Develop a new linear programming for an aggregate production

Assignment Help Engineering Mathematics
Reference no: EM13971

The purpose of this paper is to develop a new linear programming for an aggregate production planning of flat panel display. Here the objective function of LP model is to minimize the total cost of production in terms of several variables: demand planning, workforce planning, minimizing inventory holding cost, the inventory balance etc. below is the details:

Linear programming applied to Aggregate Production Planning of Flat Screen Monitor

Abstract

1. Introduction

2. Linear Programming Model Formulation

  • Problem Definition and Translation
  • Setting Parameters and Selecting Decision Variables
  • Linear Programming Model

   2.2 Gather Data

   2.3 Optimize Solution

   2.4 Validate & Test Model (LP output against factory cost, level production strategy, chase demand strategy and mixed strategy)

   2.5 Implement Results

3. Conclusion

4. References (IEEE, ScienceDirect, Elsevier, Springer etc.)

5. Appendix (any further mathematical calculations or Matlab programming codes)

6. Research for PhD level

Referencing styles: APA Style

Reference no: EM13971

Questions Cloud

Physics of medical imaging : Physics of Medical Imaging
The theory of evolution : The Theory of Evolution
Prominent faults : Research on the prominent faults
Long-term effects of air pollution : Long-Term Effects of Air Pollution
Develop a new linear programming for an aggregate production : Linear programming applied to Aggregate Production Planning of Flat Screen Monitor
Earthquake databases : Earthquake Databases
Construct a geologic time scale : Construct a Geologic Time Scale
Convergent plate boundaries and human society : Convergent Plate Boundaries and Human Society
Spatial and temporal variation of heat content in the upper : In this study the temporal and spatial variation of heat content in the upper 70m layer of the Arabian Sea was for a period of 1991 to 2008 have been attempted.

Reviews

Write a Review

Engineering Mathematics Questions & Answers

  Proof of bolzano-weierstrass to prove the intermediate value

Every convergent sequence contains either an increasing, or a decreasing subsequence.

  Skew-symmetric matrices

Skew-symmetric matrices

  Prime number theorem

Dirichlet series

  Antisymmetric relations

How many relations on A are both symmetric and antisymmetric?

  Find the probability density function

Find the probability density function.

  Type of taxes and rates in spokane wa

Describe the different type of taxes and their rates in Spokane WA.

  Managing ashland multicomm services

This question is asking you to compare the likelihood of your getting 4 or more subscribers in a sample of 50 when the probability of a subscription has risen from 0.02 to 0.06.]  Talk about the comparison of probabilities in your explanation.

  Distributed random variables

Daily Airlines fies from Amsterdam to London every day. The price of a ticket for this extremely popular flight route is $75. The aircraft has a passenger capacity of 150.

  Prepare a system of equations

How much money will Dave and Jane raise for charity

  Stratified random sample

Suppose that in the four player game, the person who rolls the smallest number pays $5.00 to the person who rolls the largest number. Calculate each player's expected gain after one round.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd