How much would the answer change

Assignment Help Civil Engineering
Reference no: EM13559297

A buried horizontal concrete pipe (n=0.012) of unknown length needs to be replaces. the length is not known because the original plans for the pipeline route have been lost. the pressure head drop along the segment that needs to be replaced is 29.9 ft. If the flow rate is 30.0 cfs what length of new pipe is needed? How much would the answer change (in percent) if the n value was difficult to determine and could be assignes a value of 0.013 instead of 0.012? Assume minor loses are negligible and verify your results with computer software

Reference no: EM13559297

Questions Cloud

What is the maximum rate at which the current changes : An oscillating LC circuit has a current amplitude of7.30 mA, a potential amplitude of 250mV, and a capacitance of 205 nF. What is the maximum rate at which the current changes
Calculate the low point of the curve if the intersection at : A vertical parabolic curve is to be used as a sag curve, and it is desired to know the location and elevation of the low point. The curve is 750ft long , and the minus grade of 3.6 percent intersects the plus grade of 6.2 percent at station
What is the rotor''s angular velocity one minute after : The rotor of an electric generator is rotating at 200 when the motor is turned off. Due to frictional effects, the angular acceleration of the rotor after the motor is turned off is α=-0.01ω rad/s^2 , where is the angular velocity in rad/s.
Estimate how much coffee has spilled out of the beaker : During an all-night cram session, a student heats up a (0.7 x 10-3 m3) glass (Pyrex) beaker of cold coffee.Initially, the temperature is 18°C, How much coffee(in cubic meters) has spilled out of the beaker
How much would the answer change : A buried horizontal concrete pipe (n=0.012) of unknown length needs to be replaces. the length is not known because the original plans for the pipeline route have been lost.
What is the volume and base diameter of the resulting : Soil falls from a conveyor belt into a cone shaped pile at a rate of 1000lb/min. The bulk density of the soil is 110lb/ft^3. The height of the pile is equal to the base diameter
Determine what is the cost of its operation : a 300 watt toaster is plugged into a 120 volt house current.Electricity is sold at 15 cents per kilowatt hour. If the toasteroperates for 2.5 minutes what is the cost of its operation
How much tangent distance between the two curves is needed : A 6-lane freeway horiz. alignment has a 1200’ C.L. radius going into a tangent and then a reversing 1800’ radius. How much tangent distance between the two curves is needed to meet the superelevation runoff requirements?
Obtain the speed at which the water leaves the hole : A large storage tank, open to the atmosphere at the top and filledwith water, develops a small hole in its side at a point11.0 m below the water level. Determine the speed at which the water leaves the hole

Reviews

Write a Review

Civil Engineering Questions & Answers

  Estimate probability that given square meter of aluminium

The number of flaws on a sheet of aluminum manufactured by a certain process follows a Poisson distribution. In a sample of 100m2 of aluminum, 200 flaws are counted.

  How to draw bending moment diagram

How to draw bending moment diagram for this shape and the value of the moment in critical sections assume that the distributed load (w) KN/M and the concentrated load

  Estimate the demensions of the biofilter needed to treat

Use this information to estimate the demensions of the biofilter needed to treat 10,000 m^3/hr of air (at 30 C and 1 atm) containing 200 ppm styrene being emitted from a boat- manufacturing plant.

  Estimate the total water that will be withdrawn in 2015

Consider a state with a total water withdrawal of 4.5 bgd in 2000. This was distributed as follows: municipal use 1.0 bgd, industrial use 1.5 bgd, and steam electric cooling 2.0 bgd

  Use a numerical method to estimate the excess pore pressure

At the site of a large scale land reclamation project 2 m of sand overlie a silty clay layer 5 m thick, which overlies highly fractured permeable rock.

  Determine poissons ratio and the new length of the 2-in side

The aluminum block has a rectangular cross section and is subjected to an axial compressive force of 8kip. If the 1.5-in side changed its length to 1.500132 in., Determine Poisson's ratio and the new length of the 2-in side.

  Find the top width of a v-notch capable of discharging

Find the depth and the top width of a v-notch capable of discharging a maximum of .7m^3/s and such that the head shall be 75mm for a discharge of 5.6 liters per second.

  Calculate what is the premanent change in length

A 32mm rebar with a guage length of 200mm was subjected to tension to fracture according to ASTM E-8 method. if the rebar is loaded to 390kn only ad then unloaded, what is the premantnt change in length.

  Determine what is the hydraulic conductivity of the sand

it was observed that the quantity of the water flowing through the sand layer into the collection ditch is 250 m^3/day. What is the hydraulic conductivity of the sand (k)

  Smooth concrete and the flow gain if the highest capacity

A 40-cm straight pipe is used to carry water at 20 degrees C from resevoir A to resevoir B that is 0.7 km away. There is an elevation difference of 9-m between the two resevoirs. Determine the discharge for

  Determine the acceleration of the first two drivers

Three stock car drivers are racing around a circular bend. They are each circling the bend at different radii: r(1)=249 m , r(2)=255 m , and r(3)=261 m . At a given instant, all three are traveling at the same transverse rate of rotation

  Calculated the change in vertical effective stress on the

A culvert is to be constructed in a bed of sand (e = 0.5) for drainage purposes. The foof of the culvert will be located 3 m below ground surface. Currently the groundwater level is at ground surface.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd