Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
The height (in meters) of a projectile shot vertically upward from a point 2 m above ground level with an initial velocity of 24.5 m/s is h2+24.5t-4.9t^2 after t seconds. a) When does the projectile reach its maximum height? b) What is the maximum height?
You are to design a chlorination tank for killing microorganisms in the effluent from a wastewater treatment plant. It is necessary to remove 99% of active bacteria in a wastewater flow of 120 m 3 /hr.
Determine the number of man-hours required to form the structure using data from R. S. Means or other appropriate reference. What is the difference between labor cost and labor pro-ductivity?
Critical review the decision making of a failed major construction/property project within the UK in the last ten years.
For the data given below, derive the 2-hr unit hydrograph for a watershed having a drainagearea of 216 km^2, assuming a constant baseflow of 20 m^3/s.
Include immediate and consolidation settlements, but ignore secondary compression. In your calculation, use three sublayers with thicknesses of 4 ft, 8 ft and 16 ft for the top, middle and bottom layers. Ignore any settlement caused by the dense s..
The central angle is 35 degrees, the superelevation is 0.08, and 20.6 ft is cleared (for sight distance) from the inside edge of the innermost lane. Determine a maximum safe speed (assuming current design standards) to the nearest 5 mi/h.
The difference between the total and static pressure before a shock is 75 psi. What is the maximum static pressure that can exist at this point ahead of the shock? The gas is oxygen.
Devise a appropriate management system that you as a commercial manager for the contractor would recommend to the project team for use on a construction or building contract.
Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay
Measure the distance PA, PB, PC etc. from p to various point with chain or tape and plot them to scale along the co responding rays. Join the points a, b, c, etc. to give outline of survey.
A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?
The gate is rectangular with a horizontal width of 2m perpendicular to the paper. For a depth h = 3m of water, calculate the required force exerted by the hydraulic cylinder to keep the gate just closed.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd