Tools to reinforce ongoing monitoring activities

Assignment Help Project Management
Reference no: EM13670335

Develop the following tools to reinforce ongoing monitoring activities. Also outline a list of system maintenance team members, along with their responsibilities. This team may or may not be similar to your project management team.

Consider the ongoing activities that have to occur when selecting your team members.

1. Incident Reporting Form
2. Ongoing Maintenance Schedule
3. Team Roster with outline of responsibilities

Explain the similarities and differences in your project management team and system maintenance team.

Also explain why the age of a system is a significant factor in determining the type of maintenance.

Along with your summary, submit the incident reporting form, ongoing maintenance schedule, and team roster with responsibilities.

The project charter is the first step in any project which includes assigning a project manager to a project post sign off from the sponsors. Once project charter is created and signed then only project is initiated in the company. Also organization knows about the projects moving in an organization.

• Best in class Quality policy - ensuring the Quality of the new work is not jeopardized and is in lines if not better than the industrial standard followed by similar organizations. Moreover the project should be qualitatively judged to bring down the turnaround time without affecting the overall standard of the process.

• Milestone reviews for better after management - keeping the organizational enhancements in track and ensure the new project is timely reviewed for better results.

• Standard operating procedures - following the predefined credo of operational practices as charted out by the organization.

• Predefined methodology for project management, within the matrix organization structure, so that most of the in-house issues in the project are automatically resolved.

Deliverables and project specifications:

The deliverable of the project is broadly restrained to three major buckets:

• Evaluating the software and hardware vendors for the Information technology.

• Selecting and acquiring an information system begins with a needs assessment

• Raising the RFP against the same. 

Project Work Breakdown structure and methodology:

As already noted in the scope and charter, the project is required to be in sync with the 3 major deliverables alongside being in lines with other organizational standard practices that were in place.

For that to happen, the Work Breakdown structure is very crucial. To start off with a few major subtasks is to be created and then resources are needed to be allocated to them accordingly (Thayer& Yourdon, 2000).These tasks would include:

• Creating a work project scheduling: to identify all the tasks involved and backtracking the ending date to get step by step breakdown of the work in hand, along with the time requirements.

• Creating accurate cost estimates: to prudently allocate the available $1,00,000 to the parties involved in the project and get the project up and rolling in the given deadline of 3 months.

• Creating a staffing authority: to ensure proper staffing is available to create the project deliverables.

• Creating a responsibility assignment matrix: to ensure responsibilities are properly distributed and someone or the other is made accountable for each action undertaken.

The project team to ensure completion of the project

Verified Expert

Reference no: EM13670335

Questions Cloud

Describe the difference between two light bulbs in series : Describe the difference between two light bulbs in series and two light bulbs in parallel. Explain how would you wire each connection
Determine how fast was the car going on the table : A toy car runs off the edge of a table that is 1.225 meter high. If the car lands 0.400 meter from the base of the table, Determine how fast was the car going on the table
Find the car velocity before it drives off the top of wall : A remote controlled car with a constant velocity drives off the top of a wall that is 10.0 high and lands 4.60 meter from the base of the wall. Find the car velocity before it drives off the top of wall
Obtain its rotational kinetic energy about that axis : A uniform block of granite in the shape of a book has face dimensions of 23.0 centimeter and 23.6 centimeter and a thickness of 1.97 centimeter. Obtain its rotational kinetic energy about that axis
Tools to reinforce ongoing monitoring activities : Explain the similarities and differences in your project management team and system maintenance team - Develop the following tools to reinforce ongoing monitoring activities. Also outline a list of system maintenance team members, along with their ..
Find the maximum force on the man from the lady : A lady with mass m1 is ice-skating toward the east on a frictionless frozen lake when she collides with a mass of mass m2 who is ice-skating toward the west. Find the maximum force on the man from the lady, including direction
Obtain what fraction of the object kinetic energy is lost : The coefficient of the restitution of an object is defined as the ratio of its outgoing to incoming speed when the object collides with a rigid surface. obtain what fraction of the object kinetic energy is lost
Evaluate the maximum stress that this bone can withstand : The femur is a bone in the leg whose minimum cross-sectional area is about 4.10 x 10-4 m2. Obtain the maximum stress that this bone can withstand
Calculate the speed of the object at the instant : A horizontal spring is lying on a frictionless surface. One end of the spring is attached to a wall while the other end is connected to a movable object. Determine the speed of the object at the instant when the spring is stretched by 0.049 meter r..

Reviews

Write a Review

Project Management Questions & Answers

  Project management- changes to baseline

Project management: Changes to Baseline - when would a project manager not allow changes to a baseline?

  Describe how attitudes can affect your communication

Describe How Attitudes Can Affect your Communication with Non-Natives - Explain what are the prevailing attitudes in your culture

  How many kanbans do you need for this connector

After several hours of analysis, you develop the following data for scanner connectors used in one work cell. How many kanbans do you need for this connector?

  Hierarchical planning types of time frames in planning role

Hierachical Planning Types of time frames in planning Role players Steps in production planning Planning techniques Resources

  Project management-analyze the organizations basic legal

project management-analyze the organizations basic legal social and economic issues-analyze managerial operational and

  Computing depreciation using macrs

Depreciation is computed using MACRS over a 5 year life, and the cost of capital is 10%. The applicable depreciation rates are 0.20, 0.32, 0.19, 0.12, 0.11, and 0.06. Assume a 40% tax rate.

  Project management dear sirmadamplease find the enclosed

dear sirmadam ltbrgt ltbrgtplease find the enclosed file question paper. kindly send me answer sheet asap. ltbrgt

  What types of information can we learn about a project

What types of information can we learn about a project by reviewing the project schedule and all the information used to generate it?

  Pros and cons of marketing idea from financial perspective

In your discussion, describe the pros and cons of this marketing idea proposed by the company from the both a financial and nonfinancial perspective.

  A four-year financial project has estimates of net cash

a four-year financial project has estimates of net cash flows shown belowyear net cash flow120000225000330000435000it

  Any gaps in this background will require you to make sound

this assignment consists of two 2 sections a written paper and a work breakdown structure wbs. you must submit the two

  Demands more adaptability to changing conditions

An hourly manufacturing worker transported from the 1960s to 2010 would find that manufacturing work today:

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd