Task 1evaluate the use of three different process planning

Assignment Help Project Management
Reference no: EM13374279

Task 1

Evaluate the use of three different process planning techniques

Select and assess the use of a capacity assessment technique for two different types of process

Explain the use of a range of scheduling techniques

1. Mechanical Option:

Manufacturing processing techniques used for Alloy Wheel manufacturing include the followings:

- Forging
- High Pressure Die Casting
- Low Pressure Die Casting
- Gravity Casting (Permanent mould and sand casting)
- Quality control

2. Electrical Option:

Manufacturing processing techniques used for electric cables manufacturing include the followings:
- Wire drawing
- Wire grouping to make conductor
- Insulation
- Phase wiring
- Outer sheath
- Quality control

Q1: Provide an overview of the specific manufacturing case study that you have selected.

Q2:Discuss and evaluate three process planning techniques (CPM, PERT and MRP) for any of the manufacturing processes relevant to the selected case study.

Q3: Discuss and assess the use of capacity assessment technique for two different processes of the manufacturing processes relevant to the selected case study.

Q4: For one process of the selected manufacturing processes relevant to the selected case study, discuss and explain the use of two scheduling techniques.

Task 2

Explain an application of the principle of inventory management

The process to oversee the constant flow of components or units of a product into and out of an existing inventory is called Inventory Management. Discuss and explain how the principles of inventory management are used in the selected product.

Task 3

Compare and evaluate two different stock control systems

Two bin system and Kanban are two of many stock control systems used in inventory management. Compare these two systems and evaluate the use of either of them in the selected case study.

Task 4 -

Discuss two different shop floor documentation systems

Explain the functions of shop control

Q1: Stock record, works order, job tickets and recording of finished quantities are few examples of the documentation systems that are used in recording and controlling components and product production and stocking in any manufacturing and distribution industry. Discuss and explain the use of two of these documentation systems or any other two that are relevant to your case study.

Q2:;Scheduled release of work orders and data collection and feedback are two types of shop control systems; explain how are they used in stocking and distributing the product of your selected case study.

Task 5

Explain the methods of classifying and coding component parts into family groups

Explain how family groups of components are sequenced for processing through grouped facilities

Q1: The processes of categorizing parts of your selected product into groups is called classification; define and explain two methods that are used in classifying and coding the parts of your selected product into family groups.

Q2: Parts of any product classified into groups and families according to their design, geometrical shape, manufacturing processes and layout. Explain how are parts of your selected product or your products grouped into family groups and how are these family groups sequenced for processing through grouped families.

Task 6

Produce a process plan from a given set of data

Produce a production schedule from a process plan

Q1: Using a computer software (Microsoft project) produce a process plan including the identification of timing, completion dates, material required, equipment and tools required and man power (labours, engineers and management) needed to produce a bundle of 100 units of your selected product. Explain the method of preparing your plan and how it is evolved.

Q2: Provide screen shoots or print out of the Critical Path and the Gantt chart of the process plan and provide costing table for producing 100 units of your selected product.

Reference no: EM13374279

Questions Cloud

Nbspwrite paer based on the poem one perfect rose by : nbspwrite paer based on the poem one perfect rose by dorothy parker. what im mainlynbspconcernnbspis my grammar
Question : question..
Using the epic the iliad as rence how does each character : using the epic the iliad as r??ence. how does each character grapple with their limited free
Nbspwrite conclusion for this essaydistrustdistrust is the : nbspwrite conclusion for this essay?distrustdistrust is the feeling of doubt towards the ones intentions beliefs and
Task 1evaluate the use of three different process planning : task 1evaluate the use of three different process planning techniquesselect and assess the use of a capacity assessment
In part 1 you must answer questions guiding you through a : in part 1 you must answer questions guiding you through a three-step writing process. in part 2 you must write a
Section anbspuse your kills to analyze compare criticize : section anbspuse your kills to analyze compare criticize evaluate and justify the answers in a process to solve the
A persuasive speech on the legalization of marijuana using : a persuasive speech on the legalization of marijuana. using monroes motivational sequence as an organizational pattern
Essay about aviation legislation the topic have to be : essay about aviation legislation. the topic have to be recently news which are have to be within this year and have to

Reviews

Write a Review

Project Management Questions & Answers

  Have osha regulations gone too far in the workplace

Different countries may have different laws and maybe some of their safety standards may be lower than ours.

  Coverting cpm-based plan-reality-actually executing project

However, there are sevel issues to be aware of when coverting the CPM-based plan to reality and actually executing the project.

  Leadership communication1 compare and contrast logos pathos

leadership communication1. compare and contrast logos pathos and ethos in relation establishing credibility for

  Project management questiontime identify the completion

project management questiontime identify the completion date of the project.budget list out the expenses and any other

  Managerial decision making

How could the fixed pie concept come into play in this situation and Managerial Decision Making

  The main purpose of aggregate operations planning

The main purpose of aggregate operations planning is to specify the optimal combination of which of the following?

  Show the project risk management in project planning

Explain why should all projects include risk in their project planning? What are some of the drawbacks if risks are not considered

  Project managementshow the list the organizations that

project managementshow the list the organizations that actively promote project management such as comptia and prince2.

  Explain about project scope management

Explain why is Project Scope Management important to the success or failure of a project

  What factors contribute to the cohesiveness of the sternberg

What factors contribute to the cohesiveness of the Sternberg-Silverman-Friedman group? What factors might affect the group's performance norms in the future?

  Explain the steps in the statistical analysis

Explain the steps in the statistical analysis and explain the steps in the statistical analysis

  International logistics planning process

International logistics planning process - The Logistics Company (TLC) has been generating international logistics plans for its clients since 1979. Network Diagram for project based upon the WBS. The Network Diagram should include the Earliest Start..

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd