Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A test of a driver’s perception/reaction time is being conducted on a special testing track with wet pavement and a driving speed of 55 mph. When the driver is sober, a stop can be made just in time to avoid hitting an object that is first visible 520 ft ahead . After a few drinks under exactly the same conditions, the driver fails to stop in time and strikes the object at ta speed of 35 mph. Determine the drivers perception/reaction time before and after drinking (assume practical stopping sight distance).
Explain CBR method of pavement design with one example.
A piston-cylinder device initially contains 1.4 kg saturatedliquid water at 200 C. Now heat is transferred to the wateruntil the volume quadruples, and the cylinder contains saturatedvapor only
A proposal has been submitted to replace a group of assembly workers, each working individually, with an assembly line. The following table gives the individual work elements. The demand rate for this job is 1600 units/week (assume 40h/week)
Transportation network, A power generator at a dam can send 300 megawatts to substation 1, can send 200 megawatts to substation 2, and can send 250 megawatts to substation 2
It the mean annual runoff of a drainage basin of 10000 km^2 is 140 m^3/s, and the average annual precipitation is 105 cm, estimate the ET losses for the area in 1 year. What are your assumptions
A person on the moon wishes to determine the mass of a rock. He has a spring scale calibrated to read pounds mass at a location where the acceleration of gravity is 32.186 ft/s 2 . The rock gives a reading of 18.76 on this scale.
River A has a flow rate of 3.0 m^3/sec. Stream B discharges into the river at a flow rate of 0.05 m^3/sec. to study mixing of the stream and river, a conservative tracer is to be added to stream B
Concrete pier is loaded on top with a uniformly distributed load of600 lbs per square foot. Investigate the state of stressat a level of 4 ft. above the base.
If a source of groundwater gets contaminated with a DNAPL and another one gets contaminated with a LNAPL, which one will be harder to remediate and why ?
Calculate the peak bending moment for the 4x10 roof beam. Then draw a clear dimensioned FBD for the two exterior bearing walls above the floor joists, no moment calcs here.
A temporary diversion has been constructed on a highway of +4 percent gradient due to major repairs that are being undertaken on a bridge. The maximum speed allowed on the diversion is 10 mph
An element of aluminium in a form of a rectangular parallel pipe has a length 'a' along the x axis of 5.5 in, a length 'b' on the y axis of 4.5 in. Determine the maximum shear stress in the material,the change in length.
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd