Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A buried horizontal concrete pipe (n=0.012) of unknown length needs to be replaces. the length is not known because the original plans for the pipeline route have been lost. the pressure head drop along the segment that needs to be replaced is 29.9 ft. If the flow rate is 30.0 cfs what length of new pipe is needed? How much would the answer change (in percent) if the n value was difficult to determine and could be assignes a value of 0.013 instead of 0.012? Assume minor loses are negligible and verify your results with computer software
The number of flaws on a sheet of aluminum manufactured by a certain process follows a Poisson distribution. In a sample of 100m2 of aluminum, 200 flaws are counted.
How to draw bending moment diagram for this shape and the value of the moment in critical sections assume that the distributed load (w) KN/M and the concentrated load
Use this information to estimate the demensions of the biofilter needed to treat 10,000 m^3/hr of air (at 30 C and 1 atm) containing 200 ppm styrene being emitted from a boat- manufacturing plant.
Consider a state with a total water withdrawal of 4.5 bgd in 2000. This was distributed as follows: municipal use 1.0 bgd, industrial use 1.5 bgd, and steam electric cooling 2.0 bgd
At the site of a large scale land reclamation project 2 m of sand overlie a silty clay layer 5 m thick, which overlies highly fractured permeable rock.
The aluminum block has a rectangular cross section and is subjected to an axial compressive force of 8kip. If the 1.5-in side changed its length to 1.500132 in., Determine Poisson's ratio and the new length of the 2-in side.
Find the depth and the top width of a v-notch capable of discharging a maximum of .7m^3/s and such that the head shall be 75mm for a discharge of 5.6 liters per second.
A 32mm rebar with a guage length of 200mm was subjected to tension to fracture according to ASTM E-8 method. if the rebar is loaded to 390kn only ad then unloaded, what is the premantnt change in length.
it was observed that the quantity of the water flowing through the sand layer into the collection ditch is 250 m^3/day. What is the hydraulic conductivity of the sand (k)
A 40-cm straight pipe is used to carry water at 20 degrees C from resevoir A to resevoir B that is 0.7 km away. There is an elevation difference of 9-m between the two resevoirs. Determine the discharge for
Three stock car drivers are racing around a circular bend. They are each circling the bend at different radii: r(1)=249 m , r(2)=255 m , and r(3)=261 m . At a given instant, all three are traveling at the same transverse rate of rotation
A culvert is to be constructed in a bed of sand (e = 0.5) for drainage purposes. The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd