You are asked to design a pump station to conveywaste water at a flow rate of 250 cubic meters per hour to anequalization tank. A velocity of at least 3ft/s must be maintainedin the pipe to prevent deposition and provide scouring of anypreviously deposited solids. However, a maximum velocity of 10ft/sis prescribed to prevent oversizing the pumps. Due to the nature of the waste water, you want to target the high end of this range.Find the proper diameter pipe to the nearest 2" to achieve thisdesign objective.
A 600 ft vertical crest curve crosses a 4 ft diameter pipe at rightangles at station 110+85. The PVI of the vertical curve is station110+00 and elevation 1098.4 ft with an incoming tangent grade of1.2% and an outgoing tangent grade of -1.8%.
The two disks each have a mass of 25kg and are attached at their centers by an elastic cord that has a stiffness of k = 1.6kN/m . Determine the stretch of the cord when the system is in equilibrium
The elastic portion of the tension stress-strain diagram for an aluminum alloy. The specimen used for the test has a gauge length of 2 in and a diameter of 0.5 in. When the applied load is 9 kips, the new diameter of the specimen is 0.49935 in.
A bus line 4 miles long runs through an area with 1/6 acre lots,3.5 people per household, average 1 car per household. People will walk up to 1/6 mile to a bus stop, so stops are located 1/3 mileapart along the route.
A rectangular steel bar shown is fixed at the right end has a thickness of 20 mm. The temperature is increased by 20C and a force F is applied as shown midway along the bar. Use the properties E=200 GPa, a=12(10^-6)/C.
According to the design philosophy in the AASHTO Specifications, how does a heavy truck parked on a prestressed bridge girder effect the nominal shear resistance of the girder
Design a one way slab to support a uniform live load of 300 psf. The beam is simply supported with a span of 20 ft. Use a reinforcement ration ( Ps) of 0.008 Use f'c=3000 psi and fy=60000 psi.
A soil is to be compacted on a site and it is expected that the soil contains a high percentage of montmorillonite. Briefly explain the working principles of two tests that can be carried out to ascertain the presence of montmorillonite in the soil.
Write a C program that calculates the factorial of the number from 0 to the integer N, which is not greater than 10
The beam has a flange width b=8 in. If the maximum bending stress is not to exceed σallow=22 ksi, determine thegreatest weight of the machine that the beam can support. The center of gravity for the machine is at G, and the supports at Band C are smo..
Given below are the measured stream flows in cfs from a storm of 6-hour duration on a stream having a drainage area of 185 mi^2. Derive the unit hydrogaph by the inverse procedure. Assume a constant base flow of 550cfs.
A small blimp is temporarily moored wherein DC and the centerline of AB are coplanar. A force F from wind, weight, and buoyancy is shown acting at the centerline of the blimp. If F = 5i+ 10 j + 18 k kN
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd