Work Breakdown Structure Review

Introduction:

The work breakdown structure (WBS) forms the basis for subsequent scheduling, estimating, and monitoring/controlling activities. It is critical, therefore, that the work breakdown structure clearly communicatesthe scope of work and the project manager's intent with respect to how the project is to be structured.

Some of you may have had the opportunity to develop a work breakdown structure in your professional careers; some may have had the opportunity to develop a work breakdown structure in the PMAN fundamentals class. In this review assignment, you will have an opportunity to brush up on your WBS knowledge and skills.

Scenario:

You have been recruited by your neighbor, the president of the local homeowner association, to lead an effort to modernize a park in the neighborhood. The homeowner association will pay for all supplies and equipment, but all of the labor will come from residents in the neighborhood. You'vewalked the park with your neighbor to scope the project, and the two of you have put together the following information:

The wooden bandstand needs to be scraped and repainted. Residents would like to have a portable audiovisual system integrated into the bandstand to support a weekly movie night and other neighborhood social events. The president of the homeowners association has already asked a local AV expert and community residentto research and select an appropriate audiovisual system. Based on the estimated equipment cost, the president has decided to delaythe purchase and installation of the audio visual system until a later date (i.e., it will not be part of this project). However, he wants to go ahead with any bandstand infrastructure modifications needed to support the selected system. A subsequent meeting with the AV expert reveals the following: (1) the bandstand already has electrical outlets; (2) pads for four speakers will have to be mounted to the bandstand; (3) the structure of the bandstand will have to be modified to enable mountinga removable movie screen and create a space for an audio visual control station; and (4) the base of the bandstand will have to be modified to include a secure storage area for audio/visual equipment when not in use.

The playground area for younger children currently has a six-seat A-frame swing set. There is a broken weld joint at the top of one A-frame member that needs to be repaired, and the entire structure needs to be cleaned and repainted. All six seats and chains sets need to be replaced.

Residents would like to have a wooden play structure installed to replace a merry-go-round that had been removed a couple of years before. Residents would also like rubber mulch to be installed under and around the swing set and the play structure.

The koi pond used to be an attraction for residents. Since the aeration system failed several months ago, the fish died, and the pond has become overgrown with algae and other contaminants. Residents would like the pond to be restored to its former glory. You note the work scope will include draining, cleaning and refilling the pond; repairing the aeration system, and restocking the pond with fish.
Six park benches need to be cleaned, scraped and repainted. One or two may need some repairs.

The park currently has only two trash receptacles, and both have seen better days. The residents would like four new trash receptacles and four new recycling receptacles located throughout the park. Trash and recycling receptacles should be paired together.

There is a minimal grassy area, used for picnics, at one end of the park with one dilapidated picnic table. Residents would like the grassy area to expand in size to accommodate three picnic tables with benches. One new trash receptacle and one new recycle receptacle are to be located in this area as well as three new or refurbished picnic tables.

Some residents would like to be able to use the existing sports court for games like a corn-hole toss. Unfortunately, the court was initially built for bocce ball, and the few residents who play are very vocal and against any multi-purpose use of the court, typically citing potential damage to the turf. You and your neighbor decide the best solution would be to build a second identical court that could be used for other activities. Artificial turf will be installed in both courts to minimize damage to the playing surface.

Assumptions:

1. The neighborhood park is owned and managed by the homeowner association.

2. No permits or outside approvals are necessary to do the work.

3. The homeowner association has sufficient funding available to pay for material and equipment.

4. A WBS Dictionary will not be created. The WBS will be the only planning document available to other team members.

Assignment:

Based on the information provided above:

1. Create and present a work breakdown structure incorporating proper WBS core characteristics (except as noted below). The WBS may be presented in either a graphical or tabular format.

2. Decompose products/outcomes sufficiently to ensure all elements of the project scope are included, and non-scope elements are excluded.

3. For this assignment, include at least two work packages for each lowest level product/outcome. Work package descriptors should clearly support the identification of the work necessary to deliver the lowest-level product/outcome. Remember that a work package applies to only one organizational entity and typically addresses only one type of work. For example, digging a ditch and paving a section of the road would be two separate work packages. Each of these work packages could be further decomposed into component activities. For example, digging a ditch could be further decomposed into component activities like (1) marking underground utilities, (2) clearing trees and shrubs, (3) renting the ditch digging machinery, etc. Do not decompose work packages into their component activities

4. Include a hierarchical WBS numbering system; ensure all WBS elements are adequately identified in accordance with this system.

5. The WBS must clearly communicate the work scope and your intent with respect to how the project is to be structured. Work packages must be clearly distinguishable from products/outcomes.To achieve this requirement, you may deviate from WBS core characteristics with respect to how work packages are described.

6. Do not include any scheduling or resource information, task dependencies, or milestones.

Attachment:- Work Breakdown Structure Review.rar

Reference no: EM132606191

Questions Cloud

What is the present value : An investment will earn Php10000 at maturity. With a discount rate of 4%, what is the present value if you asked to be paid in advance of 6 months
Evaluation of learning outcomes on managerial accounting : A critical evaluation of your learning outcomes on managerial accounting, consider: How would you apply your new knowledge
What is the accrued interest expense on the note on october : On September 28, Assuming a 360-day year for your calculation, what is the Accrued Interest Expense on the Note on October 31?
What is the depreciation expense on the equipment on august : What is the Depreciation Expense on the equipment on August 31? On August 1, Warren Company placed into service equipment with a capitalized
Develop a work breakdown structure : PMAN 650 Work Breakdown Structure Review - develop a work breakdown structure in your professional careers
How much do you need to invest today : You are planning to retire in 35 years with $1,000,000. You can earn 4.0% compounded bi-monthly. How much do you need to invest today
What is the total capitalized cost of the equipment : What is the total Capitalized Cost of the equipment? On June 28, Carpenter Corporation purchased equipment with a purchase price of $35,090
Simplify the process of buying and selling : How does the existence of money simplify the process of buying and selling?
What is the amount of the required adjustment to allowance : If the Allowance for Doubtful Accounts had a $1,844 debit balance on July 29, what is the amount of the required adjustment to the Allowance on July 31?

Reviews

Write a Review

 

Project Management Questions & Answers

  Create a project schedule and align resources

Create a project schedule and align resources, Analyze project schedule and resource allocation

  Managerial roles and gap analysis

Write a report on Managerial Roles and Gap Analysis

  Questionaire on project management

Questionaire on Project Management

  Describe the market growth rate for product

Describe the market growth rate for product and service.

  Prepare a work plan and project schedule - gantt chart

Design an online system for the human resources department to manage available job positions.

  Project risk management approach

How does a project risk management approach pro-vide an early warning signal for impending problems or issues

  Black-scholes options pricing model

Calculate the payoff and the profits for investments

  Describe the features or characteristics of product

Describe the features or characteristics of your product or service.

  Write paper on inventory management system

Write paper on Inventory Management System.

  Analysis of the overall project risk

Analysis of the overall project risk

  Investment and performance analysis

Evaluate the usefulness of ROCE

  Distribution strategy and project management

Distribution strategy and project management

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd