A new sponge iron factory has an annual capacity of 100,000 tons/year of Iron production. Benzopyrene is produced during this process at a rate of 0.00006% of Iron produced. Due to high temperatures, 0.0003% Benzopyrene goes into the air. The space volume where iron smelting occurs is 100 m x 70 m x 7 m.

(a) The natural air flow rate to this industrial shade structure is 90 m3/hour. Determine the risk to the workers who work 8 hours/day, 50 weeks/year for 30 years. Assume workers are 75 kg and live for 70 years.

(b) What flow rate do you need to reduce the risk by 95%?

Reference no: EM13561568

Questions Cloud

Check the shear resistance of this beam : A W14x34 section is used as a simply supported beam over a span of 20 ft. The beam is loaded with a concentrated live load of 10 kips at the center of its span, in addition to its own weight.
Suggest a hen managentment strategy that will maximize : A polutry farm owns 100 laying hens. Each week a hen can either lay 12 eggs or hatch 4 eggs, but not both. At the end of the four-week period all eggs and chicks will be sold: an egg will bring 10 cents, and a chick will bring 60 cents.
Descriptive material has negligible value : Descriptive material has negligible value and should be avoided. We are seeking analysis, discussion and recommendation, enriched by ideas found in journal articles.
Determine the lifetime risk of a resident : Consider a small town in the Phillippines, where the average weight of people is 55 kg, and the average lifespan is 60 years. The people here eat lots of fish due to abundant availability from the local river.
Determine the risk to the workers who work 8 hours/day : The natural air flow rate to this industrial shade structure is 90 m3/hour. Determine the risk to the workers who work 8 hours/day, 50 weeks/year for 30 years. Assume workers are 75 kg and live for 70 years.
Can you find bod10 from this test : During a BOD test, 2 mL of waste water having a DO of 0 was mixed with 298 mL of dilution water having a DO of 8.9 mg/L. After 5 days and 20 days, it was noted that the DO of the test bottle was 4.0 and 2.5 respectively,
Make a preliminary estimate of the length and elevation : A 5-ha residential development with 0.4-ha lots is to be drained such that the first 25mm of runoff is retained onsite and the postdevelopment peak discharge rate from the site is not to exceed 1m^3/s for thje 25-year 1-d rain event. The natural soil..
The peak time is 1 hour and the recession times is 2 hours : Route a trianglular hydrograph through a 100 foot wide rectangular channel with a bed slope of 0.015 and a Mannings n of 0.035.  Take a distance between cross-sections of 3000 ft.
Determine their common velocity just after the collision : A steel column has a total unbraced height of 14 ft and carries an axial LRFD load of 950 kips. The column ends are fixed. Select an economical HSS 14x14 for this column.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Compute minimum footing width required to maintain safety

a bearing wall carries a dead load of 120kn/m and live load of 100 kn/m. It is to be supported on a 400mm deep continuous footing underlain by a medium sand (unit weight = 19.2 kn/m3, phi= 37 deg, effective c = 0).

  Determine v and the time of the flight with initial velocity

The skateboard rider leaves the ramp at A with an initial Velocity Va at a 30 degree angle. If he strikes the ground at B, determine Va and the time of the flight. x=5.1m

  What will be change in partial pressure of carbon dioxide

A stack gas at 1.1 atmospheric pressure has a mixture below. what will be the change in partial pressure of carbon dioxide if the gas temperature is lowered from 2000 degrees K to 1000 degrees K

  Determine the post construction vertical stress imposed

Determine the preconstruction and post construction vertical stress imposed on the soil at a point 2 m below the center of the foundation area (assume westergaard conditions applied)

  Compute the flow rate in the channel in the jump

A hydraulic jump occurs in a rectangular channel 4.0 m wide. The water depth before the jump is 0.4 m and after the jump is 1.7 m. Compute the flow rate in the channel, the critical depth and the headloss in the jump.

  Determine the flow of vehicles on the level section

From an aerial photograph, one observes that on a level section of a (multilane) highway, 25% of the vehicles are trucks, 75% are cars, and there are 50 vehicles per mile of highway. The trucks travel at 40 mph and the cars at 60 mph.

  Determine the normal stress in each portion of the rod

A polystyrene rod consisting of two cylindrical portions AB and BC is restrained at both ends and supports two 6 kip loads. Knowing that E = 0.45 * 10^6 psi,

  Determine time required to reach temperature of panel

A 3-mm thick panel (1 m x 1 m) of aluminum alloy (k = 177 W/m. K, Cp = 875 J/kg. K, and p(rho)= 2770 kg/m3) is heated in a large oven with air at T = 175oC and a convective heat transfer coefficient of h = 40 W/m2.K.

  Calculate consolidation settlement caused by weight of fill

An 8.5 m compacted fill is to be placed over the soil profile. Consolidation tests on samples from points A and B produced the following results. a) Calculate the consolidation settlement caused by the weight of this fill.

  Determine the additional normal force exerted by the ground

Each wheel of an automobile has a weight of 48 lb, a diameter of 23 in., and a radius of gyration of 9 in. The automobile travels around an unbanked curve of radius 450 ft at a speed of 65 mi/h.

  Finding average time in system

If the time required to pay for parking is exponentially distributed with a mean of 15 seconds, find the average time in system.

  Explain how these effects were initiated

Is it possible (in this part of the world) for the sun to ever shine directly upon the OUTSIDE of a NORTH-facing wall of a home or other building? If so when?

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd