Develop a fuzzy forecasting system using matlab

Assignment Help Simulation in MATLAB
Reference no: EM131000170 , Length:

Summary: The assignment aims at consolidating your knowledge base and developing practical skills to build a fuzzy system for forecasting the electricity price. The task is formulated as a time-series prediction problem for business application, and the goal is to model the behaviour of underlying dynamics of the electricity market. In principle, the merits of such a fuzzy forecasting system can be evaluated by two aspects:

- The number of fuzzy rules in the rule-base and the number of variables used in the antecedent part of the fuzzy rules (the smaller the better);

- System performance in terms of the accuracy (the smaller the better), i.e., the average relative error between your fuzzy system outputs and the actual outputs for both the training data set (learning capability) and the test data set (generalization capability).

This is an INDIVIDUAL assignment. You are NOT permitted to work as a group when completing this assignment. The length of the assignment report is about 750 words.

Problem Description (A Fuzzy System for Forecasting Electricity Price)

Develop a fuzzy forecasting system using Matlab Toolbox. The system performs a forecasting task for power marketing price. The data used in this assignment is from the real world (Queensland, Australia), and it has been split up into two parts, i.e., a training dataset which will be used to build your fuzzy forecasting system, and a testing dataset which will be used to evaluate your system performance in terms of generalization capability. The data sets can be downloaded from the Assignment directory in LMS.

Related Concept

Outliers: Roughly, an outlier is an observation that lies an abnormal distance from other values in a random sample from a population. You can read more about this concept via the links below:

https://www.itl.nist.gov/div898/handbook/prc/section1/prc16.htm
https://mathworld.wolfram.com/Outlier.html

System Inputs and Outputs

Let the temperature and total demand of electricity at time instant t be T(t) and D(t), respectively. The goal of the fuzzy forecasting system is to predict the RRP price by using some historical data as system inputs. In this assignment, the historical data set used for building the fuzzy system at time instant t is composed of a subset of the set M={T(t-2), T(t-1), T(t), D(t-2), D(t-1), D(t)}. The output of your system at time instant t is a forecasting value of the Recommended Retail Price (RRP) of electricity at the next time instant t+1, denoted by P(t+1).

Note that you should select a subset of the set M as the system's input variables by using correlation analysis.

Tasks Description (the maximum marks for each item below is 20)

- Remove outliers of the output variable from the datasets (both training and test), and give a list of the outliers; and then rebuild the training and the test datasets;

- Select appropriate values or fuzzy subsets for linguistic variables used in your fuzzy rules;

- List the fuzzy rules that are generated by using statistical analysis (correlation coefficients) with heuristics;

- Implement your fuzzy system using the Matlab Fuzzy Toolbox, where all membership functions involved in your system should be plotted clearly;

- Report your system performance in terms of the average relative error for both training and testing datasets, and analyze the effects of membership functions and defuzzification methods.

Remarks

- Assessment will be done by looking at the average relative prediction accuracy for both the training data set and the test data set.

- Either Mamdani-type or Sugeno-type fuzzy rules can be applied. The ANFIS tool will NOT be acceptable for carrying out this task.

- Your report should provide a commented list of the Matlab Commands used in your system with some graphical illustrations. It will be appreciated to show some fine-tuning of the system's parameters to produce sensible results. It is encouraged to appropriately use appendices to detail your results.


Attachment:- Assignment Data.rar

Verified Expert

Reference no: EM131000170

Questions Cloud

Determine the initial velocity of the ball : Determine the initial velocity (v0) of the ball soon after it leaves the hill-top. [i.e. find an expression for the velocity in terms of H, D0 and g.]
Explain the process you used to brand your product : Create a brand complete with logo, color, jingle or whatever you feel will entice your target consumer to purchase your product - write a two page paper explaining the process you used to brand your product.
The market price of the inventory on december 2011 : Prepare the necessary adjusting journal entry (if any is required) on December 31, 2011.
Find the magnitude of the tension t in the horizontal rope : The weight in the figure below hangs from a long board of negligible weight. (Let θ = 63.0o and W = 480 N.) Find the magnitude of the tension T in the horizontal rope.
Develop a fuzzy forecasting system using matlab : Develop a fuzzy forecasting system using Matlab Toolbox. The system performs a forecasting task for power marketing price. The data used in this assignment is from the real world and it has been split up into two parts.
Prepare the journal entries required on june 15 : Assume that the market price of the inventory related to the outstanding purchase commitment was $140,000 at June 30.
Determine the magnitude of force that rope exerts on knot : Use Newton's second law to determine the magnitudes of the forces that ropes 2 and 3 exert on the knot. Suppose that T1onK = 1000 N . Determine the magnitude of the force that rope 2 exerts on the knot. Express your answer to two significant figure..
What is the acceleration of the mass along the line : Suppose a mass m = 4 kg is subject to F1. What is the acceleration of the mass along the line L? What is the acceleration of the mass along x?
Determine the distance y to the centroid for the shaded : Determine the distance y' to the centroid for the shaded area measured from the x axis if a is 2.7 in. Determine the moment of inertia Ix for the shaded area about the x axis if a is 2.9 in

Reviews

Write a Review

Simulation in MATLAB Questions & Answers

  Calculate the stress intensity factor

Use the three-parameter zone finite element method or the boundary collocation method to calculate the stress intensity factor K, at the crack tip for the plate

  Build a simulation using newtons laws of motion

Build a new and different simulation of your own using Newtons laws of motion and Show the code and describe how it works

  Write the specification of load mover

Write the specification of LOAD MOVER detailed of the whole design and precise for automatic control section and divide the design into various modules and Is the kernel required if yes which one?

  Design the automatic control section using statecharts

Aim of this project is to design an embedded system which can move loads from one place to another. The system can be operated manually, automatically and wirelessly.

  Need an expert who can model a drill in simulink

Need an expert who can model a drill in Simulink. Working model of a drill needing for an improvment to behave more realistically as a drill to drill through plastic block.

  Project is on load frequency control using fpid

Project is on load frequency control using FPID tuned using GA and PSO algorithm and the system is a two area system.

  Number of packets received with time

Let x be the number of packets received with time -

  Build a matlab based graphical user interface

Build a Matlab based graphical user interface (GUI) that operates in conjunction with a base Matlab/ Simulink simulation program. Any base simulation is considered acceptable.

  Build a matlab based graphical user interface

Build a Matlab based graphical user interface (GUI) that operates in conjunction with a base Matlab/ Simulink simulation program. Any base simulation is considered acceptable.

  Simulate the standardised sum of independent

Simulate the standardised sum of independent and identically distributed variates - Fit a linear regression model as in Q5, and plot your estimates for β0 and β1 as N increases, together with a line indicating their true values. Supply your code.

  Plot the original periodic square wave

Plot the original periodic square wave on the same graph. Comment on the difference between the original periodic square wave and its truncated Fourier series presentation.

  Use matlab to plot the function

Plot the original periodic square wave on the same graph. Comment on the difference between the original periodic square wave and its truncated Fourier series presentation.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd