Volume of soil-excavated from the borrow pit

Assignment Help Civil Engineering
Reference no: EM1383484

Soil having a void ratio of 0.68 as it exists in a borrow pit is to be excavated and transported to a fill site where it will be compacted to a void ratio of 0.45. The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).

Reference no: EM1383484

Questions Cloud

Finding the gallons of mercury : How many gallons of mercury (sg=13.54) would weight the same as 5 gallons of castor oil which has a specific weight of 56.69 pcf?
Time inventory system for a product : How appropriate might a just in time inventory system be for a product such as roller skates?
Partial wavelength for electromagnetic energy : What is the length of the partial wavelength for electromagnetic energy with a frequency of 15 MHz and a phase shift of 263 degrees (in meters)?
Constant head permeability test : A constant head permeability test was conducted on a clean sand sample. The diameter and length of the test specimen were 10 cm and 12 cm respectively.
Volume of soil-excavated from the borrow pit : The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).
Bernoulli equation-measure the flow rate through the meter : The meter inlet and throat are connected by the two legs of a mercury manometer. Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
Average shearing stress : Two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa.
Equal-tangent crest vertical curve : An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?
Well-known architect frank lloyd wright : Many years ago, well-known architect Frank Lloyd Wright designed a mile-high skyscraper, which has never been built.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Concentration of tracer in the reactor

What is the concentration of tracer in the reactor 1 h after tracer addition is terminated? The reactor had an initial concentration of tracer of 1.0 mg/L when tracer addition commenced.

  Engineering ethics and concept and cases

what is the engineering ethics case related to civil engineering with reference and discuss all the engineering ethics issues which covered the "Engineering etics concepte and cases?

  Determining optimal solution

The company would like to distribute the songs between the two CDs such that the used space on each CD is about the same. Formulate the problem as an IP, and find the optimal solution.

  Water system design

Determine the corresponding error in the computed discharge

  Estimating annual erosion

Using the USLE, estimate the annual erosion from a 100 ha. forested watershed assuming the following: R =112 tonnes/ha/year. The forest is in fair condition with 40% cover; Average slope is 3%; The soils are clay loam in hydrologic group C.

  Type of reaction involving protonated alcohol

The reaction between 2-methyl-2-pentanol and HBr to yield 2-methyl-2-pentene is probably: A) an E1-type reaction involving the protonated alcohol as the substrate. B) an SN2-type reaction involving the protonated alcohol as the substrate.

  Determining the pumping rate

Determine the required pumping rate. the aquifer has T= 1600 m 2 /day and the wells each have radius of influence of 600m.

  Change in it internal energy

A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?

  Rocket velocity as a function of time

(a) Use differentiation to find a general expression for the rocket's velocity as a function of time, (b) When is the velocity zero?

  Designing ramp for the highest horizontal curve

the maximum degree of curvature can be at most 6.0 and the superelevation can be at most +6.0%. Design the ramp for the highest horizontal curve design speed given the constraints.

  Coefficient of friction-skidding resistance

Two passenger cars are traveling at 65 MPH on a highway moving in the same direction in the same lane. The cars are separated by 25 feet for every 10 MPH of their speed. The coefficient of friction (skidding resistance) between the tires and the r..

  Installation of motor on pw criterion

At the end of 15 years, the first motor will have a salvage value of $50 and the second motor will have a salvage value of $100. consider the MARR to be 8%. (note : 1HP=0.7457 kw). Determine which motor should be installed based on the PW criterio..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd