1. Using the information in Table 12-7, construct a PERT network and answer each of the following questions:

a. What is the expected project completion data?

b. What is the scheduled start and completion date for each activity?

c. Which activities are on the critical path?

d. How long can noncritical path activities be delayed without jeopardizing the overall completion date for this project?

2. Assess the impact of the following changes to the time estimates provided in question 1. Individually, what is the impact if:

Activity

Predecessor

New Time Estimate

O. Advertise for new staff

N

4

P. Interview for new staff

O

6

Q. Select new staff

P

1

Collectively, what is the impact of these changes?

3. As project manager for the example included in question 1, what would you recommend to preserve the original project completion date if activity A was reestimated to take 8 weeks, not the original 4 weeks? Provide details.

4. Develop a WBS and PERT network with no more than 20 activities for each of the following projects.
a. Buying a car

b. Screening 1000 school-age children for high blood pressure and reporting the results to the child's physician

Table 12-7 Project to Convert a 20-Bed Unit in a Nursing Home to Accommodate Patients with Dementia

Activity

 

Predecessor

Time estimate (weeks)

A

Secure state approval

-

4

B

Identify 20-bed unit to be used

A

1

C

Move existing residents

B

1

D

Clean space

C

2

E

Develop architectural plans

A

9

F

Install new heating and ventilation systems

E

4

G

Install security systems

E

2

H

Move walls; renovate

F

4

I

Identify new equipment

A

1

J

Order new equipment

I

1

K

Unpack and inspect new equipment

J

1

L

Install new equipment

D, K, H

3

M

Reassign staff

A

1

N

Identify new staffing needs

M

1

O

Advertise for new staff

N

3

P

Interview for new staff

O

2

Q

Select new hires

P

3

R

Develop care plan protocols

M

1

S

Train staff

R, Q, M, L

1

T

Modify quality assurance plans

S

2

U

Coordinate with hospital discharge planners

T

4

V

Complete internal audit

U, G

1

Reference no: EM131189161

Questions Cloud

Skier lands from the beginning of the ramp : Suppose an aerial freestyle skier goes off a ramp with her path represented by the equation y=-0.022(x-25)^2+40. If the surface of the mountain is represented by the linear equation y=-0.5+25, find the distance in feet the skier lands from the beg..
Calculate how much you might expect to earn from project : Let’s try to examine the most glaring issue with IRR via an example. Let’s suppose a friend of yours offers you an "investment." He knows that every year there is one day when some lottery numbers are fixed. calculate how much you might expect to ear..
What are the two archetypical economic systems : suggest that autonomy and cultural regulation are more fundamental than the dichotomy between markets and plans in classifying systems?
Find the coefficient of variation for the project : An investment costs $7,000, after tax considerations, and will generate cash flows of $1,500 a year over its life. The capital investment will last for 7, 8, or 9 years, with probabilities of 0.3, 0.4, and 0.3 respectively. Assume the required rate o..
What is the expected project completion data : As project manager for the example included in question 1, what would you recommend to preserve the original project completion date if activity A was reestimated to take 8 weeks, not the original 4 weeks? Provide details.
Calculate the reward to risk ratio for combination of firm : A firm’s existing assets have an expected return of 16% and an associated standard deviation of 20%. A proposed project has an expected return of 26% and an associated standard deviation of 30%. The covariance between the existing firm and the projec..
Declare on the shipping manifest : The weight of 1 hoon corresponds to a mass of0.3779g. When you arrange to ship the ox home to your astonished family, how much mass in kilograms must you declare on the shipping manifest? Use dimensional analysis.
Interest on the unpaid balance : A credit card company charges 18% interest on the unpaid balance. If you owed $2000 three months ago and have been delinquent since, how much do you owe?
Financed entirely with equity and the firm has beta : The Chris-Kraft Co. is financed entirely with equity and the firm has a beta of 1.55. The current risk-free rate is 6 percent and the expected market return is 12 percent. What should be the required rate of return on the project? What is the NPV of ..

Reviews

Write a Review

Mathematics Questions & Answers

  Rate of change of length of shadow

A man 6 feet tall walks at a rate of 5 feet per second away from a light that is 15 feet above ground . When he is 10 feet from the base of the light,

  Find the equation of the regression line for the given data

This data shows the temperatures on randomly chosen days during a summer class and the number of absences on those days. (temperature, number of absences) (72, 3), (85, 7), (91, 10), (90, 10), (88, 8), (98, 15), (75, 4), (100, 16), (80, 5)

  Computing eps at different levels of ebit

Rise Against Corporation is comparing two different capital structures: an all-equity plan (Plan I) and a levered plan (Plan II). Under Plan I, the company would have 195,000 shares of stock outstanding.

  If they drive 25 of distance on first day and 15 on second

jack and his family are driving to san diego california this summer a 3600 mile trip. if they drive 25 of the distance

  Construct a k-form on s^k with nonzero integral

Construct a k-form on S^k with nonzero integral. [Hint: Construct a compactly supported k-form in R^k with nonzero integral, and project stereo graphically.]

  Set definitions with unions and intersections

Suppose you are going to flip a coin once. What is the set of possible outcomes for this? Suppose you are going to flip a coin twice. What is the set of possible outcomes for this?

  What dimensions will allow the board to have a maximum area

A computer-parts company wants to make a rectangular memory board that has a perimeter of 28 cm. What dimensions will allow the board to have a maximum area?

  Find the magnitude and direction of velocity

Find the magnitude and direction of velocity att= 3 sec. Distance is measured in meters. Round your answers to one decimal place and don't forget to use the degree symbol.

  Binomial coefficients and combinations

Four people select a main dish from a menu of 7 items. How many choices are possible: If a record is kept of who selected which choice (as a waiter would)

  Find the points on the curve where the tangent is vertical

If you have a graphing device, graph the curve to check your work. Find the points on the curve where the tangent is horizontal. Find the points on the curve where the tangent is vertical.

  Calculate the variable costs of hand- made rocking chairs

calculate the variable costs of hand- made rocking chairs using the following information.

  Defines a level curve through a point

The equation f(x,y) = f(a,b) defines a level curve through a point (a, b) where grad f (a, b) à= ì0 . Use im- plicit differentiation and the chain rule to show that the slope of the line tangent to this curve at the point (a, b) is !fx(a,b)/fy(a,b) i..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd