Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A vertical curve is designed for 90 km/h and has an initial grade of +2.5% and final grade of -1.0 %. the PVT is at station 3+480. It is known that a point on the curve at station 3+440 is at elevation 75m. What is the stationing and elevation of the PVC? What is the stationing and elevation of the high point on the curve?
for a uniformly loaded square area, what is the stress to load ratio at a depth of 2B below the CENTER of the loaded area
A soil sample with a water content of 14.5% and unit weight of 128.2 lb/cu. ft. was dried to a unit weight of 118.8 lb/cu. ft. without changing its void ratio. What is its new water content (in %)?
A tank of Compressed oxygen for flame cutting is to contain 10 kg of oxygen at a preassure of 14 MPA ( the temperature is 20 degrees Celsius). How large must be the tank volume
A large pipeline with a 1.200 meter inside diameter carries oil similar to SAE 10 at 110 degrees celcius (sg=0.8). Compute the volume flow rate required to produce a Reynolds number of 3.60 x 10 ^4.
Using the Hazen-Williams approach (seecoefficient table below), find the headloss of water flowingthrough 1,000-ft of 6-ft diameter concrete pipe at a flow rate (Q)of 80 ft3/sec
Using the Gumbel probability function, estimate the probability that a maximum 24 hour depth in any year will exceed 160 mm. What is the probability that the maximum 24 hour depth will exceed 125 mm
All stormwater will drain as sheet flow to the center, flow into a drop inlet, and travel through a pipe system to the nearest stream. The parking lot will be mowed grass (clay soil) with a slope of 2 percent toward the center.
Find the swell for a soil which weighs 1600kg/m in bank and 1300kg/m3 in bank and 1300kg/m3 Loose and what is the shrinkage factor for a mass of soil that takes up 1.5m3 in bank and reduces down to 1.2m3 after compaction
To adjust the mix so as to increase the compressive strength, the water-to-cement ratio is reduced to 0.45. Will the quality of the coarse aggregate increase, decrease, or stay the same
The initial schedule called for 500 feet of pipeline to be installed each week, with the total construction cost projected to be $25 million. After 8 weeks, 4750' of pipeline has been installed at a cost of $11.25 million.
A bridge has cylindrical piers 1 m in diameter and spaced 15 m apart. Downstream of the bridge where the flow disturbance from the piers is no longer present, the flow depth is 2.9 m and the mean velocity is 2.5 m/s.
The 60mm diameter shaft ABC is supported by two journal bearings, while the 80mm diameter shaft EH is fixed at E and supported by a journal bearing at H. If T1= 2 kN*m and T2= 4 kN*m
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd