Reference no: EM1383485

A constant head permeability test was conducted on a clean sand sample. The diameter and length of the test specimen were 10 cm and 12 cm respectively. The head difference between manometer levels was 4.9 cm during the test, and the water temperature was 20 degrees C. If it took 152 seconds for 500 ml of water to discharge, determine the soil's coefficient of permeability. (in cm/s)

Reference no: EM1383485

Questions Cloud

Long cantilever beam of elastic modulus : A 45 kg machine is placed at the end of a 1.6 m long cantilever beam of elastic modulus 200 x 109 N/m and cross-sectional moment of inertia 1.6 x 10-5 m4.
Finding the gallons of mercury : How many gallons of mercury (sg=13.54) would weight the same as 5 gallons of castor oil which has a specific weight of 56.69 pcf?
Time inventory system for a product : How appropriate might a just in time inventory system be for a product such as roller skates?
Partial wavelength for electromagnetic energy : What is the length of the partial wavelength for electromagnetic energy with a frequency of 15 MHz and a phase shift of 263 degrees (in meters)?
Constant head permeability test : A constant head permeability test was conducted on a clean sand sample. The diameter and length of the test specimen were 10 cm and 12 cm respectively.
Volume of soil-excavated from the borrow pit : The volume of fill required is 2500 cubic meters. Find the volume of soil that must be excavated from the borrow pit to furnish the required volume of fill. (in cubic meters).
Bernoulli equation-measure the flow rate through the meter : The meter inlet and throat are connected by the two legs of a mercury manometer. Use the Bernoulli equation to describe how this manometer can be used to measure the flow rate through the meter.
Average shearing stress : Two strips of a plastics material are bonded together as shown. The average shearing stress in the glue must be limited to 1000 kpa.
Equal-tangent crest vertical curve : An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?

Reviews

Write a Review

Civil Engineering Questions & Answers

  Acceleration along a pathline

The velocity along a pathline is given by V (m/s) = s^2 x t^(1/2) where s is in meters and t is in seconds. The radius of curvature is 0.5 m. Evaluate the acceleration along and normal to the path at s = 2m and t = 0.5 seconds.

  Maximum total load that can be applied to a truss

How do you find the force ratio equation to determine the maximum total load that can be applied to a truss? Given a force of a member how do you find the force ratio?

  Analyze a structural system of a building

Use modern software tools to analyze a structural system of a building.

  Expanded depth of the bed after the backwash

Find the expanded depth of the bed after the backwash when initial depth of the bed is 3 ft using given conditions. μ = 0.01g/cm/sec, T = 25oC, ρs = 2.65, ρ=1, washrate = 1.5 cm/sec, ks2 = 196. (Assumed single size)

  Dissolved inorganic carbon sample

The total dissolved inorganic carbon (TIC) of a sample of groundwater is 8.33 mM. The temperature of the aquifer is 15C, the pH is 7.5, and the ionic strength is 0.05 M. What is the H2CO3, HCO3-, CO3 2-, and the partial pressure of CO2? [Use activ..

  Horizontal motion of plunger and shaft

The horizontal motion of plunger and shaft is arrested by resistance of the attached disk which moves through the oil bath. If the velocity of plunger is v.

  Consolidated-drained triaxial shear test

A consolidated-drained triaxial shear test on a normally consolidated clay yielded a drained friction angle of 28 degrees. If the confining pressure during the test was 15 psi, what was the major principal stress at failure.

  Determining the pumping rate

Determine the required pumping rate. the aquifer has T= 1600 m 2 /day and the wells each have radius of influence of 600m.

  Design a three story office building

Design a three story office building

  Temporary change on the highway

Determine the minimum distance from the diversion that a road sign should be located informing drivers of the temporary change on the highway. The letter height on the road sign is 5 inches.

  Force required to maintain this motion

The viscosity of the film of oil separating the piston from the cylinder is 0.020 lb.s/ft. Calculate the force required to maintain this motion.

  Projectile shot vertically upward

The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd