Development of a project charter

Assignment Help Project Management
Reference no: EM13308318

Class: Advance Project Management

I would like to start a restaurant (no matter what kind) for my project, and the project must have a clear set of objectives, start and end date, budget, stakeholders, resources to be managed, etc. please don't focus more on planning the ongoing operation of the restaurant, which is, by definition,not a project.

 

Here what i want you to do

 

Component 1: Identification and description of your project. Development of a Project Charter.

 

Component 2:  Identification of the appropriate project organization, including identification of Stakeholders, Team Members, and their associated roles and responsibilities.

 

Component 3: Development of a project budget, including an estimate of all costs, benefits, ROI, and Payback. This component must be completed in Excel.

 

Component 4:  Develop a Change Management Plan and a Risk Management Assessment and Plan for your project.

 

Component 5:  Develop a plan for Status Monitoring and Reporting, Issues Tracking, and Escalation.

 

 

 

Reference no: EM13308318

Questions Cloud

Find what is probability of failure with standard deviation : A column has a mean capacity of 950 kip. The standard deviation for the column capacity is 50 kip. The average load is 700 kip with a standard deviation of 75 kip. What is the probability of failure, pf
Find the dimensions of the poster with the smallest area : The top and bottom margins of a poster are 4 cm and the side margins are each 5 cm. find the dimensions of the poster with the smallest area
How much electric power would be produced by these falls : Water flows over a waterfall, which is 120 m high, at a rate of 1.30E+6 kg/s. If half the potential energy of this water were converted into electric energy, how much electric power would be produced by these falls?
Calculate the maximum compression of the spring : A 23 kg box slides 4.0 m down the frictionless ramp shown that is raised 30 degress from the ground , What is the maximum compression of the spring
Development of a project charter : Identification and description of your project. Development of a Project Charter.
Determine the initial gas in place : Determine the initial gas in place and what percentage of the initial gas in place will be recovered at a p/z of 1000?
Will water bubble into the vapor phase under the circumstace : A student in the laboratory plans to exert a vacuum in the head space above a surface of water in a closed tank. She plans for the the absolute pressure in the tank to be 10,400 Pa. The temperature in the lab is 20°C.
What is the average magnitude of the force on the ball : A force in the negative direction of an x axis is applied for 27 ms to a 0.24 kg ball initially moving at 16 m/s in the positive direction of the axis. The force varies in magnitude, and the impulse has magnitude 45.1 N s.
What are the dimensions of such a cylinder : A cylinder is inscribed in a right circular cone of height 2.5, What are the dimensions of such a cylinder which has maximum volume

Reviews

Write a Review

Project Management Questions & Answers

  Case of a member of a manager-managed llc

Case of a member of a manager-managed LLC - Eric is a member of a manager-managed LLC but is not a manager. This LLC invests in real estate and manages it as rental property in a college town.

  Current company for selection of investment projects

Explain which three of these investment criteria you recommend for use at your current company for the selection of investment projects

  Project charter and project scope statement artifacts

Why are the Project Charter and Project Scope Statement artifacts critical to the success of a project? Describe some of the key elements of these artifacts.

  Unimed is a manufacturer of specialty medical equipment

Unimed is a manufacturer of specialty medical equipment. For one particular varety of equipment offered:Average daily demand is 25 units, with a standard deviation of 6 units

  Earned value approach for variance analysis

How can the project baseline and the earned value approach for variance analysis be used to monitor and report project progress?

  Winsome manufacturing project scope

Create a description of the project's scope only as it relates to the sales and marketing activities and explain the deliverables the team will produce, what type of information it will contain, and the level of detail expected.

  Explain how can a project manager build and manage

Explain how can a project manager build and manage a successful project team and how does this change under the conditions described in the scenario?

  Monthly status report to sponsors

Monthly Status Report to Sponsors

  Calculating the operating leverage

Calculate the operating leverage for the electric scooter project assuming unit sales are 100,000 (see Section 10 - 2).

  Challenges in project management

Challenges of managing projects involving teams with members from multiple ethnic and sociopolitical backgrounds

  Capital attributable to the project

Current rental income of a building owned by the firm if it is not used for this project and the decline in sales of an existing product directly attributable to this project.

  What is the minimum number of service bays fast lube needs

what is the minimum number of service bays fast lube needs to achieve an anticipated production of 300 cars per 8 hour day?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd