Effective communication in the context of project management

Assignment Help Project Management
Reference no: EM131048282

Question:

The project manager skills, project selection models, the project charter, scope statements, top-down and bottom up estimating, work breakdown structure, executing stage, and communication.

The learning objectives for week 6 as stated in the Learning Module 6 includes:

- Recognize and manage for constraints and limited availability of human resources
- Employ interpersonal and management skills to address and manage conflicts among stakeholders
- Create stakeholder management strategies to maximize positive stakeholder impacts and minimize negative stakeholder impacts
- Describe the importance of effective communication in the context of project management

In week six we have a case study assignment. As stated in the rubric the goal of the project execution, reporting, and managing resources case study is to apply the project management knowledge you have gained in the course and to challenge you to critically apply knowledge gained in a real-project situation. The analysis should include evaluation of the following:

- Project Schedule and Cost Management -Evaluation of the project manager's compression of the project schedule

- Evaluation of the project cost and schedule variances

- Project Conflict and Team Management -Managing project conflict

Team management

.Stakeholder Engagement and Resource Allocation

-Project manager communication and stakeholder engagement
-Human resource allocation and management

Requirements of submission: Evaluation of the case study should be approximately 750 words, using 12-point Times New Roman font, double spacing, one-inch margins, and a minimum of two references in APA format.

You are to use the graded Case Study located in Learning Module 6 Sections 6.14 through 6.14.4 all four parts.

Project Monitoring and Control

When the first batch of components was ready to be installed on SRT''s fleet, Varga decided that each and every part needed to be inspected to ensure that no defects found their way to the customer. She oversaw a process to inspect each piece of hardware for visible defects, boot up the operating system, and test the GPS devices and other components. In doing so, inspection staff used a checklist to make sure that each feature met the customer''s requirements and was capable of its intended performance.

Reviewing the completed checklist and other inspection documentation, Varga saw that some of the terminal casings did not meet the client''s specified dimensions and would not mount properly in the cab space. Based on a cause-and-effect diagram and further analysis of the problem, the quality control team determined that the high percentage of defects was due to a flaw with one of the machines in the casing supplier''s production facility. Liu sent the defective terminals back to ECO-Trans'' assembly team to be reassembled in new casings. Because there were extra casings available on site, she didn''t think it was necessary to discuss the problem with the supplier.

As you complete this last section of the case study, identify the problems and/or issues that you''ll need to include in your analysis. Document this information, and con

Attachment:- case study.zip

Verified Expert

The paper is about a case study in which Varga is responsible for all the activities and knowing how she has to manage the cost, the schedule, the conflict and human resources apart from various other things for the project. The paper discusses and analyses various questions that are concerned with these topics of the case and how they can be resolved in a more efficient manner. The paper has been prepared in Microsoft office and is of 900 words.

Reference no: EM131048282

Questions Cloud

Elements of intention and agreement required for formation : Using the 4 step process, discuss the whether the elements of intention and agreement required for the formation of a legally enforceable contract are present in the scenario
Prepare a formal income statement and balance sheet : Prepare a formal Income Statement (Report of Income) and Balance Sheet (Report of Condition) for the bank using Excel. You do not need to break down assets or liabilities into subsections.
Perform critical analysis of the system design process in : Perform Critical Analysis of the System Design Process in Mines in your words.
During a critical developmental period affect the behavior : Hooded rats: social play times. How does social isolation during a critical developmental period affect the behavior of hooded rats? Psychology students assigned 24 young female rats at random to either isolated or group housing, then similarly as..
Effective communication in the context of project management : Identify the problems and/or issues that you''ll need to include in your analysis. Document this information, and con - Recognize and manage for constraints and limited availability of human resources and Employ interpersonal and management skills to..
Prepare an outline of how you would choose to communicate : U.S. President-and prepare an outline of how you would choose to communicate that figure's relevance to today. This is not a biography. Your argument should highlight how society remembers your historical figure now.
Relationships among the portrayal of anger or sadness : Angry women, sad men. What are the relationships among the portrayal of anger or sadness, sex, and the degree of status conferred? Sixty-eight subjects were randomly assigned to view a videotaped interview in which either a male or a female profes..
Critically analyse the effectiveness of leadership portrayed : Critically analyse the effectiveness of leadership portrayed in the movie you have selected using the framework for assessing leadership effectiveness
How society remembers your historical figure now : This is not a biography. Your argument should highlight how society remembers your historical figure now, based on the philosophies and ideals he or she presented or helped to change and evolve.

Reviews

Write a Review

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd