS

Like every start - up business in a new field, finding customers is tough. In the RP field, there are two types of work. The first includes owning an RP machine and doing prototypes per order. The second is selling RP machines to businesses that want the machine to do in - house RP. The latter option is far more profitable since the machines are more expensive than each prototype they produce. Frank would  have  been  happy  with  either  type  of  business,  since  at  the  time,  he  wasn't  doing  much business at all.

All those years making contacts at Cocable Company proved to be worth the time and effort. He had stayed in touch with these contacts and through them was happy to learn that Cocable had just been hired by GE  to design and manufacture cable installations on  their newest jet engine. Part of  the wiring installation that Cocable had been hired to design included junction boxes and switch covers. The installation would  be  no  simple  task as  these  "  boxes  " are made  of  specialty materials with complex shapes and multiple designs, all needed  for application. They had to be perfect  from the start since airplane engines have no room for error. This was a huge job and the timeline was tight. Rapid prototypes were an absolute necessity for this job. Frank's knowledge of Cocable's needs made him perfect for the RP job.

Cocable wanted full access to rapid prototyping so they decided to contract Frank to custom build four RP machines  to  their  specifications. Frank could not be happier. The RP machine  specs were given to Frank and he went to work.

WHO IS GOING TO PAY FOR THE CHANGES?

After three months of all - night work sessions, the machines were built to specification and ready for delivery to Cocable. Frank ' s daring steps into a new field were fully rewarded, he thought.  Everyone was ready for a test run, after the first machine was delivered to Cocable. The CAD model was loaded and it was time to hit the "Start" button.  

Beep, beep, beep. 

"That's not good," said Frank.

He felt embarrassed that the machine failed in front of everyone. He was sure the machine ran fine before it was delivered. He couldn't allow his first major deal to fail in any way. The machine was checked over for shipping damages. The connections were double - checked. Everything appeared intact. Frank sat  down  to  review  the  CAD model and  discovered  the problem. The model was 62 inches long. This was an issue, considering the RP machines were designed for a maximum of 55 inches.

The original Cocable specs for Frank's RP machines were for a maximum length of 48 inches. Frank optimized  his machines  for a length  of  48 inches,  but  to  be  on the  safe  side,  the machines were capable of 55 - inch designs. Sixty - two inches went outside that range. A machine that could make prototypes  that  long  would  require  completely  different  processors,  actuators,  and  adhesion processes. This would be a major redesign of the RP machines. This would take time and a lot of money.

Cocable claims that the original specs for a maximum of 48 inches came from GE. GE claims that it never gave Cocable a maximum length. The first design that GE requested from Cocable was 62 inches long and that had been weeks before. Cocable should have double - checked their RP specs. Nobody wants to take the blame for specifying the prototype design sizes and Frank's first major product is now going nowhere. Everyone is dissatisfied and two things are for sure:  (1) The entire project is running late, and (2) it will be way over budget.

You are a Project Management consultant, and have been commissioned to write a report on this case. Write the report to address the following questions.

Questions to be addresses in the report:

1. What lessons can be learnt from this case? 

2. Who do you think should pay for the changes? 

3. What could have been done to make sure that the project scope was correct? 

Ref: CASE STUDIES IN PROJECT, PROGRAM, AND ORGANIZATIONAL PROJECT MANAGEMENT Dragan Z. Milosevic, Peerasit Patanakul & Sabin Srivannaboon Copyright 0 2010 by John Wiley & Sons, Inc. All rights reserved.

Prepared by: Assoc. Prof. Nalin Sharda Moderated by: Dr. Imran Jokhio July, 2017.

Reference no: EM131616234

Questions Cloud

What is initial investment outlay for the spectrometer : What is the initial investment outlay for the spectrometer, that is, what is the Year 0 project cash flow?
Calculate nominal after-tax net returns at the end of year : Calculate the nominal after-tax net returns at the end of year 2. What is the present value of the nominal after tax net return after 3 years?
Increase in market interest rates : what is the percentage change in the market price of this expected from a 1% Increase in market interest rates?
What is the intrinsic value of the bond : Suppose that a $1000 par value bond has 5 years left until maturity. what is the intrinsic value of the bond?
What lessons can be learnt from this case : MN601 Network Project Management Assignment. RAPID PROTOTYPING - NEW DISCIPLINE, What lessons can be learnt from this case
Participant in any qualified retirement plan : Adam is not a participant in any qualified retirement plan and Elsie established individual retirement accounts during the year.
What is the smallest expected loss for your portfolio : What is the smallest expected loss for your portfolio in the coming month with a probability of 5 percent?
Establish its optimal capital structure : HMC Inc. is trying to establish its optimal capital structure.
What portion of capital budget will be funded with debt : what portion of the capital budget will be funded with debt?

Reviews

len1616234

8/28/2017 1:06:04 AM

Australian student, total 800 words. All work must be submitted on Moodle by the due date along with a completed Assignment Cover Page. The assignment must be in MS Word format, 1.5 spacing, 11-pt Calibri (Body) font and 2 cm margins on all four sides of your page with appropriate section headings. Reference sources must be cited in the text of the report, and listed appropriately at the end in a reference list using IEEE referencing style.

len1616234

8/28/2017 1:05:57 AM

All topics are pertinent and covered in depth. Ability to think critically and source material is demonstrated. Demonstrated excellent ability to think critically and sourced reference material appropriately. Logic is clear and easy to follow with strong arguments. All elements are present and very well integrated. Excellent use of creditable sources. Accurate referencing. Obvious that outstanding effort made. Logic is clear and easy to follow with strong arguments and Clear styles with excellent source of references.

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd