Set up a scatter diagram for speed and miles per gallon

Assignment Help Engineering Mathematics
Reference no: EM1343648

Question 1: A research analyst for an oil company wants to develop a model to predict miles per gallon based on highway speed.  An experiment is designed in which a test car is driven at speeds ranging from 10 miles per hour to 75 miles per hour.  The results are in the data set (SPEED.xls).

a)    Set up a scatter diagram for speed and miles per gallon.

b)    Apply simple regression analysis, and then interpret the meaning of the slope b1 in this problem.

c)     Interpret the meaning of the regression coefficient b0 in this problem.

d)    Determine the coefficient of determination, r2, and interpret its meaning.

e)    How useful do you think this regression model is for predicting mileage?

 

Question 2:  Refer to the data set given in [1].  Now assume a quadratic relationship between speed and mileage:

a)    State the quadratic regression equation.

b)    Predict the average mileage obtained when the car is driven at 55 miles per hour.

c)     Determine the coefficient of multiple determination, r2.

d)    Determine the adjusted r2.

e)    Determine the adequacy of the fit of the model.

f)     At the 0.05 level of significance, determine whether the quadratic model is a better fit than the linear regression model.

 

Question 3 An auto manufacturing company wanted to investigate how the price of one of its car models depreciates with age.  The research department at the company took a sample of eight cars of this model and collected the following information on the ages (in years) and prices (in hundreds of dollars) of these cars.  The data are in USEDCAR.xls.

Age (x)

8

3

6

9

2

5

6

3

Price (y)

16

74

40

19

124

36

33

89

 

a)    Set up a scatter diagram for age and price.

b)    At the 0.05 level of significance, determine whether there is a significant linear relationship between age and price.

c)     State the linear regression equation.

d)    Predict the average price obtained when the age of the car is 7 years old.

e)    Determine the coefficient of determination, r2, and interpret its meaning.

f)     How useful do you think this regression model is for predicting price?

 

Question 4: Refer to the data set given in [3].  Now assume a quadratic relationship between age and price:

a)    State the quadratic regression equation.

b)    Predict the average price obtained when the age of the car is 7 years old.

c)     Determine the coefficient of multiple determination, r2.

d)    Determine the adjusted r2.

e)    Determine the adequacy of the fit of the model.

f)     At the 0.05 level of significance, determine whether the quadratic model is a better fit than the linear regression model.

 

Question 5: Refer to the data set given in [3].  Now assume an exponential relationship between age and price:

a)    State the exponential regression equation.

b)    Predict the average price obtained when the age of the car is 7 years old.

c)     Determine the coefficient of multiple determination, r2.

d)    Determine the adjusted r2.

e)    Determine the adequacy of the fit of the model.

f)     At the 0.05 level of significance, determine whether the exponential model is a better fit than the linear regression model or the quadratic model.

Reference no: EM1343648

Questions Cloud

Effective project reports : Search the Web for project reports. Print out and describe at least one Web site that discusses methods for writing effective project reports
Show the project management communication : Project management communication - explain what are the critical elements of a communication plan?
What is the importance of a variance to a project budget : Project management - What is the importance of a variance to a project budget, schedule, or specification?
Time-Series Forecasting : Time-Series Forecasting:  Applied Regression Analysis course,  The data in DJIA.xls represent the closing values of the Dow Jones Industrial Average (DJIA) from 1979 through 2008.  Plot the time series.  Find a three-years moving average to the d..
Set up a scatter diagram for speed and miles per gallon : A research analyst for an oil company wants to develop a model to predict miles per gallon based on highway speed.  An experiment is designed in which a test car is driven at speeds ranging from 10 miles per hour to 75 miles per hour.  The results ar..
Project evaluation, reporting, and termination : Compare and contrast various conflict resolution techniques. Apply these techniques to solve problems related to your project. Identify potential conflict areas and develop conflict-resolution methodologies to deal with these conflicts.
Important information about project closure : How would you incorporate the information gleaned from this session into future project plans and tools
Developer''s desire to use new languages : developer who is requesting to complete his current project using the newly-released Belchfire 500. What will your answer be, and why?
Affect the project''s ability to succeed : Cultural barriers to projects' success - What cultural barriers may adversely affect the project's ability to succeed?

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  Antisymmetric relations

How many relations on A are both symmetric and antisymmetric?

  State the multiple regression equation

State the multiple regression equation

  Managing ashland multicomm services

This question is asking you to compare the likelihood of your getting 4 or more subscribers in a sample of 50 when the probability of a subscription has risen from 0.02 to 0.06.]  Talk about the comparison of probabilities in your explanation.

  Evaluate function when f is u-u continuous

Evaluate function when f is U-U continuous.

  Skew-symmetric matrices

Skew-symmetric matrices

  Type of taxes and rates in spokane wa

Describe the different type of taxes and their rates in Spokane WA.

  Distributed random variables

Daily Airlines fies from Amsterdam to London every day. The price of a ticket for this extremely popular flight route is $75. The aircraft has a passenger capacity of 150.

  Discrete-time model for an economy

Discrete-time model for an economy

  Develop a new linear programming for an aggregate production

Linear programming applied to Aggregate Production Planning of Flat Screen Monitor

  Evaluate lim sup ek

Evaluate lim sup Ek

  Prepare a system of equations

How much money will Dave and Jane raise for charity

  Proof of bolzano-weierstrass to prove the intermediate value

Every convergent sequence contains either an increasing, or a decreasing subsequence.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd