Waste management and storage of hazardous materials

Assignment Help Project Management
Reference no: EM132666638

Environmental inspection checklist

Environmental Protection Measure

Compliance? Yes, No

General

The site is generally in a tidy condition
All materials and equipment are contained within the project boundary
All works are undertaken within the project boundary
Designated haulage routes and access points are being used
All clean water is being diverted away from disturbed areas
All clean water diversion drains are stable
Sediment fence is installed correctly and there are no gaps
Disturbed areas where no works are undertaken are properly covered or stabilised
Areas of localised soil erosion have been identified and appropriate preventativemeasures implemented
There are no areas of potential or actual concentrated flow that do not flow to sediment basins/traps
Slope lengths are maintained at appropriate lengths to slow flows down and minimise erosion
Check dams are used within diversion drains where required to slow flows down and minimise erosion within the drains
Geotextile linings (or similar) are used to provide temporary surface protection in areas where appropriate (e.g. batter drains, culvert construction)
Stockpiles are sited in low-hazard areas clear of watercourses and flood prone lands
Cut-off drains on the upslope side and sediment fencing on the downslope side are in place for all stockpile areas within the site
Stockpiles are less than 2m in height
Sediment control measures are constructed as close to the potential source of sediment as possible
Shakers, rubble pads or wash down areas have been installed
There is no mud on the roads outside of the project boundary
Sediment fencing or equivalent is provided downslope of disturbed areas that can't be directed into a designated sediment basin
Sediment basin volume markers intact and clearly visible
Sediment basin inlets and outlets are stable
Accumulated sediment is below 30% of the sediment storage zone
The basins have been emptied since the last rain event and restored to their design capacity (if not, explanation must be provided)
All discharges are undertaken in accordance with Dewatering Permits

Air Quality/Dust Management
No visible dust leaving the Project boundary
Dust suppression, i.e. water cart, is being used to minimise dust emissions

Vegetation Management
Clearing limits and work boundaries are established and well defined
Clearing and grubbing works are undertaken in accordance with Clearing and Grubbing Permits
No materials are stockpiled and no vehicles are parked under trees' drip line
Exclusion fencing around trees and sensitive areas is intact
No visible weed infestation

Heritage Management
Exclusion fencing around heritage protected areas is intact
Heritage protected areas are adequately signposted

Waste Management and Storage of Hazardous Materials
Wastes are segregated in designated containers
Contaminated soil/asbestos storage areas are fenced off and signposted
Concrete washouts are properly set-up and signposted
Fuel/chemicals stored in bunded areas
No oil leaks or spills visible on site
Refuelling in designated areas
Spill kits available in designated areas

Attachment:- Environmental inspection checklist.rar

Reference no: EM132666638

Questions Cloud

Make the journal entries needed on the books of Blossom : On April 1, 2020, Blossom Company sold 28,800 of its 12%, 15-year, $1,000 face value bonds at 97. Make the journal entries needed on the books of Blossom
Which is the most useful measure of network costs : Which is the most useful measure of network costs from the point of view of the network manager? Why?
Discuss the challenges of writing recovery plan : Discuss the challenges of writing the recovery plan from the perspective of your current or previous employer's work environment.
What are baseline security requirements : What are baseline security requirements that should be applied to the design and implementation of applications, databases, systems, network infrastructure,
Waste management and storage of hazardous materials : Waste Management and Storage of Hazardous Materials and Clearing and grubbing works are undertaken in accordance with Clearing and Grubbing Permits
Describe depth role in which organizational risk tolerance : Describe in depth the role in which organizational risk tolerance plays in relation to systems under assessment.
System testing and verification : Explain the Testing of activities for the given software: Test Design. Test Automation, Test Execution and Test Evaluation.
Penetration testing report : Prepare a plan to conduct a complete penetration testing on one or two targets. A planning and Pre-Attack phases are clearly addressed
Evaluate its preparedness for virtualization : Describe the organization's environment, and evaluate its preparedness for virtualization.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd