Identify the critical path and other paths through network

Assignment Help Computer Networking
Reference no: EM13834877

This assignment consists of four parts.

Part 1: Develop an in-depth schedule for your initial project based on the Work Breakdown Structure you completed in Unit III. Please refer to the Integrated Project in Chapter 10 of the textbook on page 318 for more information.

Be sure to include:

1. An activity precedence diagram

2. An activity duration table

3. A network diagram and Gantt charts

Part 2: Please complete Case Study 10.2, "Project Scheduling at Blanque Check Construction" on pages 315 and 316 in the textbook and respond to the questions for discussion. Please make sure that each question is answered thoroughly using a minimum of 200 words for each case study question.

Part 3: Develop the network activity chart and identify the critical path for a project based on the information provided in the Gantt Chart Activity document. To access the Gantt chart activity document, click here.

1. Draw the activity network as a Gantt chart.

2. What is the expected duration of the project?

Part 4: Consider the project with the information provided in the Project Activity Network document. To access the Project Activity document, click here or on the link above.

1. Construct the project activity network using AON methodology and label each node.

2. Identify the critical path and other paths through the network.

Pinto, J. K. (2010). Project management: Achieving competitive advantage (2nd ed.). Upper Saddle River, NJ: Prentice Hall.

Reference no: EM13834877

Questions Cloud

Find a current article about business strategy : Find a current article about business strategy and write a 1- to 2-page paper discussing its relevance to the Week 5 team project; Bubble Films
What would have made the process go smoother : Describe the stages the group experienced in the context of Tuckman's stages. Please describe the situations involved. What would have made the process go smoother
How many kilojoules of energy does the bench absorb : How many kilojoules of energy does the bench absorb
Summarize the elements of the entrepreneurial process : Summarize the elements of the Entrepreneurial process. Use credible sources with in-text citation and create a references section
Identify the critical path and other paths through network : Construct the project activity network using AON methodology and label each node. Identify the critical path and other paths through the network
Explanation of the benefits and limitations of the approach : An explanation of which approach (health-planning or community development) would be most appropriate for the community problem you described as part of your Scholar-Practitioner Project. Justify your choice by providing an explanation of the bene..
Conduct a swot analysis on the case study : Answer provides correct and complete information demonstrating critical thinking: Conduct a SWOT Analysis on the case study company's CSR and business ethics practices
Increasing the promotional budget for a product : Increasing the promotional budget for a product in order to increase awareness is not advisable in the short run under which of the following circumstances?
Affect net exports at any given exchange rate : The rise in the US trade deficit during the 1980s was due largely to the rise in the US budget deficit. On the other hand, the popular press sometimes claims that the increased trade deficit resulted from a decline in the quality of US products relat..

Reviews

Write a Review

Computer Networking Questions & Answers

  How will the servers be deployed

Worldwide Advertising, Inc. (WAI) has hired you as an IT consultant. WAI is a new advertising firm, and they are currently hiring staff, establishing two locations, and have a need to get their internal IT services configured. How will the servers..

  Maintain and troubleshoot in network world

Troubleshooting. Given what we have studied to date, and your own experiences out there in "Network World," what is it that makes modern computer networks so easy -- or so difficult -- to maintain and troubleshoot

  Process of routers and switches

Do you think that one day, routers and switches will not be needed? Why?

  Dac system explain how mac system could be implemented

Given a DAC system explain how a MAC system could be "implemented" on top of this DAC system. Explain any problems and assumptions.

  A number of drivers of change have transformed the roles

a number of drivers of change have transformed the roles functions and responsibilities of an operations manager over

  Research and discuss packet-switched networks

Research and discuss packet-switched networks

  Question 1give details for the following terms as used in

question 1give details for the following terms as used in cryptographya block cipherb primitive rootc confusiond

  Explain in detail how fdma and tdma work

Explain in detail how FDMA, TDMA, and CDMA work. Give two examples of where each is currently used in the real world.

  What would have been the state of enterprise-wide networks

Describe the process of how one would distribute network protocols on the network. In the absence of SNMP and Remote Monitoring (RMON) protocols, what would have been the state of enterprise-wide networks

  What is the size of data in the ipv4 datagram

What is the size of data in the IPv4 datagram and what type of higher-level protocol is this datagram carrying?

  The 2 main types of communications media used for network

the 2 main types of communications media used for network connections are wired connections and wireless connections.

  Explain a short scenario in which a company might find this

just as your car requires regular oil changes for optimum performance a wireless lan requires routine maintenance to

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd