A production process is used to produce 20 different items, under intermittent batch production.  When inventory or projected inventory of an item drops to a certain level, a production order is released for Q units of that item.  Because product demand is random, production orders create a random pattern of jobs released for production.  Jobs in queue are processed by order of release date, i.e., first in/first out.

For simplicity, assume all 20 items have the same demand rate (about 20,000 units annually for each item), with demand for all items occurring at a uniform rate throughout the year.  Moreover, all 20 items have the same production rate (the production line runs at 100 units per hour), and the same setup/changeover time (3 hours). 

The plant runs 3 shifts in round-the-clock operations, on a 5-day work week (250 days per year).  Of the 24 hours per day, about 16.33% are consumed by shift changes, breaks, maintenance, machine breakdown, etc.  This leaves an effective capacity of approximately 20 hours per day, available for setups and running the line.

The items in question all sell for $50 per unit.  Direct materials cost is about $20 per unit.  One process operator (required for both setup and running the line) earns $15.00 per hour.  Historically, the process has been changed over about 300 times per year, for a total of about 900 hours of lost production time.  A total of about $1500 of setup-related scrap material is generated annually.  The carrying cost rate is 20%. 

You are going to conduct an EOQ analysis for the proper order quantity (lot size) for these items.  Since we have 20 identical items (just to simplify the problem), they will all have the same optimal lot size.  Your assignment is to review the simple EOQ model, and compute what the EOQ formula would suggest as the optimal lot size. 

What is annual demand for a single item (D)?

What is the annual carrying cost per unit (H) ?

What is the cost per order (per setup) (S)?

What would the EOQ formula, Q =uggest as the optimal lot size?

 

 

Reference no: EM13301475

Questions Cloud

What is the desired ending inventory : What is the desired ending inventory?
Explain ammonium carbamate can dissociate into gases : Ammonium carbamate can dissociate into gases at 25 C according to the reaction: NH2COONH4(s) 2NH3(g) + CO2(g) If sufficient ammonium carbamate is sealed in a flask, the total pressure will be 0.117 atm at equilibrium. What is the value of Kp at ..
At what angle with the ground is the shell projected : A 1350 kg cannon, which fires a 70 kg shell with a speed of 606 m/s relative to the muzzle, At what angle with the ground is the shell projected
What are the firm marginal and average tax rates : What are the firm's marginal and average tax rates on taxable income?
What is annual demand for a single item d : A production process is used to produce 20 different items, under intermittent batch production.  When inventory or projected inventory of an item drops to a certain level, a production order is released for Q units of that item.  Because product dem..
What is the kinetic energy of the flywheel after charging : Delivery trucks that operate by making use of energy stored in a rotating flywheel have been used in Europe. What is the kinetic energy of the flywheel after charging
Calculate the internal rate of return : The initial outlay associated with the expansion would be $1,950,000, and the project would generate free cash flows of $450,000 per year for six years. The appropriate required rate of return is 9 percent.
Compute the ph you would expect to measure : calculate the pH you would expect to measure if 15.0mL of 0.5M acetic acid were mixed with 25.0mL of 0.5M sodium acetate
Compute the market value of the bonds : Sincere Stationery Corporation needs to raise $500,000 to improve its manufacturing plant. It has decided to issue a $1,000 par value bond with a 14 percent annual coupon rate and a 10 year maturity. The investors require a 9 percent rate of retur..

Reviews

Write a Review

Project Management Questions & Answers

  Key stakeholders is important for effective communication

Just as deciding how to communicate with your key stakeholders is important, listening to your key stakeholders is important for effective communication.

  Ranking of projects differ use of irr or npv measures

The ranking of projects differs on the use of IRR or NPV measures. Which project should be selected? Why is the IRR ranking misleading?

  Identify the problems associated with the project

Show how project management principles were used to reach project goals in the face of adversity.

  Changes in company is necessary if any problems occur

What difficulties can occur if the contractors have decided on work assignments, and what changes may be necessary if problems occur?

  Finding critical path and project duration

Find the critical path and project duration in days. Given that each resource is assigned 100% to each task, identify the resource constraints.

  Entertainment - due to electrical code changes

All the equipment that bands bring to the stage will need to be checked by fire marshals

  Superior white goods

Superior White Goods latest market and financial reports have indicated that turnover is trending down and that it is starting to lose market share.

  Construct an argumentfor or againstthe notion

Construct an argumentfor or againstthe notion that an individual's privacyismore importantthan any otherconsideration like security,childcare etc. in the workplace,Use ethical theory to support your position. Using APA referencing system

  Show the communications management process

Communications management process - Project Management Book of Knowledge states that Communications Management includes the following processes

  Importance of a project kick-off meeting

Describe the importance of a project kick-off meeting, and what needs to be reviewed in that meeting.

  Describe about project management and responsibilities

Explain the connection between Project Management and an organization's Strategic Plan and briefly explain the task decision making responsibilities under the three project management matrix structures

  Find internal rate of return

Shwo Project J has the same internal rate of return as Project K and which of the subsequent statements is correct

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd