1) An equal-tangent crest vertical curve is designed with a PVI at station 110+00 and a PVC at station 107+43.3. if the high point is station 110+75.5 what is the design speed of he curve?
2) A vertical curve is designed for 55 mi/h and has an initial grade of +2.5% and a final grade of -1.0%. the PVT is at station 114+ 50. it is known that a point on the curve station 112 +35 is at elevation 245 ft. what is the stationing and elevation of PVC? what is the stationing and elevation of the high point on the curve?
Determine the projected component of the force fac along the axis of strut ao. Express the result as a cartesian vector.
There are many parallels between the industrialization of the United States after Reconstruction and the modernization of the American workforce in the last twenty to thirty (20-30) years as it transitions from industry to a service-oriented econo..
Ernst & young is currently providing support to various sectors. In this regards it was felt that if this report is able to document good practices currently being adopted or planned in ceramic sector.
The tape is stretched over three equal spans. Calculate the tape corrections under the following conditions at field, temperature = 85ºF, pull = 18kg, E= 2.109 x 10 6 kg/cm 2
Develop a simple urban constructed wetland design.
A rod of steel is 20 m long at a temperature of 200C. find the free expansion of the rod when the temperature is raised to 65 0 C. Find the temperature stress produced
Two passenger cars are traveling at 65 MPH on a highway moving in the same direction in the same lane. The cars are separated by 25 feet for every 10 MPH of their speed. The coefficient of friction (skidding resistance) between the tires and the r..
A big municipal utility district is considering two large-scale conduits. The first includes construction of a steel pipeline at a cost of $200 million.
Determine the rate at which heat is added in the boiler, the power required to operate the pumps, the net power produced by the cycle, and the thermal efficiency.
To float a 160 pound man using helium balloons (assume 0.52 cubic feet per inflated balloon). How many balloons would it take? Assume density of air is 1.29 kg/cubic meter and the density of helium is 0.179 kg/cubic meter.
How much money should an environmental soil cleaning company borrow to finance a site reclamation project if it expects revenue of $140,000 in the first year increasing by 3% per year over the 5-year cleanup period? The interest rate is 8%.
Assume that during the analyze stage an obvious solution is discovered. Should that solution be immediately implemented and the remaining steps of DMAIC abandoned?
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!