Part 1:

Top management has accepted the schedule created at the end of Part. Prepare a brief memo that addresses the following questions:

1. How much will the project cost? What is the most expensive activity?

2. What does the cash flow statement tell you about how costs are distributed over the life span of the project?

Include a monthly cash flow for the project.

Once you are confident that you have the final schedule, save the file as a baseline.
Hint: Save a backup file just in case without baseline!

Part 2:

Part A

Today's date is July 8, 2015, the milestone date for the completion of the Prototype. You are charged with preparing a status report for top management. Table A2.8 summarizes progress on the Red Zuma project:

TABLE: Red Zuma Project Update

 

Task Name

Act. Start

Act. Finish

% Comp.

Phys. % Comp.

Act. Dur.

Rem. Dur.

1

1 Red Zuma

Fri 1/9/15

NA

46%

0%

125.85 days

146.4 days

2

 1.1 Market Analysis

Fri 1/9/15

Thu 2/12/15

100%

0%

25 days

0 days

3

 1.2 Product Design

Fri 2/13/15

Wed 4/1/15

100%

0%

35 days

0 days

4

 1.3 Manufacturing Study

Fri 2/13/15

Fri 3/6/15

100%

0%

16 days

0 days

5

 1.4 Product Design Selection

Thu 4/2/15

Fri 4/17/15

100%

0%

13 days

0 days

6

 1.5 Detailed Marketing Plan

NA

NA

0%

0%

0 days

15 days

7

 1.6 Manufacturing Process

NA

NA

0%

0%

0 days

30 days

8

 1.7 Detailed Product Design

Mon 4/20/15

Wed 6/24/15

100%

0%

49 days

0 days

9

 1.8 Build Prototypes

Wed 6/10/15

NA

39%

0%

9 days

14 days

10

 1.9 Lab Test Prototypes

NA

NA

0%

0%

0 days

10 days

11

 1.10 Field Test Prototypes

NA

NA

0%

0%

0 days

15 days

12

 1.11 Finalized Product Design

NA

NA

0%

0%

0 days

20 days

13

 1.12 Final Manufacturing Process

NA

NA

0%

0%

0 days

10 days

14

 1.13 Order Components

NA

NA

0%

0%

0 days

7 days

15

 1.14 Order Production Equipment

NA

NA

0%

0%

0 days

14 days

16

 1.15 Install Production Equipment

NA

NA

0%

0%

0 days

35 days

17

 1.16 Celebrate

NA

NA

0%

0%

0 days

1 days

Submit a professional status report to Robin Lane that addresses the following questions:

1. How is the project progressing in terms of cost and schedule?

2. What activities have gone well? What activities have not gone well?

3. How much of the project has been accomplished (PCIB)?

4. What is the forecasted cost at completion (EACf)?

5. What is the estimated completion date?

6. How is the project doing in terms of priorities (see Part 1)?

Report and interpret relevant Earned Value metrics in your report.

Include a Tracking Gantt chart as well as an Earned Value Table with your memo.

Part B

You have told Robin Lane that based on what you know now you need to revise the estimates for some of the remaining activities. Detailed Product Design is expected to take 3 days longer than planned. Build Prototypes is expected to take 2 days less than planned and Finalized Product Design is expected to take 3 days longer than planned. Final Manufacturing Process is expected to take 2 days less than planned, while Install Production Equipment is now expected to take only 30 days.

You also report that Detailed Marketing plan will be completed before the end of the New Year. She is insisting that the project be completed by January 17th in order to be ready for the Las Vegas show. She is willing to spend $50,000 from Management Reserves to expedite shipping if necessary. $25,000 would reduce the shipping of components by 5 days and/or $25,000 would reduce the shipping of manufacturing parts by 5 days (Hint: Adjust lag).

Prepare a memo to Robin that addresses the following questions:

1. What is the impact of the revised estimates for Finalized Product Design and Install Production Equipment on the project schedule and cost?

2. Would you recommend authorizing the expenditure of $50,000? Explain.

3. What, if any other recommendations, would you make so that the project can achieve Robin's deadline? Justify your recommendations.
Include a Tracking Gantt chart with variance schedule that depicts your final recommendations and revised schedule.

Hint: After adjusting the Installation of Production Equipment and Finalized Product Design, level outside of slack to eliminate any resource over allocation problems.

Verified Expert

The solution document contain 2000 words which discussed about red zuma project. It has solution for part-3, Party 4a and part 4b memos with cash flow schedule and table.

Reference no: EM13985025

Questions Cloud

What is the magnification : The lens is made of a material with an index of refraction of 1.5. If an object is placed 10 cm to the left of the lens where will the image be formed? What is the magnification? Is the image is real? Is the image inverted? Draw a ray diagram for ..
What is the minimum diameter the wire should have : The elastic limit for the wire is 2.0 x 108 Pa. What is the minimum diameter (in mm) the wire should have to support her?
Conditional expectation in bridge : Let X be the number of clubs in the hand of North and Y the number of clubs in the hand of South in a bridge game. Write a general formula for E.X jY D y/, and compute E.X jY D 3/. Can you compute E.Y jX D 3/?
Ethics and information technology : The APA style three page paperon ethics and information technology and how it touch the ethics of using technology how complicated making ethical decisions about its use truly is. Portents of this cannot be overstated as you know simply by living in ..
How costs are distributed over the life span of the project : How much will the project cost? What is the most expensive activity - what does the cash flow statement tell you about how costs are distributed over the life span of the project?
Discuss the concept of video sharing : Explain how to market with article directories, e-books, and white papers. Discuss the concept of video sharing. Explain benefits of marketing with online videos
How is metamaterials not an existing tag : I understand how one can obtain a -ve ρ by constructing a solid-solid system with vastly different speeds of sound? How is metamaterials not an existing tag?
What is the electric field potential at a point p : Two point charges of +2.00 μC and +4.00 μC are placed at the origin and at y = -0.300m, as shown in Figure 20-8. What is the electric field potential at a point P at a position x = 0.400 m due to the charges?
Experiment of picking one word at random : Consider the experiment of picking one word at random from the sentence

Reviews

Write a Review

Project Management Questions & Answers

  What is the severity of this change

What is the requested change and what is the severity of this change - what is the severity of this change

  What you need to know about project managementcan you help

what you need to know about project managementcan you help me get started with this assignment?type 1 projects usually

  Advantages and disadvantages of inspection

What are the advantages and disadvantages of workers having more control over the inspection of their own work?

  Principles of project management

Example an organization or a product from an industry that you are familiar with, critically discuss the main factors that influence the choice of a manufacturing/service process design.

  Computing value of the depreciation tax shield

The company has a marginal tax rate of 34 percent. What is the value of the depreciation tax shield?

  Interest and taxes under the expected case scenario

What is the earnings before interest and taxes under the expected case scenario?

  Explain purpose of each part of life cycle of project

Use characteristics of the project to distinguish it from operations work. Explain the life cycle of project and describe the purpose of each part of the cycle.

  Describe the management style you would bring to the job

Research has shown that first time managers are prone to make similar mistakes in their new position. Describe the management style you would bring to the job so as to not be ineffective

  What is the optimal daily profit

Profits for regular soft drink are $3.00 per case, and profits for diet soft drink are $2.00 per case. What is the optimal daily profit?a. $220

  How many labor hours should the eighth satellite require

How many labor hours should the eighth satellite require? How many labor hours for the whole project of eight satellites?

  Critically analyses the key strategic issues the firm

Critically analyses the key strategic issues the firm faces in expanding into this market (opportunities and threats in the firm's external environment plus strengths and weaknesses in the firm's internal environment).

  Change management and changing scope of a project

What are the possible implications of this change request and what is one of the basic tools for managing changes?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd