Explain why systems implementation sometimes fails

Assignment Help Project Management
Reference no: EM131150762

Question:

Following with construction of a system, a system conversion is the process by which the new system replaces the old system. If a total new system is implemented, it is called an installation. The conversion style can vary from direct or parallel conversion. Direct conversion is a total cutover to a new system while in parallel, the new system is operated side by side with the old system. Conversions can be pilot conversions with selected modular units or locations, or phased conversions where systems are installed sequentially, or simultaneous conversions where all locations are converted simultaneously.

After an installation or conversion, the system is maintained to ensure it continues to meet business needs through some refinement. System maintenance is controlled by maintenance requests, which are approved and scheduled for development. Maintenance can be classified as preventive, corrective, adaptive, and perfective maintenance.

Maintenance personnel must also have a mechanism for documenting system errors and how they were resolved. These are sometimes called system error logs, and they are particularly important for large systems. It is useful for many reasons. It provides a record of what was done in case questions arise about the error or its resolution in the future. It also allows for tracking the type of errors and when these occur. It can also provide key data for many Key Performance Indicators such as number of system down errors, etc. It also assures that all reported errors and maintenance requests are logged and become part of the process of assessment and prioritization.

Typically companies have urgency levels or priorities on their error log. Errors that are severe in nature are frequently described as system down errors (the system will not operate correctly without resolution). These errors are assigned top priority and are resolved immediately. Exactly what 'immediately' means is based upon the application. If the application is a 24 x 7 application, it is likely that a programmer will be called and will begin work to resolve the error regardless of the time of day. If the application is less critical, it may mean that the error will be resolved during business hours.

With system down errors, unit testing is performed on the code, but system testing is not always done immediately. Sometimes components of an overall system test are performed on the modified code, but frequently unit testing is all that is done immediately. This means that after the revised code is installed, a process must be in place to ensure that it is fully system tested within a reasonable timeframe. If not, errors could be unintentionally introduced into the system again.

Required Reading

Krar, S. (n.d.). The importance of maintenance. Retrieved from https://www.automationmag.com/images/stories/LWTech-files/94%20Intelligent%20Systems.pdf

Takhur, D. (2012). What is system maintenance: What are the different types? Retrieved from https://ecomputernotes.com/mis/implementation-and-evaluation/what-is-system-maintenance-what-are-its-different-types

Explain why systems implementation sometimes fails. Secondly, describe several factors that influence the cost of maintaining an information system. Write this assignment in 2-3 pages.

You will be particularly assessed on:

Your ability to see what the module is all about and to deliver the assignment including 2-3 references.

Your ability to use software techniques and terminology of systems analysis and design correctly and in context.

Your paper submission must be in MS Word format.

References properly cited a must.

Verified Expert

This is a 700 word assignment written in Microsoft word that describes about the installation of information system. It also highlights some of the major factors for the failure of the installation process. Not only that the work also took out the main factors which add to the cost of maintenance of the information system. The work have incited references and is written in APA form of referencing.

Reference no: EM131150762

Questions Cloud

Define the main elements of the systems framework : Major Characteristics of U.S. Health Care Delivery Prompt: First, what are the 2 main objectives of a health delivery system? Next, what are the 10 characteristics of the U.S. health care system? What is the purpose of the systems framework? Name and..
Understanding of the effectiveness of maintenance : What types of measurements must be taken to gain an understanding of the effectiveness of maintenance? Why is tracking mean time between failures an important measurement?
Different methodologies to audit their services : The Centers for Medicare and Medicaid Services uses a number of different methodologies to audit their services. Search "CMS audit tools." Evaluate the results. Are they what you expected?
Shorten the given essay : Shorten the given essay- It's 5am and my father is up ready to open one of five convenience stores. After a few hours of working, he will rotate his time to the other sections to conduct business paperwork.
Explain why systems implementation sometimes fails : Explain why systems implementation sometimes fails. Secondly, describe several factors that influence the cost of maintaining an information system. Write this assignment in 2-3 pages.
Discuss how to apply or implement strategic planning : Discuss the premise underlying each of the three models of strategic planning and the advantages that each brings to the process. Discuss how to apply or implement strategic planning using each of the methods
Describe how ebp is used in your practice setting : The PICO (T) format is a way to develop a clinical question that lends itself to searching for evidence. Select a common nursing practice (e.g., wound care management) in your clinical setting and formulate a PICO question. Once you have formulate..
Describe your overal goals-short and long-term : Write a development plan for yourself specific to your career progression (international business). Development goals (describe your overal goals, short and long-term) Next assignments (indentify pontential next assignments that would help you develo..
Describe the process of coding and testing : Describe the process of coding, testing, and converting a large organizational information system and outline the deliverables and outcomes of the process

Reviews

Write a Review

Project Management Questions & Answers

  Draw a network for the project using aon method

Draw a network for the project using AON method and evaluate the critical paths and identify them by double lining the arrows connecting the activities on the CP

  Project management - multitasking

Multitasking has become the norm in our everyday society and why is it important for a project manager to be aware of multitasking during a project?

  What is technology s-curve

What is technology S-curve? Provide an example that explains how to use S-curves to prescribe development of new component technologies.

  Evaluate the cause and continue producing way

Stop production and get the process right and investigate the chart construction because values cannot fall below the lower control limit on a range chart

  What will be your next steps in order to re-route project

What will be your next steps in order to re-route the project for success and what do you think will be your challenges and risks?

  Grainger manufacturing inc produces outdoor grills on march

grainger manufacturing inc. produces outdoor grills. on march 31 the company had 120 grills in inventory. the companys

  What role does conflict play in group communication

Explain what role does conflict play in group communication and explain what role does conflict play in group communication?

  Describe qualitative and quantitative risk analysis

Compose project plan and sub-plans that establish how various organizational elements will work and interface to include problem resolution processes.

  Computing minimum total direct cost for project durations

Compute the minimum total direct cost for each of the following project durations (based on the cost associated with each activity): 13, 14, 15, 16, 17, and 18 weeks.

  Various ways to determine budgets for the individual

various ways to determine budgets for the individual taskstask name phase 3 discussion board 2details the company has

  Critique the procurement strategy and indicative timescale

Critique the procurement strategy and indicative timescale for project completion along with indicative program based on the chosen procurement strategy.

  Success factors that affect project management

The body of the paragraphs should have quotation should not be long and preferable in own words.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd