Reference no: EM131258532
Kathleen McFadden, vice president of operations at Jackson Manufacturing Company, has just received a request for quote (RFQ) from DeKalb Electric Supply for 400 units per week of a motor armature. The components are standard and either easy to work into the existing production schedule or readily available from established suppliers on a JIT basis. But there is some difference in assembly. Ms. McFadden has identified eight tasks that Jackson must perform to assemble the armature. Seven of these tasks are very similar to ones performed by Jackson in the past; therefore, the average time and resulting labor standard of those tasks is known.
The eighth task, an overload test, requires performing a task that is very different from any performed previously, however. Kathleen has asked you to conduct a time study on the task to determine the standard time. Then an estimate can be made of the cost to assemble the armature. This information, combined with other cost data, will allow the firm to put together the information needed for the RFQ. To determine a standard time for the task, an employee from an existing assembly station was trained in the new assembly process. Once proficient, the employee was then asked to perform the task 17 times so a standard could be determined. The actual times observed (in minutes) were as follows:
The worker had a 115% performance rating. The task can be performed in a sitting position at a well-designed ergonomic work-station in an air-conditioned facility. Although the armature itself weighs 10.5 pounds, there is a carrier that holds it so that the operator need only rotate the armature. But the detail work remains high; therefore, the fatigue allowance should be 8%. The company has an established personal allowance of 6%. Delay should be very low. Previous studies of delay in this department average 2%. This standard is to use the same figure. The workday is 7.5 hours, but operators are paid for 8 hours at an average of $12.50 per hour.
Discussion Questions:
In your report to Ms. McFadden, you realize you will want to address several factors:
1. How big should the sample be for a statistically accurate standard (at, say, the 99.73% confidence level and accuracy of {5%)?
2. Is the sample size adequate.
3. How many units should be produced at this workstation per day?
4. What is the cost per unit for this task in direct labor cost?
Recession in the coming 12-months
: As the presidential election looms, we are hearing more about the potential for a recession in the coming 12-months. What signs should we be looking for to determine if it is indeed on its way? What are the implications on "your company" and how ..
|
How many housekeepers will be needed to clean the hotel
: How many minutes per day of actual room cleaning can each housekeeper do? - How many minutes of room cleaning will the Miami Central Hotel need today?
|
Marginal product of the second worker
: (Part A) What is the marginal product of the second worker? (Part B) What is the marginal revenue product (MRP) of the fourth worker? (Part C) What is the marginal cost (MC) of the first worker?
|
What would you tell managers at google
: Google is doing a lot for its employees, but obviously not enough to retain some talented employees. Using what you've learned from studying the various motivation theories, what does this situation tell you about employee motivation?
|
How many units should be produced at this workstation
: How many units should be produced at this workstation per day? - What is the cost per unit for this task in direct labor cost?
|
What is the mass flux of co out of the control volume
: The U.S. ambient air-quality standard for CO is 40 mg/m3. How long would it take before the CO concentration in the well-mixed ice rink air dropped to 40 mg/m3? Express your answer in units of hours.
|
Summarize alaska airlines human resources focus
: Summarize Alaska Airlines' human resources focus in your own words. - Why is employee empowerment useful to companies such as Alaska Airlines?
|
How ip addressing work with dns servers to process a request
: Draw a map, labeling every aspect, which represents how IP addressing works with DNS servers to process a request for a web page from your computer that returns the web page. Assume that it takes a few DNS servers to find the IP address.
|
What has hard rock done to lower employee turnover