Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A proposed earthen dam will contain 5,000,000 cubic meters of earth. Soil to be taken from a borrow pit will be compacted to a void ratio of 0.78. The void ratio of soil in the borrow pit is 1.12. Estimate the volume of soil (cubic meters) that must be excavated from the borrow pit.
a) Determine the total shortening of the pile in terms of F, L, A, and E; b) If F=96 kips, L=40 ft., A=100in2, and E=1.5 x 106 psi, how much does such a pile shorten?
Evaluate the pressure head at point a and determine the vertical effective stress at point b and evaluate the lateral pressurein the brown clay
Calculate the Air flow required in CFM to transfer 5,396 BTU/Hour in an HVAC duct given that the temperature difference (Delta-T) between the room and the supply air is 21 DegF.
What difference does the tightening of bolt in the friction grip joint make to the load at first slip and the failure load.
Calculations with steam mixed with additional steam at a different pressure, A steam press at 650Kpa + dryness fraction of 0.9% flows along a pipe at a rate of 3.5Kg per second
The rigid bar of negligible weight is supported as shown. Find the stress in each rod if the temperature rises DeltaT after a load P is applied. Use the following data: area of steal rod 320mm2, bronze rod 1300mm2, thermal expansion coefficient Al..
Design a three story office building
A gas is compressed at a constant pressure of 0.800 atm from 9.00L tp 2.00L. in the process, 400J of energy leave the gas by heat. (a) What is the work done on the gas? (b) What is the change in it internal energy?
A 600 MWe power plant has an efficiency of 36% with 15% of the waste heat being released to the atmosphere as stack heat and the other 85% taken away in the cooling water.
Land is extremely valuable in this area therefore to win this job you need to consider innovative approach to reduce the waste areas
I want to use PESTAN model for a project, can you please tell me any real scenario with available data on which I can formulate a project preferably related to oklahoma.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd