Reference no: EM13499054
A Not-for-Profit Organization
CASE QUESTIONS
1. What are the needs that have been identified?
2. What is the project objective?
3. What assumptions, if any, should be made regarding the project to be undertaken?
4. What are the risks involved in the project?
A Not-for-Profit Medical Research Center
CASE QUESTIONS
You and your team need to prepare a plan to present to the board. You must
1. Establish the project objective, and make a list of your assumptions about the project
2. Develop a work breakdown structure
3. Prepare a list of the specific activities that need to be performed to accom¬plish the project objective
4. For each activity, assign the person who will be responsible
5. Create a network diagram that shows the sequence and dependent relation¬ships of all the activities.
|
State how many kilograms of sodium hypochlorite
: If there are 1.8 million people served by this water and each person uses 750 L of water a day, how many kilograms of sodium hypochlorite must be added to the water supply each week to maintain the 1.00ppm chloride level
|
|
Determine the pans distance from the ceiling
: A mass-less pan hangs from a spring that is suspended from the ceiling. When empty, the pan is 51 cm below the ceiling. What is the pan's distance from the ceiling
|
|
Need a paper on managing project resources
: Need a paper on Managing project resources: time, cost, quality, risk, and scope
|
|
To find out the approximate mass of a small sherical
: To determine the approximate mass of a small sherical shot of copper the following experiment is preformed: 125 pieces of shot are added to 7.9ml of water in a graduated cylinder and the volume becomes 8.3ml.
|
|
Develop a work breakdown structure
: Establish the project objective, and make a list of your assumptions about the project and develop a work breakdown structure
|
|
Solid calcium oxide thereby forming solid calcium sulfite
: The foul air power and light company has been ordered to remove sulfur dioxide from its smoke stacks. Management decides to pass the gas over solid calcium oxide thereby forming solid calcium sulfite.
|
|
Prepare all journal entries to record the information
: Prepare a trial balance as of December 31, 2012. (As you compute the amounts to include in the trial balance, don't forget the beginning balances left over from 2011.)
|
|
What impulse does the player experience
: A 68.1-kg basketball player jumps vertically and leaves the floor with a velocity of 1.92 m/s upward. (Take upward as positive and forward as positive.), What impulse does the player experience
|
|
Determine the velocity of each block just before collision
: Two blocks of masses m1 = 2.00 kg and m2 = 3.60 kg are each released from rest at a height of h = 4.80 m on a frictionless track, Determine the velocity of each block just before the collision
|