Projects and project managers and project life cycle

Assignment Help Project Management
Reference no: EM131187527

Projects, Project Managers, and Project Life Cycle

1. Assignment questions

Question 1 - Public and Private Projects (3 pages maximum)

You are a project manager employed by a small, reputable project management consultancy WS Consultants (WS). They act as client side project managers for public and private clients in the construction sector. There are several project managers employed and are all currently busy on various projects. You have recently completed a project and become available. Two projects have just been offered to WS (through WS reputation) to act as client project manager. Both could be attractive to undertake however WS can only choose one due to shortage of personnel in the company. Coincidentally the projects are almost identical in scope, but have different clients. The
projects are both in concept stage (approximately 5% design completed).

Project 1
Client - Australian Taxation Office (ATO)
Purpose - new office building for ATO workers (currently in another location in Melbourne CBD
and moving to a new larger building)
Scope - 7 storey office block (500m2 per floor), mid-level quality finishes
Location - CBD Melbourne

Project 2
Client - Mid tier developer TR Developers in Melbourne
Purpose - new office building - investment as they foresee growth in office accommodation in
Melbourne CBD
Scope - 8 storey office block (450m2 per floor), mid-level quality finishes
Location - CBD Melbourne

Your project director in WS wants you to submit a document to her outlining the following:
• Differences between the two projects, from a client project management perspective and other aspects
• Actions required by WS to work out the best project for WS to project manage
• Which project could be best for WS and why.

She is relying on your judgment to recommend a project for WS. Make assumptions, and use current information on construction or other aspects in Melbourne, where necessary.

Question 2 - Project Managers (3 pages maximum in words, plus any diagrams etc)
A large greenfield local government construction project is planned for Casey Council in suburban Melbourne (‘Bunjil Place' refer https://bunjilplace.com.au/). The scope of work is a modern library complex, civic centre, 800 seat auditorium, plaza, and art gallery, for a total cost of $125M. A design only and construct only (traditional) procurement model will be used. The client's project manager / team are permanent employees of the council, and the contractor will have an on site project manager responsible for carrying out all contract works.

The project has recently completed its tendering process and a construction contractor JM Construction (JM) has been appointed. Posession of Site will be given in 3 weeks with site establishment and construction to immediately follow. Construction Drawings will be issued in one week to the contractor. The Date for Practical Completion is 31 May 2018.

Explain how the following areas could be managed for the client, contractor, and how the two could work together, for best project outcomes, through the construction phase of the project.
• Time
• Cost
• Human Resources (include Communications also in this part).

Make assumptions, and use current information on construction or other aspects in Melbourne, where necessary. Detailed schedules and cost models are not required - explanations supported with broad quantities and diagrams where necessary are the objectives.
Notes The procurement model, schedule, and contractor for Bunjil Place being constructed currently is not exactly as described above. You do not need to contact Casey Council nor project parties for any information. The website link above is for information only about the scope of work.

Client Project Management Plans (PMPs) and contractor PMPs are developed early in a project and consider all ten of the knowledge areas - these plans are populated as the project progresses. This question requires advice on 4 knowledge areas (stated above) of the PMP, for the client and contractor, and how they interact, in the construction phase.

Question 3 - Project Life Cycle
Question 3a (1.5 pages maximum)
The following schedule is being considered by a client for a construction project.
• Initiate project and develop concept (by client) - 3 months
• Detailed design to 100% (by designer appointed by client) - 6 months
• Tender and appoint contractor (by client) - 3 months
• Construct (by contractor appointed by client) - 18 months
Briefly describe the advantages and disadvantages of this procurement model.

The client believes that the above 30 month schedule is too long and presents a business risk to the client. Discuss two practical ways and one contractual way the schedule could be reduced.

Question 3b (1.5 pages maximum)
A construction project manager is in the early design phase of a Design and Construct contract of a 6 storey concrete building in Parkville, Melbourne. He is trying to determine whether the beams, columns, and lift core can be made of precast concrete material instead of in-situ concrete.

Discuss three considerations and how they could be measured to help make a decision of whether to proceed or not to proceed with the precast option.

Attachment:- Assignment-Projects, Project Managers, and Project Life Cycle.rar

Reference no: EM131187527

Questions Cloud

Different types of shares options available : 1. Discuss why might a director argue reliance as a defence to a breach of duty and care? 2. Explain the defences relevant that can be argued for insolvent trading. 3. Explain share capital and the different types of shares options available.
The unique service characteristic of perishability : How is the phenomenon of online booking for travel related to the unique service characteristic of perishability?
Harmful to minority of members : The majority of members want to pass a resolution to change the constitution of IGA Ltd. This resolution would be harmful to minority of members as the majority members want to exploit the minority shares of the members. Advise whether such a reso..
Analyze how sql differs from a programming language : In addition to this, analyze how SQL differs from a programming language with which you are familiar. Explain your general opinions of SQL thus far, and classify it as easy or not, and as useful or not.
Projects and project managers and project life cycle : Explain how the following areas could be managed for the client, contractor, and how the two could work together, for best project outcomes, through the construction phase of the project.
Estimate the respective probabilities : Past tests on similar patients show the following conditional probabilities on the test result being positive (+), neutral (0), or negative (-): P(+|F) = 0.7 P(0|F) = 0.2 P(-|F) = 0.1 P(+|C) = 0.1 P(0|C) = 0.8 P(-|C) = 0.1 P(+|H) = 0.1 P(0|..
Explain faciones definition of critical thinking : Explain Facione's definition of "Critical Thinking ", and what does it mean to say that "critical thinking" is not negative thinking
Management team about market tests and risks : You are presenting a plan to your senior management team about market tests and risks. Risk testing is important and a suggestion has been made for you to consider the following risk categories: market-based risks, technological risks, manufacturi..
Pinpoint strategies for managing the risks : Multinational corporations must pinpoint strategies for managing the risks associated with the rise of State capitalism. Discuss the strategies available to them.

Reviews

Write a Review

Project Management Questions & Answers

  Matrix organizations versus project-type organizations

Explain what are the responsibilities of a project manager in a matrix-type organization and what about project-type organizations? Are there any differences?

  Expand for the enterprise-level projecttodays organizations

expand for the enterprise-level projecttodays organizations must recognize that the profile of enterprise-level

  Find project stakeholdersshow different ways how to

find project stakeholdersshow different ways how to identify project stakeholders? provide examples of how you as a

  Idea of karol adamovic

Henry Gantts Gantt Chart was originally an idea of Karol Adamovic, and was a 20th century revolution in the project management industry. however, since its discovery and usage, several soft wares have been developed in the computer age to advance ..

  Evaluate the ethical issues in complex project environments

Evaluate the ethical issues in complex project environments

  Calculate es and slack time for the activities

Calculate ES, LS, EF, LF, and slack time for the activities in Exercise- Identify the paths and path duration times.

  How would broadway book shop go about developing its

How would Broadway Book Shop go about developing its information systems? Justify your choice of your selected approach to systems development. What are the primary functional requirements for the system in the case study?What are the non-functional ..

  Show the organizational change communication

Was this communication method effective and what would have been the best way to communicate the change to the employees and why?

  Is this the most efficient arrangement possible would it be

is this the most efficient arrangement possible? would it be more efficient if more firms could produce vista? would

  Demonstrate effective communication skills

A People Choice Mobile Company just established 2 years in Melbourne and wants to expand their branch to Sydney.

  Appraise your own performance against the criteria

Task: 2 Appraise your own performance against the criteria of your designed form. Use your evaluation to recommend changes to the documentation or process which would improve motivation and change behaviour specific to yourself.  (LO2.3)

  Change management and changing scope of a project

What are the possible implications of this change request and what is one of the basic tools for managing changes?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd