The important location factors and ratings

Assignment Help Project Management
Reference no: EM13668200

Arsenal Electronics is going to construct a new $1.2 billion semiconductor plant and has selected four towns in the Midwest as potential sites. The important location factors and ratings for each town are as follows:


View complete question »

Location Factor

Weight

Scores (0 to 100)

Abbeton

Bayside

Cane Creek

Dunnville

Work ethics

0.18

80

90

70

75

Quality of life

0.16

75

85

95

90

Labor laws/unionization

0.12

90

60

60

70

Infrastructure

0.10

60

50

60

70

Education

0.0

 

Reference no: EM13668200

Questions Cloud

Explain what the percent potassium chlorate : If 789mL of gas is collected over water is collected over water at .976 atmospheres and 30.0 C, explain what the percent potassium chlorate is in the original mixture? Vapor pressure of water is at 30.0 C = .023 atm.
Was the sample size adequate : Was the sample size adequate?
State balance equations for all substitution reactions : State balance equations for all substitution reactions between the alkyl halides and NaI (sodium iodide)
Explain reactions indicate which substance is oxidized : For each of the following reactions indicate which substance is oxidized and which reduced. Which substance is the oxidizing agent and which is the reducing agent
The important location factors and ratings : The important location factors and ratings
Compute the equilibrium constant kc : 3.88 mol of A as well as 4.11 mol of B are placed in a 0.640 L container. Compute the equilibrium constant Kc given that 1.63mol of C was present at equilibrium.
Depict the structures of all alkenyal side products : Depict the structures of all alkenyal side products that could be formed by dehydration of 1- methyl-2-butanol by an e1 mechanism
The important location factors and ratings : The important location factors and ratings
Compute the partition coefficient for the compound : This aqueous solution is extracted with 5.0mL of hexane. Separation as well as analysis of the aqueous phase shows that it now contains 12mg of the organic compound. Compute the partition coefficient for the compound.

Reviews

Write a Review

Project Management Questions & Answers

  Discounted profitability index of the project

Using Excel or pencil and paper, what is the discounted profitability index of the project?

  Strategy for reduction project durationa detailed

strategy for reduction project durationa detailed description of the most effective strategy for reducing a projects

  Describe different ways to develop a wbs and how activity

Describe different ways to develop a WBS and how activity definition and activity sequencing correlate to the project network? Why is slack important to the project manager and what is the difference between free slack and total slack?

  Construction project risk management in singapore

Select a current debate in project management literature and search the Internet and identify a relevant article about a current debate in the project management literature.

  Formulate as a linear programming problem

The standard unit requires 60 minutes, while the deluxe requires 120. Formulate as a linear programming problem, and solve using the corner points solution method.

  Company risks vs project risksboth eastman chemical company

company risks vs. project risksboth eastman chemical company a large natural gas user and van oil a major natural gas

  Communications management processpmis project management

communications management processpmis project management book of knowledge states that communications management

  Complex project orientated environment

Develop your planning and analytical skills in the context of a complex project orientated environment - Prepare a report that critically evaluates your solutions in relation to the tools and techniques you have used in constructing the project sch..

  Why are accurate estimates critical

Explain why are accurate estimates critical to effective project management and what steps can project managers take to improve the accuracy of estimating projects?

  Prepare a project reportareport structure1acknowledgements

prepare a project reportareport structure1.acknowledgements - it is the norm to thank those individuals who have

  Operations management-aggregate production planningplan

operations management-aggregate production planningplan production for a four-month period february through may. for

  Question about project managmentcan you please provide an

question about project managmentcan you please provide an example of how the concept of summary tasks can be used

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd