Use a numerical method to estimate the excess pore pressure

Assignment Help Civil Engineering
Reference no: EM13544557

At the site of a large scale land reclamation project 2 m of sand overlie a silty clay layer 5 m thick, which overlies highly fractured permeable rock. The project involved rapidly placing 5 m of fill over a large area that applied a stress of 100 kPa to the underlying soil. It was initially expected that after 2 years consolidation would be complete. However, after 2 years the excess pore pressures in the silty clay layer were still significant and had the values shown in the table below.

Depth below

top of clay layer (m)   Excess pore pressure(kPa)

0                                         0

1                                         25

2                                         40

3                                         50

4                                         40

5                                         25

6                                         0

To speed up consolidation it is proposed to place additional fill, starting at t = 2 years, so that the stress on the clay increases at a rate of 10kPa/month for 6 months, at which time all the additional load will be removed.

a.Assuming that consolidation is occurring under 1-Dimensional conditions show that the pore pressures measured at 2 years are consistent with a cv of approximately 1.7 m2/yr.

b.Use a numerical method to estimate the excess pore pressure distribution in the clay layer between 2 years and 2.5 years from the start of the land reclamation, and hence determine the settlement at 2.5 years. Use ?t = 2 months, ?z = 1 m, and take mv = 0.0001 m2/kN.

Reference no: EM13544557

Questions Cloud

Find the stress in the steel and the stress in the concrete : A 14-in. square concrete post is 6ft tall and reinforced by nine 3/4" diameter steel rods. Assume that the materials are high-strength concrete and ASTM-A36 structural steel.
What is the difference in water levels between reservoirs : A wrought iron water line connecting two reservoirs at 20°C has a length of 1500 m, a diameter of 75 cm, two elbows (90º, long-radius, flanged), a fully open gate valve, and a reentrant pipe entrance.
Find the magnitude of the velocity and acceleration for the : Sketch the flow field defined by u=3y, v=2 and derive expressions for the x and y components of acceleration. Find the magnitude of the velocity and acceleration for the point having the coordinates (3,4). Specify units in terms of L and T.
Parallel and perpendicular lines : Write an equation in slope-intercept form of the line that passes through the given point and is perpendicular to the given line - Write an equation in slope-intercept form of the line.
Use a numerical method to estimate the excess pore pressure : At the site of a large scale land reclamation project 2 m of sand overlie a silty clay layer 5 m thick, which overlies highly fractured permeable rock.
Find the steady state concentration if the air in the box : Consider the air over a city to be a box 100km on a side that reaches up to an altitude of 1.0 km. The air is blowing into the box along one of its sides with a speed of 4 m/s
Determine the force p that must be applied to the cylinder : The brass tube AB (E=105 GPa) has a cross-sectional area of 140 mm^2 and is fitted with a plug at A. The tube is attached at B to a rigid plate that is itself attached at C to the bottom of an aluminum cylinder
Determine the required do concentration in the treatment : Given the following information, determine the required DO concentration in the treatment plant effluent discharge in order to ensure that at no point downstream the DO in the river drops below 4 mg/L:
Determine the required diameter of the thread : A nylon thread is to be subjected to a 10-N tension. Knowing that E=3.2 GPa, that the maximum allowable normal stress is 40 MPA, and that the length of the thread must not increase by more than 1%, determine the required diameter of the thread.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Design a horizontal curve with a 40-degree central angle

Design a horizontal curve with a 40-degree central angle (delta=40) for a two-lane road with 11-ft lanes. The design speed is 70 mi/h and superelevation is limited to 0.06ft/ft. Give radius, degree of curvature, and length of curve.

  Determine the force required with an angle of 20 degrees

A 10 kg block is being pulled down a slope with an angle of 20 degrees and has a velocity of .2 m/s. Determine the force required

  A stress orientation can always be found

A stress orientation can always be found that maximizesnormal stresses and causes shear stresses to be zero.

  Estimate contact time to achieve an effluent concentration

Estimate the contact time to achieve an effluent concentration of 200 fecal coliforms/100 mL using a Cl2 dose of 3 mg/L if the wastewater temperature is 28 oC. Assume the activation energy (Ea) at pH = 7.4 is 6,500 cal/mole.

  Determine what is flexural rigidity ei of the diving board

Consider a diver weighing 200 lb at the end of a diving board that cantilevers out over 3 ft. The diver oscillates at a frequency of 2 Hz. What is the flexural rigidity EI of the diving board

  Compute the required outside diameter at the working stress

A short hollow cast iron cylinder with a wall of thickness of 1 inch. is to carry a compressive load p=150 kips. compute the required outside diameter if the working stress in compression is 12,000 psi

  How far back from the front axle would the center of gravity

how far back from the front axle would the center of gravity have to be to ensure that the maximum tractive effort developed for front- and rear- wheel-drive options is equal (assume that all other variables are unchanged)

  Determine the normal depth and critical depth in a trapezoid

Determine the normal depth and critical depth in a trapezoidal channel with a bottom width of 12.5 m, side slopes of 2:1, and a bed slope of 0.003 m/m.

  Determine economical number of trucks and direct cost

A project involves transporting iron pipe to a jobsite that is 43 miles from the supplier. The pipe will be hauled in trucks that can carry 16 pipes per load. Each pipe is 20 ft in length. The average haul speed of a truck will be 50 mi./hr and re..

  Compute the thermal efficiiency of the rankine cycle

an ideal regenerative rankine cycle operates so the steam enters the turbine at 40 bars and 500c and exhausts at 0.1 bar steam at 7 bars is extracted and is used in a single open feed-water heater

  Determine the horizontal force the wire exerts on the poles

A telephone wire 5 mm in diameter is suspended between telephone poles spaced 50 m apart. If the wind velocity is 100 km/h and the air is at 2 degrees C, 1 atm, determine the horizontal force (in N) the wire exerts on the poles.

  Determine the magnitudes of two smallest horizontal forces

A couple M of magnitude 18 Nm is applied to the handle of a screwdriver to tighten a screw into a block of wood. Determine the magnitudes of the two smallest horizontal forces that are equivalent to M

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!