A fireplace arch is to be constructed in the shape of a semi ellipse. The opening is to have a height of 40 inches at the center and a width of 82 inches along the base. To sketch the outline of the fireplace, the contractor uses a 82-inch string tied to two thumbtacks. Where the thumbtacks should be placed.
Answers
1. 21 inches on either side of the center
2. 7 inches on either side of the center
3. 20 inches on either side of the center
4. 9 inches on either side of the center
Kernel of phi, Let phi is a homomorphism from Z30 onto a group order 3
Suppose a shock causes a unit damage to the machine with probability 0.1 and no damage with probability of 0.9. Successive shocks are independent. Suppose the damages are cumulative and the machine can withstand at most four units of damage
A person walks 18m East and then 32m in a direction of 65 degrees N of E. What is the resultant displacement?
From central parking it is 9/10 of a mile to the science building. Bob started at central parking and walked 1/5 of a mile toward the science building. He stopped for coffee.
Write mathematical expression for the given statement and Solve and find the value of unknown.
Question about Joint probability· Calculate probabilities and joint probabilities on the events of driving to work everyday for 10 days. Identify the meaning of independent and dependent of this event
Determine the population proportion
Once you have the graph of a line, how can you find its slope? Does it matter which points you choose to find the slope? Does the slope vary depending on your choice of points?
A study showed that there are 17 vehicles for every 10 households. how many vehicles are there for 106 million households?
Prove that the regression line passes through the centroid
Solve the problem of Critical Path and PERT. A PERT project has 45 activities, 19 of which are on the critical path. The estimated time for the critical path is 120 days. The sum of all activity variances is 64, while the sum of variances along the..
If the annual proportion of erroneous income tax returns filed with the IRS can be looked upon as a random variable having a beta distribution with α= 2 and β = 9,
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd