Explain the following hypothetical scenario

Assignment Help Computer Engineering
Reference no: EM1326818

Consider the following hypothetical scenario. A hypothetical company has grown substantially using an acquisition strategy. As new companies were acquired, new systems that those companies were using were also acquired. At this point, this company has "one of each" of the core, production system (this could be an ERP, HR/Finance, manufacturing, or any other enterprise-level system.) It is clear to everyone that over time following this strategy created many problems and inefficiencies.

The new CIO and his biker buddy the COO decide to form a Steering Committee to clean up the mess. They involve the key decision makers from their respective organizations and get the commitment from Senior VP of Marketing. The CIO and the COO make it clear that they are the executive co-sponsors of this effort.

The Steering Committee commissions the feasibility study and determines that consolidation of the systems will result in significant operational, support, and licensing savings. It determines that many positions will no longer be needed. It also determines that none of the existing systems are year-2000 (Y2K) compliant.

Meanwhile, the Steering Committee participants spread the word around to their rank and file, and although systems consolidation will mean that positions will be lost, most people feel that "it was about time someone did something about the mess."

The Steering Committee next commissions a market survey to determine commercial availability of a replacement system. Three months are budgeted for the market survey. A consultant is brought in to draft a SRS based on the composite features of the existing systems, new requirements, and Y2K compliance requirements. Working closely with the Operations staff and Information Systems staff, and consulting with the Marketing, the consultant develops the SRS and a request for proposal (RFP). RFP is fielded, responses evaluated, a vendor selected, and a contract negotiated. The project plan for the systems consolidation and replacement is organized into several phases roughly approximating the lines of business. The overall project plan budgets nine months and is scheduled for completion with about three months to spare before the clock strikes midnight on December 31, 1999.

The project is off to a slow start, but the co-sponsors personally "drag" some of the reluctant decision makers to the now regular weekly Steering Committee meetings. Actually, the two sponsors participate in all Steering Committee meetings to ensure that issues are identified, defined, and addressed, and that the necessary resources are made available. Many, many problems are encountered; too numerous to list here. The problems range from the vendor misrepresenting some of the capabilities of the system, lack of certain required functionality, performance issues, platform instability, and on and on...The Steering Committee organizes many swat teams and slowly all issues are overcome: some through fixes and some through workarounds. Almost everyone within the company is aware of this project, and many of the staff are invited by the Steering Committee at one time or another to provide their input to solving some of the issues and problems. Although there appears to be some communication redundancy, overall everyone is "kept in the loop" well and timely.

So how does this hypothetical story end? The project goes over budget and beyond the schedule, but not by much. The expected efficiencies are obtained, although it took a little longer than planned. Some positions are eliminated, but there were no surprises and many were able to transfer elsewhere within the company. Everyone who participated in the project learned a lot.

Would you say that this was a well-managed or poorly-managed system implementation? Identify and discuss at least three specific elements that make it a well-managed or poorly-managed implementation. Be sure to explain why and be specific.

Reference no: EM1326818

Questions Cloud

Explain the characteristics of a high performance team : Listing and define six major SDLC phases and the products of each. Indicate the CASE tools that would be used to support each phase.
Explain how has the introduction of females : Explain how has the introduction of females also minorities in the corporate structure impacted the supply of labor and the economy.
Explaining the law scenario : The principal partner, whose name is first on the door and who generates the most income for the firm, has had a regular turnover of admins.
Blanchard-s situational leadership : Utilize Blanchard's Situational Leadership II on someone with whom you are familiar (it can be yourself if you choose).
Explain the following hypothetical scenario : The new CIO and his biker buddy COO decide to form a Steering Committee to clean up the mess. They involve the key decision makers from their respective organizations and get the commitment from Senior VP of Marketing. The CIO and COO make it clea..
Illustrate what is the estimated size of the union salary : Illustrate what is the estimated size of the union salary advantage. How might this advantage diminish the efficiency with which labor resources are allocated.
Organizational behavioral theories predicting failure : Describe how Organizational Behavioral theories could explain or predict the failure of this company's management.
The cost of maintenance over a lifetime of a system : What are some of the things management can do to ensure efficient and effective maintenance.
Elucidate how it affects different cultures also societies : Describe prison labour and elucidate how it affects different cultures also societies and explain the rise and fall of labour in prisons.

Reviews

Write a Review

Computer Engineering Questions & Answers

  Justify the utilization of a particular level

we are learning about Online instant storefronts and the 3 different categories. I am not sure I understand the difference between these. Please help to me identify each and differ between them. Also if you can let me know what potential customer a..

  A non-linear circuit problem

Computer program which will calculate the voltage across a resistor in the circuit

  Designing the flow chart and algorithm

Write down an algorithm and develop a flow chart to find all the people who have computer experience and at least five years of company service.

  Explain the osi model and data frames

Why should network architects concern themselves.

  Four methods to provide data backup

What are the four methods used by the servers in order to provide the data backup, decrease the response time, and decrease the network and the server access time?

  Write a java program that uses a two-dimensional array

Write a Java program that uses a two-dimensional array

  Evaluating the post fixed expression

Approximate the post fixed expression a) Initialize an empty stack. While there exist more symbols within postfix string { b) If token is an operand, push it onto the stack. If token is an operator

  Writing down the code

Suppose that the a, b and c are char variables has been declared. Write some code which reads the first character of next line into a.

  What does this following algorithm calculate

What does this following algorithm calculate

  Software engineering and microprocessor systems

Software is required for a simple house burglar alarm system.

  Give description on wireless communication

As an IT consultant, you have been tasked to implement wireless communication for a car company with about with 1500 associates. In four locations.

  How can a relation be organized in mass storage

How can a relation be organized in mass storage.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd